HomeMy WebLinkAbout4356-1GENERAL NOTES
I. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE
CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS FOR THE PUBLIC WORKS CONSTRUCTION ("GREEN
BOOK"). ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL BE THE LATEST EDITION UNLESS OTHERWISE
NOTED.
2. WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CON NOT BE RESOLVED
BY REFERENCE TO PRECEDENCE PROVISIONS IN THE GREEN BOOK , THE CONTRACTOR SHALL IMMEDIATELY
REPORT SAID CONFLICT TO THE CITY ENGINEER FOR RESOLUTION.
3. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER.
4. CONSTRUCT PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY' DEVELOPMENT DEPARTMENT,
ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT
LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC RIGHT OF WAY WITH IN THE CITY
LIMITS. CALL (909) 350-7610.
5. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS, AND PROCEDURES DESCRIBED
IN THE STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON -METRIC EDITION UNLESS OTHERWISE
DIRECTED BY THE CITY TRAFFIC ENGINEER.
6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS, OR OTHER
TRAFFIC CONTROL DEVICES AT ALL TIMES.
7. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR TRENCHES 5 FEET
OF GREATER IN DEPTH FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY.
8. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE GUARDED BY
SHORING, SLOPING OF THE GROUND, OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS OF THE
DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA. TRENCHES LESS THAN FIVE (5) FEET SHALL
ALSO BE GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND MOVEMENT.
9. NO MATERIAL OF EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT OBTAINING A SEPARATE
PERMIT FOR THAT PURPOSE.
10. THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION, HOWEVER, IT
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND
ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTION TO AVOID DAMAGE THERETO. THE
CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT 1-800-227-2600 TWO WORKING DAYS BEFORE
EXCAVATION.
11. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT LIMITED
TO , GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER,
RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL, AND CALTRANS. ALL UTILITY COMPANIES SHALL BE
GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACILITIES.
12. THE CONTRACTOR SHALL NOT OPERATE AND FIRE HYDRANT OR WATER MAIN VALVES WITHOUT APPROPRIATE
AGENCY AUTHORIZATION. CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR VALVE
OPERATION AND WATER REQUIREMENTS.
13. STATIONING REFERS TO THE CENTERLINE OF SEWER EXCEPT WHERE OTHERWISE NOTED.
14. ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO
CONSTRUCT THE WORK TO THE PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE
PRESERVATION OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION.
15. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES, OR BENCH MARKS
WITHOUT PRIOR NOTIFICATION TO THE CITY ENGINEER.
16. REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT TIES,
AND BENCH MARKS, SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR. SURVEY
MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS CONSTRUCTION SHALL BE REPLACED. THE
CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO MONUMENTS
CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT.
17. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESS AT ALL TIMES. A MINIMUM 12
FOOT LANE SHALL BE MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDENTS AND EMERGENCY
VEHICLES.
18. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING ADEQUATE
WATERING AT ALL TIMES.
19. THE CONTRACTOR SHALL NOT CAUSE AND EXCAVATION MATERIAL, MUD, SILT, OR DEBRIS TO BE DEPOSITED INTO
PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT PRIOR
WRITTEN APPROVAL.
20. NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR.
21. A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE REQUIRED
DENSITY SHALL REQUIRE RE -WORKING OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED DENSITY IS
OBTAINED.
22. CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM UNDERMINING STREET
IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY NON-ERODABLE
SWALES ENTERING OR LEAVING IMPROVEMENTS.
23. ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR, AND FINISH TO MATCH EXISTING
CONCRETE.
24. IF SEWER CONSTRUCTION IS TO BE DONE IN PHASES, THE CONTRACTOR SHALL PROVIDE A TERMINAL CLEANOUT
AT THE PHASE BOUNDARY, NOT MORE THEN 150 FEET FROM THE DOWNSTREAM MANHOLE. SEE CITY OF
FONTANA STANDARD DETAIL FOR TERMINAL CLEANOUT.
