HomeMy WebLinkAboutHunter's Ridge Hydrology Study�J
LI
L
L
' HUNTERS RIDGE
HYDROLOGY STUDY
u
' PREPARED FOR : FIRST CITIES PROPERTIES
H"
d lll�ll
D
1�
JULY 14, 1988
JN : 364001
H
****************************************************************************
RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE
(Reference: 1986 SAN BERNARDINO CO. HYDROLOGY CRITERION)
Copyright 1983,86,87 Advanced Engineering Software (aes)
N� Ver. 4.1C Release Date: 5/11/87 Serial # 100937
~� Especially prepared for:
R� J.P. KAPP & ASSOCIATES, INC.
DESCRIPTION OF STUDY **************************
* HUNTERS RIDGE HYDROLOGY *
*
Q� *
��* *
**************************************************************************
FILE NAME: HUNTERS.DAT
TIME/DATE OF STUDY: 13:50 7/14/1988
============================================================================
USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION:
-- *TIME-OF-CONCENTRATION MODEL*--
0� USER SPECIFIED STORM EVENT(YEAR) = 25.00
SPECIFIED MINIMUM PIPE SIZE(INCH) = 18.00
SPECIFIED .PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE = 1.00
0� *USER-DEFINED LOGARITHMIC INTERPOLATION USED FOR RAINFALL*
10-YEAR STORM 60-MINUTE INTENSITY(INCH/HOUR) = 1.200
100-YEAR STORM 60-MINUTE INTENSITY(INCH/HOUR) = 1.700
COMPUTED RAINFALL INTENSITY DATA:
N� STORM EVENT = 25.00 1-HOUR INTENSITY(INCH/HOUR) = 1.3716
SLOPE OF INTENSITY DURATION CURVE = .7000
****************************************************************************
0J FLOW PROCESS FROM NODE 2.00 TO NODE 3.00 IS CODE = 2
-----------------------------------------------
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
8� NATURAL POOR COVER
TC = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]** .20
U�
INITIAL SUBAREA FLOW-LENGTH = 1850.00
«� UPSTREAM ELEVATION = 2352.00
DOWNSTREAM ELEVATION = 2160.00
U� ELEVATION DIFFERENCE = 192.00
TC = .525*[( 1B50.00** 3.00)/( 192.00)]** .20 = 16.742
25 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.352
SOIL CLASSIFICATION IS "A"
NATURAL POOR-COVER "BARREN" SUBAREA LOSS RATE, Fm(INCH/HR) = .4100
SUBAREA RUNOFF(CFS) = 38.92
TOTAL AREA(ACRES) = 14.70 PEAK FLOW RATE(CFS) = 38.92
0
�
****************************************************************************
FLOW PROCESS FROM NODE 1.00 TO NODE 2.00 IS CODE = 2
�-__________________________________________________________________________
- >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
============================================================================
I DEVELOPMENT IS SINGLE FAMILY RESIDENTIAL -> .4 DWELLING/ACRE
TC = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]** .20
INITIAL SUBAREA FLOW-LENGTH = 1100.00
UPSTREAM ELEVATION = 2680.00
DOWNSTREAM ELEVATION = 2352.00
ELEVATION DIFFERENCE = 328.00
U�TC = .487*[( 1100.00** 3.00)/( 328.00)]** .20 =
25 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.737
SOIL CLASSIFICATION IS "A"
N�
I RESIDENTIAL-> .4 DWELLING/ACRE SUBAREA LOSS RATE,
m� SUBAREA RUNOFF(CFS) = 37.21
10.214
Fm(INCH/HR) = .8730
TOTAL AREA(ACRES) = 10.70 PEAK FLOW RATE(CFS) =
37.21
****************************************************************************
FLOW PROCESS FROM NODE 2.00 TO NODE 4.00 IS CODE = 3
�-__________________________________________________________________________
m� >>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
~~ DEPTH OF FLOW IN 21.0 INCH PIPE IS 13.1 INCHES
PIPEFLOW VELOCITY(FEET/SEC.) = 23.6
UPSTREAM NODE ELEVATION = 2352.00
0� DOWNSTREAM NODE ELEVATION = 2090.00
FLOWLENGTH(FEET) = 2400.00 MANNINGS N = .013
ESTIMATED PIPE DIAMETER(INCH) = 21.00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) = 37.21
TRAVEL TIME(MIN.) = 1.69 TC(MIN.) = 11.91
**************************************************************************
FLOW PROCESS FROM NODE 4.00 TO NODE 4.00 IS CODE = 8
___________________________
t >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
==========================================================================
25 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.255
H� SOIL CLASSIFICATION IS "A"
RESIDENTIAL-> 1 DWELLING/ACRE SUBAREA LOSS RATE, Fm(INCH/HR) = .7760
SUBAREA AREA(ACRES) = 14.40 SUBAREA RUNOFF(CFS) = 45.09
EFFECTIVE AREA(ACRES) = 25.10
U� AVERAGED Fm(INCH/HR) = .817
TOTAL AREA(ACRES) = 25.10
PEAK FLOW RATE<CFS> = 77.65
U� TC(MIN) = 11.91
��
��***
FLOW PROCESS FROM NODE 4.00 TO NODE 5.00 IS CODE = 3
------- ---- ---- ---- -- ---- ---- -- ---- -����������������
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED P%PESIZE (NON-PRESSURE FLOW)<<<<<
DEPTH OF FLOW IN 27.0 INCH PIPE IS 17.6 INCHES
PIPEFLOW VELOCITY(FEET/SEC.) = 28.3
UPSTREAM NODE ELEVATION = 2090.00
n �DOWNSTREAM NODE ELEVATION = 1948.00
FLOWLENGTH(FEET) = 1300.()0 MANNINGS N = .013
N�ESTIMATED PIPE DIAMETER(INCH) = 27.00 NUMBER OF PIPES = 1
0�
PIPEFLOW THRU SUBAREA(CFS) = 77.65
TRAVEL TIME(MIN.) = .77 TC(MIN.) = 12.67
****************************************************************************
FLOW PROCESS FROM NODE 5.00 TO NODE 5.00 IS CODE = 8
�--__________________________________________________________________________
>>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================
25 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.073
U� SOIL CLASSIFICATION IS "A"
RESIDENTIAL-> 2 DWELLINGS/ACRE SUBAREA LOSS RATE, Fm(INCH/HR) = .6790
SUBAREA AREA(ACRES) = 12.20 SUBAREA RUNOFF(CFS) = 37.27
N� EFFECTIVE AREA(ACRES) = 37.30
AVERAGED Fm(INCH/HR) = .772
TOTAL AREA(ACRES) = 37.30
U� PEAK FLOW RATE(CFS) = 110.82
TC(MIN) = 12.67
**************************************************************************
FLOW PROCESS FROM NODE 5.00 TO NODE 6.00 IS CODE = 3
____------------------------
l: >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
==========================================================================
DEPTH OF FLOW IN 30.0 INCH PIPE IS 20.4 INCHES
PIPEFLOW VELOCITY(FEET/SEC.) = 31.2
UPSTREAM NODE ELEVATION = 1948.00
DOWNSTREAM NODE ELEVATION = 1815.00
U� FLOWLENGTH(FEET) = 1180.00 MANNINGS N = .013
ESTIMATED PIPE DIAMETER(INCH) = 30.00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) = 110.82
TRAVEL TIME(MIN. ) = .63 TC(MIN. ) = 13.30
**************************************************************************
N� FLOW PROCESS FROM NODE 6.00 TO NODE 6.00 IS CODE = 8
____________________________________________________________________________
>>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
m� 25 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.937
SOIL CLASSIFICATION IS "A"
U� COMMERCIAL SUBAREA LOSS RATE, Fm(INCH/HR) = .0970
SUBAREA AREA(ACRES) = 1.50 SUBAREA RUNOFF(CFS) = 5.18
EFFECTIVE AREA(ACRES) = 38.80
U� AVERAGED Fm(INCH/HR) = .746
TOTAL AREA(ACRES) = 38.80
PEAK FLOW RATE(CFS) = 111.44
TC(MIN) = 13.30
**************************************************************************
FLOW PROCESS FROM NODE 7.00 TO NODE 7.00 IS CODE = 1
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
RAINF IME OF CONCENTRATION(MINUTES) = 14.11
INTENSITY (INCH./HOUR) = 3.78
EFFECTIVE STREAM AREA(ACRES) = 42.80
TOTAL STREAM AREA(ACRES) = 42.80
L PEAK FLOW RATE(CFS) AT CONFLUENCE = 118.60
**************************************************************************
FLOW PROCESS FROM NODE 8.00 TO NODE 9.00 IS CODE = 2
__________________________________________________________________________
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
NATURAL POOR COVER
TC = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]** .20
u� INITIAL SUBAREA FLOW-LENGTH = 1200.00
11 UPSTREIM ELEVATION = 1950.00
DOWNSTREAM ELEVATION = 1815.00
ELEVATION DIFFERENCE = 135.00
TC = .525*[( 1200.00** 3.00)/( 135.00)]** .20 = 13.855
25 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.827
U� SOIL CLASSIFICATION IS "A"
NATURAL E B
R� POOR COVER "BARREN" SUBAREA LOSS RATE. Fm(INCH/HR) = .4100
�'��_'_ �-_. -- _ -''_ '
SUBAREA RUNOFF(CFS) = 14.14
8� TOTAL AREA(ACRES) = 4.60 PEAK FLOW RATE(CFS) = 14.14
��
EFLOW
PROCESS FROM NODE 6.00 TO NODE 7.00 IS
_
CODE = 3
____________
__________________________________________
_ _ _ _____ _ _ _____
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE
FLOW)<<<<<
DEPTH OF FLOW IN 30.0 INCH PIPE IS 23.7 INCHES
PIPEFLOW VELOCITY(FEET/SEC.) = 26.8
Q�UPSTREAM
NODE ELEVATION = 1815.00
DOWNSTREAM NODE ELEVATION = 1712.00
FLOWLENGTH(FEET) = 1300.00 MANNIN8S N = .013
ESTIMATED PIPE DIAMETER(INCH) = 30.00 NUMBER OF
PIPES = 1
N,
PIPEFLOW THRU SUBAREA (CFS) = 111.44
TRAVEL TIME(MIN.) = .81 TC(MIN.) = 14.11
FLOW PROCESS FROM NODE 7.00 TO NODE 7.00 IS
---- _------- _---- _---- _____---- ____ ---- _____---- ____
CODE = 8
---- __________________
>>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================
25 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.778
U�
SOIL CLASSIFICATION IS "A"
MOBILE HOME PARK SUBAREA LOSS RATE, Fm(INCH/HR) = .2425
SUBAREA AREA(ACRES) = 4.00 SUBAREA RUNOFF(CFS)
= 12.73
U�
EFFECTIVE AREA(ACRES) = 42.80
AVERAGED Fm(INCH/HR) = .699
U�
TOTAL AREA(ACRES) = 42.80
PEAK FLOW RATE(CFS) = 118.60
~~
TC(MIN) = 14.11
**************************************************************************
FLOW PROCESS FROM NODE 7.00 TO NODE 7.00 IS CODE = 1
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
RAINF IME OF CONCENTRATION(MINUTES) = 14.11
INTENSITY (INCH./HOUR) = 3.78
EFFECTIVE STREAM AREA(ACRES) = 42.80
TOTAL STREAM AREA(ACRES) = 42.80
L PEAK FLOW RATE(CFS) AT CONFLUENCE = 118.60
**************************************************************************
FLOW PROCESS FROM NODE 8.00 TO NODE 9.00 IS CODE = 2
__________________________________________________________________________
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
NATURAL POOR COVER
TC = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]** .20
u� INITIAL SUBAREA FLOW-LENGTH = 1200.00
11 UPSTREIM ELEVATION = 1950.00
DOWNSTREAM ELEVATION = 1815.00
ELEVATION DIFFERENCE = 135.00
TC = .525*[( 1200.00** 3.00)/( 135.00)]** .20 = 13.855
25 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.827
U� SOIL CLASSIFICATION IS "A"
NATURAL E B
R� POOR COVER "BARREN" SUBAREA LOSS RATE. Fm(INCH/HR) = .4100
�'��_'_ �-_. -- _ -''_ '
SUBAREA RUNOFF(CFS) = 14.14
8� TOTAL AREA(ACRES) = 4.60 PEAK FLOW RATE(CFS) = 14.14
��
IV ILOW - PROCESS - FROM - NODE ----- ?.00 - TO - NODE ----- 7.00 - IS CODE ------------
lt = D = E = P = T " H =" O " F "" F = L " O " W "" I " N "=" 2 = 1 =" O "" I " N = C = H "" P " I = P " E == I = S ="= 1 = 5 = . " B == I = N = C = H = E " S "= ....