25. SANITARY SEWER LINES SHALL BE CONSTRUCTED OF BELL AND SPIGOT OR BAND SEAL TYPE VITRIFIED CLAY
PIPE (V.C.P.) EXTRA STRENGTH CLASS AND SHALL CONFORM TO THE PROVISIONS OF THE ASTM DESIGNATION
C700 FOR V.C.P..
26. NO OPEN TRENCH SHALL BE ALLOWED AT THE END OF THE DAY WITHOUT PRIOR APPROVAL OF THE CITY
ENGINEER.
27. SHORT VCP STUBS WITH FLEXIBLE COMPRESSION JOINTS SHALL BE USED AT MANHOLE WALLS TO ALLOW FOR
MINOR DEFLECTIONS IN ALIGNMENT.
28. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL EXPOSE EXISTING FACILITIES, AND VERIFY ELEVATION AND
LOCATION OF CONNECTIONS. CITY APPROVAL OF CONNECTIONS TO EXISTING FACILITIES DOES NOT IMPLY
CORRECTNESS OF ELEVATIONS OR LOCATIONS SHOWN ON THE PLANS.
29. ALL 4 HOUSE LATERALS SHALL BE INSTALLED AT A 2% MINIMUM GRADE UNLESS OTHERWISE APPROVED BY THE
N CITY ENGINEER.
30. TERMINATE ALL 4 HOUSE SEWER LATERALS 3 FEET INSIDE THE LOT WITH PLUG 12 BELOW THE GROUND
n SURFACE. WHEN PUBLIC UTILITY EASEMENTS EXIST NEXT TO THE STREET RIGHT OF WAY, THE LATERAL SHALL
TERMINATE 3 FEET INSIDE THE LOT AS MEASURED FROM THE UTILITY EASEMENT.
CLn
r
r
I
Underground Service Alert BENCH MARK REV.
0
1 SAN BERNARDINO COUNTY HIGHWAY MONUMENT NO.
165B CHISELED CROSS ON EASTERLY END OF EXISTING
'VGn Call: TOLL FREE CURB AND GUTTER AT S.W. CORNER OF ARROW ROUTE
AND ALMERIA AVENUE.
z 1- Q 00
ELEVATION = 1244.639
0
0 BASIS OF BEARING
IIII
227-
260
o BASIS OF BEARING IS THE CENTERUNE OF ARROW
TWO WORKING DAYS ROUTE, BEING N 89'41'29" E PER PARCEL MAP NO.
J BEFORE YOU DIG 16005, P.M.B. 200/8-9.
7VLAIIMPOVCMEN
INDEX MAP
NOT TO SCALE
31. THE SEWER CONTRACTOR SHALL STAMP AN "S" IN THE FACE OF THE CURB AT THE LOCATION OF THE SEWER
LATERAL.
32. IF EXISTING UTILITIES OR ANY OTHER FACILITIES CONFLICT WITH THE PROPOSED IMPROVEMENTS, THE
CONTRACTOR SHALL NOTIFY THE ENGINEER AND ALL AFFECTED AGENCIES IMMEDIATELY.
33. NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING. STEEL HAVE BEEN PLACED, INSPECTED,
AND APPROVED.
34. ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED, APPROVED PRIOR TO PAVING OF STREETS.
35. APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT.
36. ALL MANHOLES, CLEANOUT FRAMES, COVERS, AND VALVE BOXES SHALL BE RAISED TO FINISH GRADE BY THE
PAVING CONTRACTOR UPON COMPLETION OF PAVING.
37. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES, AND
OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER.
38. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL
PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER.
REVISION DESCRIPTION
DATE I ENGR. I CITY I DATE
SHOUM OF TM &IMOVBWEM
NOT COMbB4W VWM TWO YEARS OF TM DATE OF
APPROVAL SHOWN LEON APD CAS FOM N A
DLIGENT MANS„ THE CITY MAY RE AM
FEVNWM TO THE PLANS TO BRNO TFBIA INTO
CONFORMANCE WffH CONDffX)NS APD STAPDAMS N EFFECT.