PIPEFLOW VELOCITY(FEET/SEC.) = 7~3
I UPSTREAM NODE ELEVATION = 1815.00
N�DOWNSTREAM NODE ELEVATION = 1712.00
�
FLOWLENGTH(FEET) = 1500.00 MANNINGS N = .035
ESTIMATED PIPE DIAMETER(INCH) = 21.00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) = 14.14
N� TRAVEL TIME(MIN. ) = 3.44 TC(MIN. ) = 17.29
FLOW PROCESS FROM NODE 7.00 TO NODE 7.00 IS CODE = 8
>>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
25 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.277
SOIL CLASSIFICATION IS "A"
U� RESIDENTIAL-> 3-4 DWELLINGS/ACRE SUBAREA LOSS RATE, Fm(INCH/HR) = .5820
SUBAREA AREA(ACRES) = 23.60 SUBAREA RUNOFF(CFS) = 57.24
EFFECTIVE AREA(ACRES) = 28.20
U�AVERAGED Fm(INCH/HR) = .554
w� TOTAL AREA(ACRES) = 28.20
PEAK FLOW RATE(CFS) = 69.11
0� TC(MIN) = 17.29
**************************************************************************
0� FLOW PROCESS FROM NODE 7.00 TO NODE 7.00 IS CODE = 1
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
U� >>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<<
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MINUTES) = 17.29
0�
RAINFALL INTENSITY (INCH. /HOUR) = 3.28
EFFECTIVE STREAM AREA(ACRES) = 28.20
TOTAL STREAM AREA(ACRES) = 28.20
PEAK FLOW RATE(CFS) AT CONFLUENCE = 69.11
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
N� CONFLUENCE FORMULA USED FOR 2 STREAMS.
SUMMARY RESULTS:
STREAM CONFLUENCE EFFECTIVE
NUMBER Q(CFS) AREA(ACRES)
1 185.37 65.81
2 168.40 71.00
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE(CFS) = 185.37 TIME(MINUTES) = 14.111
EFFECTIVE AREA(ACRES) = 65.81
U� TOTAL AREA(ACRES) = 71.00
CONFLUENCE INFORMATION:
0�
STREAM PEAK FLOW
TIME
INTENSITY
FM
EFFECTIVE
NUMBER RATE(CFS)
(MIN.)
(INCH/HOUR)
(IN/HR)
AREA(ACRES)
1 118.60
14.11
3.778
.70
42.80
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
N� CONFLUENCE FORMULA USED FOR 2 STREAMS.
SUMMARY RESULTS:
STREAM CONFLUENCE EFFECTIVE
NUMBER Q(CFS) AREA(ACRES)
1 185.37 65.81
2 168.40 71.00
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE(CFS) = 185.37 TIME(MINUTES) = 14.111
EFFECTIVE AREA(ACRES) = 65.81
U� TOTAL AREA(ACRES) = 71.00
�� FLOW PROCESS FROM NODE 7.00 TO NODE 10.00 IS CODE = 3
___________________________________________________________________________
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
DEPTH OF FLOW IN 42.0 INCH PIPE IS 31.8 INCHES
PIPEFLOW VELOCITY(FEET/SEC.) = 23.7
UPSTREAM NODE ELEVATION = 1712.00
DOWNSTREAM NODE ELEVATION = 1706.00
FLOWLENGTH(FEET> = 150.00 MANNINGS N = .013
U� ESTIMATED PIPE DIAMETER(INCH) = 42.00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) = 185.37
TRAVEL TIME(MIN.) = .11 TC(MIN.) = 14.22
****************************************************************************
FLOW PROCESS FROM NODE 10.00 TO NODE 10.00 IS CODE = 1
___________________________________________________________________________
w� >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
============================================================================
U� CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MINUTES) = 14.22
RAINFALL INTENSITY (INCH./HOUR) = 3.76
EFFECTIVE STREAM AREA(ACRES) = 65.81
TOTAL STREAM AREA(ACRES) = 71.00
PEAK FLOW RATE(CFS) AT CONFLUENCE = 185.37
***************************************************************************
FLOW PROCESS FROM NODE 11.00 TO NODE 12.00 IS CODE = 2
��________>>>>>RATIONAL __________METHOD _____INITIAL __________SUBAR�A __________ANALYSIS<<<<< ________________________________
N�
============================================================================
NATURAL POOR COVER
TC = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]** .20
INITIAL SUBAREA FLOW-LENGTH = 540.00
UPSTREAM ELEVATION = 1955.00
0�
DOWNSTREAM ELEVATION = 1875.00
ELEVATION DIFFERENCE = 80.00
TC = .525*[( 540.00** 3.00)/( 80.00)]** .20 = 9.527
N� 25 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.973
SOIL CLASSIFICATION IS "A"
NATURAL POOR COVER "BARREN" SUBAREA LOSS RATE, Fm(INCH/HR) = .4100
Q� SUBAREA RUNOFF(CFS) = 37.79
TOTAL AREA(ACRES) = 9.20 PEAK FLOW RATE(CFS) = 37.79
FLOW PROCESS FROM NODE 12.00 TO NODE 13.00 IS CODE = 3
lt _____________________________
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
===========================================================================
U� DEPTH OF FLOW IN 27.0 INCH PIPE IS 21.3 INCHES
PIPEFLOW VELOCITY(FEET/SEC.) = 11.2
UPSTREAM NODE ELEVATION = 1875.00
DOWNSTREAM NODE ELEVATION = 1810.00
N� FLOWLENGTH(FEET) = 560.00 MANNINGS N = .035
ESTIMATED PIPE DIAMETER(INCH) = 27.00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) = 37.79
N� TRAVEL TIME(MIN. ) = .83 TC(MIN. ) = 10.36
��
�^
li FLOW PROCESS FROM NODE 13.00 TO NODE 13.00 IS CODE = 8
____________________________________________________________________________
>>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<\<<
25 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.691
SOIL CLASSIFICATION IS "A"
NATURAL POOR COVER "BARREN" SUBAREA LOSS RATE, Fm(INCH/HR) = .4100
0� SUBAREA AREA (ACRES) = 13.50 SUBAREA RUNOFF(CFS) = 52.01
EFFECTIVE AREA(ACRES) = 22.70
AVERAGED Fm(INCH/HR) = .410
U� TOTAL AREA(ACRES) = 22.70
m� PEAK FLOW RATE(CFS) = 97.45
TC(MIN) = 10.36
****************************************************************************
FLOW PROCESS FROM NODE 13.00 TO NODE 14.00 IS CODE = 3
�-___________________________________________________________________________
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
DEPTH OF FLOW IN 30.0 INCH PIPE IS 20.2 INCHES
PIPEFLOW VELOCITY(FEET/SEC.) = 24.9
UPSTREAM NODE ELEVATION = 1810.00
U� DOWNSTREAM NODE ELEVATION = 1716.00
FLOWLENGTH(FEET) = 1300.00 MANNINGS N = .013
ESTIMATED PIPE DIAMETER(INCH) = 30.00 NUMBER OF PIPES = 1
N� PIPEFLOW THRU SUBAREA(CFS) = 87.45
TRAVEL TIME(MIN.) = .87 TC(MIN.) = 11.23
FLOW PROCESS FROM NODE 14.00 TO NODE 14.00 IS CODE = 8
��_____________>>>>>ADDITION ___OF ______SUBAREA _____TO __________MAINLINE __PEAK ________FLOW<<<<< _ ___________________________
U�
============================================================================
25 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.433
SOIL CLASSIFICATION IS "A"
u� RESIDENTIAL-> 3-4 DWELLINGS/ACRE SUBAREA LOSS RATE, Fm(INCH/HR) = .5820
SUBAREA AREA(ACRES) = 14.90 SUBAREA RUNOFF(CFS) = 51.65
N� EFFECTIVE AREA(ACRES) = 37.60
AVERAGED Fm(INCH/HR) = .478
TOTAL AREA(ACRES) = 37.60
PEAK FLOW RATE(CFS) = 133.84
TC(MIN) = 11.23
FLOW PROCESS FROM NODE 13.10 TO NODE 14.00 I8 CODE = 8
____________________________________________________________________________
U� >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
25 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.433
SOIL CLASSIFICATION IS "A"
N� RESIDENTIAL-> 3-4 DWELLINGS/ACRE SUBAREA LOSS RATE, Fm(INCH/HR) = .5820
SUBAREA AREA(ACRES) = 32.00 SUBAREA RUNOFF(CFS) = 110.92
EFFECTIVE AREA(ACRES) = 69.60
U� AVERAGED Fm(INCH/HR) = .526
TOTAL AREA(ACRES) = 69.60
PEAK FLOW RATE(CFS) = 244.76
TC(MIN) = 11.23
****************************************************************************
FLOW PROCESS FROM NODE 14.00 TO NODE 10.00 IS CODE = 3
@H ---------------------------------------------------------------------------
W� >>>>>COMPUTE PIPEFLOW TRAVB-TIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
DEPTH OF FLOW IN 51.0 INCH PIPE IS 38.4 INCHES
PIPEFLOW VELOCITY(FEET/SEC.) = 21.3
UPSTREAM NODE ELEVATION = 1716.00
N� DOWNSTREAM NODE ELEVATION = 1706.00
FLOWLENGTH(FEET) = 400.00 MANNINGS N = .013
ESTIMATED PIPE DIAMETER(INCH) = 51.00 NUMBER OF PIPES = 1
0� PIPEFLOW THRU SUBAREA(CFS) = 244.76
TRAVEL TIME(MIN.) = .31 TC(MIN.) = 11.54
***************************************************************************
FLOW PROCESS FROM NODE 10.00 TO NODE 10.00 IS CODE = 1
0� >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
>>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<<
============================================================================
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MINUTES) = 11.54
RAINFALL INTENSITY (INCH./HOUR) = 4.35
EFFECTIVE STREAM AREA(ACRES) = 69.60
8� TOTAL STREAM AREA(ACRES) = 69.60
PEAK FLOW RATE(CFS) AT CONFLUENCE = 244.76
***************************************************************************
FLOW PROCESS FROM NODE 10.00 TO NODE 15.00 IS CODE = 3
_____ -----------------------
_
it>>>*.'>>COMPUTEPIPEFLOWTRAVELTIMETHRUSUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
===========================================================================
DEPTH OF FLOW IN 54.0 INCH PIPE IS 43.0 INCHES
PIPEFLOW VELOCITY(FEET/SEC.) = 31.2
UPSTREAM NODE ELEVATION = 1706.00
DOWNSTREAM NODE ELEVATION = 1630.00
U� FLOWLENGTH(FEET) = 1550.00 MANNINGS N = .013
ESTIMATED PIPE DIAMETER(INCH) = 54.00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) = 423.81
TRAVEL TIME(MIN. ) = .83 TC(MIN. ) = 12.37
m�
CONFLUENCE INFORMATION:
m�
STREAM PEAK FLOW
TIME INTENSITY FM
EFFECTIVE
NUMBER RATE(CFS)
(MIN.) (INCH/HOUR) (IN/HR)
AREA(ACRES)
1 185.37
14.22 3.758 .65
65.81
2 244.76
11.54 4.349 .53
69.60
0�
RAINFALL INTENSITY
AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA
USED FOR 2 STREAMS.