THIS PLAN SHEET
SUPERSEDES PREVIOUSLY
APPROVED PLAN No. 1488,
APPROVED ON 12/11/87.
CONSTRUCTION NOTES AND QUANTITIES
ITEM
DESCRIPTION
QUANTITY
w
CONSTRUCT 8' VCP SEWER MAIN EXTRA STRENGTH VCP WITH COMPRESSION JOINTS
1209
LF
O
CONSTRUCT 4' STANDARD PRECAST MANHOLE PER CIN OF FONTANA STD. 2001
5
EA
O
CONSTRUCT 4' VCP SEWER LATERAL
2
EA
O
CONSTRUCT 8' VCP STUB AND PLUG
3
EA
O
INSTALL 8" VCP WI1H SPECIAL CONCRETE ENCASEMENT PER DETAIL ON SHEET 2.
20
LF
O
FOOTHILL
BLVD
LF
O
INSTALL SEWER CLEANOUT PER CIN OF FONTANA STD. 2004
1
EA
O
EXCAVATE USING STANDARD TRENCH REPAIR PER CIN OF FONTANA STD. 1008.
ROUTE 66
LF
O
REMOVE AND REPLACE EXISTING CROSS GUTTER
90
LF
¢
FLOW UNE
TW
TOP OF WALL
TF
TOP OF FOOTING
�
w
w
>
L
J
¢
¢
Q
¢
w
�
z
w
�
W
¢
w
w
z
¢
w
Q
Z
¢
w
w
z
w
>
¢
w
J
z
z
10
Q
1:
1:
ARROW
BOULEVARD
ARROW BOULEVARD
_
�
w
W
U
Z
�
W
SEE SHEET 3
J
0
VALENCIA
COURT_
VALENCIA AVENUE
CERES AVENUE
SEE SHEET
2
w
MERRILL AVENUE
<r -
CM �
�P�P
INDEX MAP
NOT TO SCALE
31. THE SEWER CONTRACTOR SHALL STAMP AN "S" IN THE FACE OF THE CURB AT THE LOCATION OF THE SEWER
LATERAL.
32. IF EXISTING UTILITIES OR ANY OTHER FACILITIES CONFLICT WITH THE PROPOSED IMPROVEMENTS, THE
CONTRACTOR SHALL NOTIFY THE ENGINEER AND ALL AFFECTED AGENCIES IMMEDIATELY.
33. NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING. STEEL HAVE BEEN PLACED, INSPECTED,
AND APPROVED.
34. ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED, APPROVED PRIOR TO PAVING OF STREETS.
35. APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT.
36. ALL MANHOLES, CLEANOUT FRAMES, COVERS, AND VALVE BOXES SHALL BE RAISED TO FINISH GRADE BY THE
PAVING CONTRACTOR UPON COMPLETION OF PAVING.
37. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES, AND
OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER.
38. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL
PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER.
REVISION DESCRIPTION
DATE I ENGR. I CITY I DATE
SHOUM OF TM &IMOVBWEM
NOT COMbB4W VWM TWO YEARS OF TM DATE OF
APPROVAL SHOWN LEON APD CAS FOM N A
DLIGENT MANS„ THE CITY MAY RE AM
FEVNWM TO THE PLANS TO BRNO TFBIA INTO
CONFORMANCE WffH CONDffX)NS APD STAPDAMS N EFFECT.
THIS PLAN SHEET
SUPERSEDES PREVIOUSLY
APPROVED PLAN No. 1488,
APPROVED ON 12/11/87.
CONSTRUCTION NOTES AND QUANTITIES
ITEM
DESCRIPTION
QUANTITY
O7
CONSTRUCT 8' VCP SEWER MAIN EXTRA STRENGTH VCP WITH COMPRESSION JOINTS
1209
LF
O
CONSTRUCT 4' STANDARD PRECAST MANHOLE PER CIN OF FONTANA STD. 2001
5
EA
O
CONSTRUCT 4' VCP SEWER LATERAL
2
EA
O
CONSTRUCT 8' VCP STUB AND PLUG
3
EA
O
INSTALL 8" VCP WI1H SPECIAL CONCRETE ENCASEMENT PER DETAIL ON SHEET 2.