SUMMARY RESULTS:
0�
STREAM CONFLUENCE
EFFECTIVE
NUMBER Q(CFS)
AREA(ACRES)
pq
1 392.31
135.41
N�
2 423.81
123.02
COMPUTED CONFLUENCE
ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE(CFS)
= 423.81 TIME(MINUTES)
= 11.541
U�
EFFECTIVE AREA(ACRES)
= 123.02
TOTAL AREA(ACRES) =
140.60
***************************************************************************
FLOW PROCESS FROM NODE 10.00 TO NODE 15.00 IS CODE = 3
_____ -----------------------
_
it>>>*.'>>COMPUTEPIPEFLOWTRAVELTIMETHRUSUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
===========================================================================
DEPTH OF FLOW IN 54.0 INCH PIPE IS 43.0 INCHES
PIPEFLOW VELOCITY(FEET/SEC.) = 31.2
UPSTREAM NODE ELEVATION = 1706.00
DOWNSTREAM NODE ELEVATION = 1630.00
U� FLOWLENGTH(FEET) = 1550.00 MANNINGS N = .013
ESTIMATED PIPE DIAMETER(INCH) = 54.00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) = 423.81
TRAVEL TIME(MIN. ) = .83 TC(MIN. ) = 12.37
m�
* *************************************************
��FLOW PROCESS FROM NODE 21.00 TO NODE 24.00 IS CODE = 2
----------------------------------------------------------------------
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<< '
NATURAL POOR COVER
N�TC = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]** .20
��
0�INITIAL SUBAREA FLOW-LENGTH = 430.00
UPSTREAM ELEVATION = 1585.00
DOWNSTREAM ELEVATION = 1575.00
��ELEVATION DIFFERENCE = 10.00
N�TC = .525*[( 430.00** 3.00)/( 10.00)]** .20 = 12.596
25 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.090
SOIL CLASSIFICATION IS "A"
U�NATURAL POOR COVER "BARREN" SUBAREA LOSS RATE, Fm(INCH/HR) = .4100
SUBAREA RUNOFF<CFS> = 32.13
TOTAL AREA(ACRES) = 9.70 PEAK FLOW RATE(CFS) = 32.13
****************************************************************************
FLOW PROCESS FROM NODE 24.00 TO NODE 23.00 IS CODE = 3
***************************************************************************
FLOW PROCESS FROM NODE 23.00 TO NODE 23.00 IS CODE = 1
________________________________________
g� >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
U� TIME OF CONCENTRATION(MINUTES) = 14.54
RAINFALL INTENSITY (INCH. /HOUR) = 3.70
EFFECTIVE STREAM AREA(ACRES) = 30.60
TOTAL STREAM AREA(ACRES) = 30.60
D� PEAK FLOW RATE(CFS) AT CONFLUENCE = B9.19 '
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE
FLOW)<<<<<
�DEPTH
OF FLOW IN 24.0 INCH PIPE IS 19.1
INCHES
U�UPSTREAM
PIPEFLOW VELOCITY(FEET/SEC.) = 12.0
NODE ELEVATION = 1575.00
DOWNSTREAM NODE ELEVATION = 1545.00
FLOWLENGTH(FEET) = 1400.00 MANNINGS N
= .013
ESTIMATED PIPE DIAMETER(INCH) = 24.00
NUMBER OF
PIPES = 1
N�
PIPEFLOW THRU SUBAREA(CFS) = 32.13
TRAVEL TIME(MIN.) = 1.94 TC(MIN.) =
14.54
****************************************************************************
N�
FLOW PROCESS FROM NODE 23.00 TO NODE
---- _------- _---- _---- ____----- ____ ---- ____-----
23.00 IS
____
CODE = 8
---- __________________
>>>>>ADDITION OF SUBAREA TO MAINLINE PEAK
FLOW<<<<<
============================================================================
25 YEAR RAINFALL INTENSITY(INCH/HOUR) =
3.700
0�
SOIL CLASSIFICATION IS "A"
RESIDENTIAL-> 5-7 DWELLINGS/ACRE SUBAREA
LOSS RATE,
Fm(INCH/HR) = .4850
SUBAREA AREA(ACRES) = 20.90 SUBAREA RUNOFF(CFS)
EFFECTIVE AREA(ACRES) = 30.60
= 60.47
AVERAGED Fm(INCH/HR) = .461
TOTAL AREA(ACRES) = 30.60
Q�
PEAK FLOW RATE(CFS) = 89.19
~~
TC(MIN) = 14.54
***************************************************************************
FLOW PROCESS FROM NODE 23.00 TO NODE 23.00 IS CODE = 1
________________________________________
g� >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
U� TIME OF CONCENTRATION(MINUTES) = 14.54
RAINFALL INTENSITY (INCH. /HOUR) = 3.70
EFFECTIVE STREAM AREA(ACRES) = 30.60
TOTAL STREAM AREA(ACRES) = 30.60
D� PEAK FLOW RATE(CFS) AT CONFLUENCE = B9.19 '
To PROCESS FROM NODE 19.00 TO NODE 15.00 IS CODE = 8
______________________________________________________________________
>>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
25 YEAR RAINFALL INTENSITY(INCHyHOUR) = 4.143
SOIL CLASSIFICATION IS "A"
RESIDENTIAL-> 5-7 DWELLINGS/ACRE SUBAREA LOSS RATE, Fm(INCH/HR) = .4850
SUBAREA AREA(ACRES) = 29.70 SUBAREA RUNOFF(CFS) = 97.78
EFFECTIVE AREA(ACRES) = 152.72
�� AVERAGED Fm(INCH/HR) = .561
N� TOTAL AREA(ACRES) = 170.30
PEAK FLOW RATE(CFS) = 492.39
TC(MIN) = 12.37
IF ***********************************************************************
LOW PROCESS FROM NODE 15.00 TO NODE 16.00 IS CODE = 3 � ��������� ���� �������������������������������������� ������������� >>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<< >>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<< DEPTH OF FLOW IN 54.0 INCH PIPE IS 42.9 INCHES PIPEFLOW VELOCITY(FEET/SEC.) = 36.4 UPSTREAM NODE ELEVATION = 1630.00 DOWNSTREAM NODE ELEVATION = 1590.00 FLOWLENGTH(FEET> = 600.00 MANNINGS N = . 013 ESTIMATED PIPE DIAMETER(INCH) = 54.00 NUMBER OF PIPES PIPEFLOW THRU SUBAREA(CFS) = 492.39 TRAVEL TIME(MIN.) = .27 TC(MIN.) = 12.64 FLOW PROCESS FROM NODE 17.00 TO NODE 16.00 IS CODE = 8 ---------------------------------------------------------->>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<< 25 YEAR RAINFALL INTENSITY(INCH/HOUR> = 4.080 SOIL CLASSIFICATION IS "A" RESIDENTIAL-> 5-7 DWELLINGS�ACRE SUBAREA LOSS RATE, Fm(INCH�HR� = . 4850 SUBAREA AREA(ACRES) = 39.30 SUBAREA RUNOFF(CFS) = 127.15 E EFFECTIVE AREA(ACRES> = 192.02 AVERAGED Fm(INCH/HR) = . 545 TOTAL AREA(ACRES> = 209.60 PEAK FLOW RATE(CFS) = 610.84 TC(MIN) = 12.64 FLOW PROCESS FROM NODE 18.00 TO NODE 16.00 IS CODE = 8
___________________________________________ �� >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<< 25 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.080
SOIL CLASSIFICATION IS "A " SCHOOL SUBAREA LOSS RATE, Fm(INCH/HR) = .5820 47.22
SUBAREA AREA(ACRES) = 15.00 SUBAREA RUNOFF(CFS) = EFFECTIVE AREA(ACRES) = 207.02
AVERAGED Fm(INCH/HR) = .548
TOTAL AREA(ACRES) = 224.60
PEAK FLOW RATE(CFS) = 658.06
TC(MIN) = 12.64
PROCESS FROM NODE 15.00 TO NODE 16.00 IS CODE 3 ������������������������������������������������������������������
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<< /
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
DEPTH OF FLOW IN 54.0 INCH PIPE IS 42.9 INCHES
PIPEFLOW VELOCITY(FEET/SEC.) = 36.4
UPSTREAM NODE ELEVATION = 1630.00
DOWNSTREAM NODE ELEVATION = 1590.00
FLOWLENGTH(FEET> = 600.00 MANNINGS N = .013
ESTIMATED PIPE DIAMETER(INCH) = 54.00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) = 492.39
TRAVEL TIME(MIN.) = .27 TC(MIN.) = 12.64
****************************************************************************
FLOW PROCESS FROM NODE 17.00 TO NODE 16.00 IS CODE = 8
0�---------------------------------------------------------------------------
� >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
==========================================================================
M� 25 YEAR RAINFALL INTENSITY(INCH/HOUR> = 4.080
~� SOIL CLASSIFICATION IS "A"
RESIDENTIAL-> 5-7 DWELLINGS/ACRE SUBAREA LOSS RATE, Fm(INCH/HR) = .4850
SUBAREA AREA(ACRES) = 39.30 SUBAREA RUNOFF(CFS) = 127.15
EFFECTIVE AREA(ACRES) = 192.02
AVERAGED Fm(INCH/HR) = .545
TOTAL AREA(ACRES)
0�
u�
= 209.60
PEAK FLOW RATE(CFS) = 610.84
TC(MIN) = 12.64
��FLOW PROCESS FROM NODE 16.00 TO NODE 20.00 IS CODE = 3
_____________________________________________________________________
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
DEPTH OF FLOW IN 66.0 INCH PIPE IS 53.3 INCHES
0�PIPEFLOW VELOCITY(FEET/SEC.) = 32.0
��
�UPSTREAM NODE ELEVATION = 1590.00
DOWNSTREAM NODE ELEVATION = 1573.00
I FLOWLENGTH(FEET) = 430.00 MANNINGS N = .013
ESTIMATED PIPE DIAMETER(INCH) = 66.00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) = 658.06
,,TRAVEL TIME(MIN.) = .22 TC(MIN.) = 12.87
****************************************************************************
FLOW PROCESS FROM NODE 17.10 TO NODE 20.00 IS CODE = 8
__________________________________________________________________________
>>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
==========================================================================
U� 25 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.030
SOIL CLASSIFICATION IS "A"
COMMERCIAL SUBAREA LOSS RATE, Fm(INCH/HR) = .0970
II SUBAREA AREA(ACRES) = 8.20 SUBAREA RUNOFF(CFS) = 29.03
EFFECTIVE AREA(ACRES) = 215.22
AVERAGED Fm(INCH/HR) = .531
TOTAL AREA(ACRES) = 232.80
0� PEAK FLOW RATE(CFS) = 677.81
TC(MIN) = 12.87
t FLOW PROCESS FROM NODE 20.00 TO NODE 23.00 IS CODE = 3
_____________________________________________________________________
_ >>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
==========================================================================
L DEPTH OF FLOW IN 72.0 INCH PIPE IS 53.8 INCHES
PIPEFLOW VELOCITY(FEET/SEC.) = 29.9
UPSTREAM NODE ELEVATION = 1573.00