20
LF
O
CONSTRUCT 8" VCP SEWER LATERAL AND PLUG
62
LF
O
INSTALL SEWER CLEANOUT PER CIN OF FONTANA STD. 2004
1
EA
O
EXCAVATE USING STANDARD TRENCH REPAIR PER CIN OF FONTANA STD. 1008.
1209
LF
O
REMOVE AND REPLACE EXISTING CROSS GUTTER
90
LF
QUANTITIES SHOWN ON THESE PLANS ARE FOR ESTIMATING PURPOSES ONLY. CONTRACTOR
SHOULD RUN THEIR OWN QUANTITIES AND BID A COMPLETE JOB.
'OV
FESS%pti..
STEPHEN W.
S Z:
1Cn CCIVIL
Z �C
1FORN�P
coet
WoU SI��1i�3S 01A SC.
Ai f�tG • 331.61Qo
TAx 62G-'S3A•Gtc G
N
LEGEND
PROPERTY BOUNDARY UNE
FS
FINISHED SURFACE
CENTER UNE
GB
GRADE BREAK
- -
FLOW LINE
HP
HIGH POINT
-160-
CONTOUR
R
PROPERTY UNE
m
RETAINING WALL
RW
RIGHT OF WAY
BW
BACK OF WALK
SD
STORM DRAIN
FF
FINISHED BOOR
SW
SEWER
FG
FINISHED GRADE
TC
TOP OF CURB
FH
FIRE HYDRANT
TG
TOP OF GRATE
FL
FLOW UNE
TW
TOP OF WALL
TF
TOP OF FOOTING
UTILITY PURVEYORS:
ELECTRICITY
SOUTHERN CALIFORNIA EDISON CO.
DISTRIBUTION PLANNING
7951 REDWOOD AVENUE
FONTANA, CA 92335
(909) 357-6240
CONTACT RON CARDENAS
AGM
SOUTHERN CALIFORNIA GAS CO.
DISTRIBUTION PLANNING
16231 VALLEY BOULEVARD
FONTANA, CA 92335
(909) 428-8407
CONTACT: DAVE PADILLA
Development Resource Conoultan* Inc.
oQRpFESS/p� Civil Engineering • Land Surveying • Land Planning
p A U l 80 S. ROCHESTER AVE., SUITE 4C, ONTARIO, CA 91761-8171
230 -5241 -PH (909) 230 -5246 -FAX
� �, y z
c� #- MA
m cn No. 41308 m r:T,'
* Exp. 3/31 /09 * ,/ (Z
(C)?
sjgT�. C V ��� STE E REINER, P.E. R.C.E. 41308 DATE
OC
Designed by: Drawn by:- Checked by.
MW MW SR
SEKR
CITY OF FONTANA
8353 SIERRA AVENUE 3939 EAST CORONADO STREET 2ND FLOOR
FONTANA, CA 92335 ANAHEIM, CA 92806
(909) 350-6632 (951) 359-2255
CONTACT: LEE CORBY
QHMIDEVELOPER WATER
SAN GABRIEL VALLEY WATER COMPNAY FONTANA WATER COMPANY
11142 GARVEY AVENUE 8440 NUEVO AVENUE
EL MONTE, CA 91733 FONTANA, CA 92225
(626) 448-6183 (909) 822=2201
CONTACT: FRANK LOGUIDICE
CITY OF FONTANA, CALIFORNIA
PUBLIC SANITARY SEWER IMPROVEMENT PLANS
DRAWNMW ARROW BOULEVARD AND SCALE: ".T.S.
o`�`"m TOI<s�.Yv AVENUEMW oar OCT. zoos
owc. No.CHECKED BY: OVED BY:
7 -:�, alzc_�/ i. 9 4356 -OF
V
M
ti
GI