N� DOWNSTREAM NODE ELEVATION = 1545.00
FLOWLENGTH(FEET) = 900.00 MANNINGS N = .013
ESTIMATED PIPE DIAMETER(INCH) = 72.00 NUMBER OF PIPES = 1
11 PIPEFLOW THRU SUBAREA(CFS) = 677.81
TRAVEL TIME(MIN. ) = .50 TC(MIN.) = 13.37
FLOW PROCESS FROM NODE 23.00 TO NODE 23.00 IS CODE = 1
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MINUTES) = 13.37
RAINFALL INTENSITY (INCH./HOUR) = 3.92
EFFECTIVE STREAM AREA(ACRES) = 215.22
TOTAL STREAM AREA(ACRES) = 232.80
U� PEAK FLOW RATE(CFS) AT CONFLUENCE = 677.81
��
0
N� FLOW PROCESS FROM NODE 22.00 TO NODE 25.00 IS CODE = 2
____________________________________________________________________________
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
~~ NATURAL POOR COVER
TC = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]** .20
N� INITIAL SUBAREA FLOW-LENGTH = 480.00
UPSTREAM ELEVATION = 1600.00
DOWNSTREAM ELEVATION = 1577.00
N� ELEVATION DIFFERENCE = 23.00
w� TC = .525*[( 480.00** 3.00)/( 23.00)]** .20 = 11.391
25 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.389
U� SOIL CLASSIFICATION IS "A"
NATURAL POOR COVER "BARREN" SUBAREA LOSS RATE, Fm(INCH/HR) = .4100
SUBAREA RUNOFF(CFS) = 21.49
TOTAL AREA(ACRES) = 6.00 PEAK FLOW RATE(CFS) = 21.49
***************************************************************************
B� FLOW PROCESS FROM NODE 25.00 TO NODE 23.00 IS CODE = 3
____________________________________________________________________________
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPEGIZE (NON-PRESSURE FLOW)<<<<<
DEPTH OF FLOW IN 21.0 INCH PIPE IS 12.7 INCHES
PIPEFLOW VELOCITY(FEET/SEC.) = 14.2
UPSTREAM NODE ELEVATION = 1577.00
m� DOWNSTREAM NODE ELEVATION = 1545.00
FLOWLENGTH(FEET) = 800.00 MANNINGS N = .013
�U ESTIMATED PIPE DIAMETER(INCH) = 21.00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) = 21.49
TRAVEL TIME(MIN.) = .94 TC(MIN.) = 12.33
****************************************************************************
FLOW PROCESS FROM NODE 23.00 TO NODE 23.00 IS CODE = 8
___________________________________________________________________________
>>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
===========================================================================
H� 25 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.151
SOIL CLASSIFICATION IS "A"
APARTMENTS SUBAREA LOSS RATE, Fm(INCH/HR) = .1940
SUBAREA AREA(ACRES) = 12.60 SUBAREA RUNOFF(CFS) = 44.88
N� EFFECTIVE AREA(ACRES) = 18.60
AVERAGED Fm(INCH/HR) = .264
TOTAL AREA(ACRES) = 18.60
U� PEAK FLOW RATE(CFG) = 65.08
m� TC(MIN) = 12.33
0
****************************************************************************
0� FLOW PROCESS FROM NODE 23.00 TO NODE 23.00 IS CODE = 1
----- ___________________________________________
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
>>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<<
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 3 ARE:
TIME OF CONCENTRATION(MINUTES) = 12.33
RAINFALL INTENSITY (INCH./HOUR) = 4.15
EFFECTIVE STREAM AREA(ACRES) = 18.60
TOTAL STREAM AREA(ACRES) = 18.60
PEAK FLOW RATE(CFS) AT CONFLUENCE = 65.08
CONFLUENCE INFORMATION:
TO NODE
23.10 IS CODE = 3
STREAM PEAK FLOW
TIME INTENSITY FM
EFFECTIVE
8�
______________________________________________________________
NUMBER RATE(CFS)
(MIN.) (INCH/HOUR) (IN/HR)
AREA(ACRES)
1 677.81
2 89.19
13.37 3.924 .53
14.54 3.700 .46
215.22
30.60
FLOW)<<<<<
3 65.08
12.33 4.151 .26
18.60
INCHES
RAINFALL INTENSITY
AND TIME OF CONCENTRATION RATIO
N�
CONFLUENCE FORMULA
USED FOR 3 STREAMS.
UPSTREAM NODE ELEVATION = 1545.00
DOWNSTREAM NODE ELEVATION =
1533.60
SUMMARY RESULTS:
FLOWLENGTH(FEET) = 700.00
MANNINGS N
STREAM CONFLUENCE
EFFECTIVE
ESTIMATED PIPE DIAMETER(INCH)
= 87.00
NUMBER Q(CFS)
AREA(ACRES)
PIPEFLOW THRU SUBAREA(CFS) =
826.75
1 826.75
261.96
TRAVEL TIME(MIN. ) = .47
[i
2 779.78
264.42
3 818.58
243.11
COMPUTED CONFLUENCE
ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE(CFS)
= 826.75 TIME(MINUTES)
= 13.368
R�
EFFECTIVE AREA(ACRES)
= 261.96
TOTAL AREA(ACRES) =
282.00
FLOW PROCESS FROM NODE 23.00
TO NODE
23.10 IS CODE = 3
��_______>>>>>COMPUTE
___________PIPEFLOW ______TRAVELTIME
__THRU __SUBAREA<<<<<
________________________
��
>>>>>USING COMPUTER-ESTIMATED
PIPESIZE (NON-PRESSURE
FLOW)<<<<<
===========================================================================
DEPTH OF FLOW IN 87.0 INCH PIPE
IS 66.0
INCHES
PIPEFLOW VELOCITY(FEET/SEC.)
= 24.6
U�
UPSTREAM NODE ELEVATION = 1545.00
DOWNSTREAM NODE ELEVATION =
1533.60
FLOWLENGTH(FEET) = 700.00
MANNINGS N
= .013
ESTIMATED PIPE DIAMETER(INCH)
= 87.00
NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) =
826.75
��
TRAVEL TIME(MIN. ) = .47
TC(MIN. ) =
13.84
t FL0 ** W PROCESS FROM NODE 27.00 TO NODE 23.10 IS CODE = 8
_____________________________________________________________________
>>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
25 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.829
CLASSIFICATION IS "A" PUBLIC PARK SUBAREA LOSS RATE, Fm(INCH/HR) = .8245
,,SOIL
SUBAREA AREA(ACRES) = 5.90 SUBAREA RUNOFF(CFS) = 15.95
EFFECTIVE AREA(ACRES) = 267.86
I AVERAGED Fm(INCH/HR) = .511
NTOTAL AREA(ACRES) = 287.90
PEAK FLOW RATE(CFS) = 826.75 '
11 TC(MIN) = 13.84
**************************************************************************
FLOW PROCESS FROM NODE 28.00 TO NODE 23.10 IS CODE = 8
__________________________________________________________________________
>>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
==========================================================================
0� 25 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.829
SOIL CLASSIFICATION IS "A"
COMMERCIAL SUBAREA LOSS RATE, Fm(INCH/HR) = .0970
U�SUBAREA AREA(ACRES) = 5.50 SUBAREA RUNOFF(CFS) = 18.47
��
°�EFFECTIVE AREA(ACRES) = 273.36
AVERAGED Fm(INCH/HR) = .503
TOTAL AREA(ACRES) = 293.40
PEAK FLOW RATE(CFS) = 826.75
TC(MIN) = 13.84
FLOW PROCESS FROM NODE 20.00 TO NODE 23.10 IS CODE = 8
��__________________________________________________________________________
N� >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================
25 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.829
SOIL CLASSIFICATION IS "A"
COMMERCIAL SUBAREA LOSS RATE, Fm(INCH/HR) = .0970
SUBAREA AREA(ACRES) = 3.90 SUBAREA RUNOFF(CFS) = 13.10
�0 EFFECTIVE AREA(ACRES) = 277.26
AVERAGED Fm(INCH/HR) = .497
AREA(ACRES) = 297'30
0� , TOTAL
PEAK FLOW RATE(CFS) = 831-39
�
�� TC(MIN) = 13.84
- FLOW PROCESS FROM NODE 23.10 TO NODE 26.00 IS CODE = 3
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
============================================================================
DEPTH OF FLOW IN 87.0 INCH PIPE IS 66.8 INCHES
PIPEFLOW VELOCITY(FEET/SEC.) = 24.4
UPSTREAM NODE ELEVATION = 1533.60
DOWNSTREAM NODE ELEVATION = 1532.00
U� FLOWLENGTH(FEET) = 100.00 - MANNINGS N = .013
ESTIMATED PIPE DIAMETER(INCH) = 87.00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) = 831.39
�� TRAVEL TIME(MIN ) = .07 TC(MIN.) = 13.91
****************************************************************************
FLOW PROCESS FROM NODE 26.00 TO NODE 26.00 IS CODE = 1
___________________________________________________________________________
- >>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
============================================================================
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MINUTES) = 13.91
RAINFALL INTENSITY (INCH./HOUR) = 3.82
EFFECTIVE STREAM AREA(ACRES) = 277.26
TOTAL STREAM AREA(ACRES) = 297.30
PEAK FLOW RATE(CFS) AT CONFLUENCE = 831.39
***************************************************************************
FLOW PROCESS FROM NODE 30.00 TO NODE 29.00 IS CODE = 2
___________________________________________________________________________
m� >>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
============================================================================
DEVELOPMENT IS SINGLE FAMILY RESIDENTIAL -> 5-7 DWELLINGS/ACRE
TC = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]** .20
INITIAL SUBAREA FLOW-LENGTH = 2100.00
UPSTREAM ELEVATION = 1580.00 �
DOWNSTREAM ELEVATION = 1539.00
ELEVATION DIFFERENCE = 41.00
TC = .389*[( 2100.00** 3.00)/( 41.00)]** .20 = 18.227
U� 25 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.158
SOIL CLASSIFICATION IS "A"
RESIDENTIAL-> 5-7 DWELLINGS/ACRE SUBAREA LOSS RATE, Fm(INCH/HR) = .4850
U� SUBAREA RUNOFF(CFS) = 32.96
u� TOTAL AREA(ACRES) = 13.70 PEAK FLOW RATE(CFS) = 32.96
***************************************************************************
FLOW PROCESS FROM NODE 29.00 TO NODE 26.00 IS CODE= 3
Ul __-______>>>>>COMPUTE _____PIPEFLOW _TRAVELTIME _THRU _SUBAREA<<<<< -------------------------
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
===========================================================================
U� DEPTH OF FLOW IN 30.0 INCH PIPE IS 21.4 INCHES
m�
PIPEFLOW VELOCITY(FEET/SEC.) = 8.8
UPSTREAM NODE ELEVATION = 1539.00
0A DOWNSTREAM NODE ELEVATION = 1532.00
8� FLOWLENGTH(FEET) = 800.00 MANNINGS N = .013
ESTIMATED PIPE DIAMETER(INCH) = 30.00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) = 32.96 '
N� TRAVEL TIME(MIN. ) = 1.52 TC(MIN. ) = 19.74
FLOW PROCESS FROM NODE 26.10 TO NODE 26.00 IS CODE = 8
____________________________________________________________________________
>>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
25 YEAR RAINFALL INTENSITY(INCH/HOUR) = 2.986
SOIL CLASSIFICATION IS "A"
COMMERCIAL SUBAREA LOSS RATE, Fm(INCH/HR) = .0970
SUBAREA AREA(ACRES) = 3.50 SUBAREA RUNOFF(CFS) = 9.10
EFFECTIVE AREA(ACRES) = 17.20
U� AVERAGED Fm(INCH/HR) = .406
TOTAL AREA(ACRES) = 17.20
PEAK FLOW RATE(CFS) = 39.94
TC(MIN) = 19.74
****************************************************************************
FLOW PROCESS FROM NODE 26.00 TO NODE 26.00 IS CODE = 1
N �----------------------------------------------------------------------------
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
============================================================================
0� CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MINUTES) = 19.74
RAINFALL INTENSITY (INCH./HOUR) = 2.99
EFFECTIVE STREAM AREA(ACRES) = 17.20
N� TOTAL STREAM AREA(ACRES) = 17.20
PEAK FLOW RATE(CFS) AT CONFLUENCE = 39.94
****************************************************************************
FLOW PROCESS FROM NODE 14.00 TO NODE 33.00 IS CODE = 2
N �----------------------------------------------------------------------------
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
============================================================================
DEVELOPMENT IS COMMERCIAL
TC = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]** .20
INITIAL SUBAREA FLOW-LENGTH = 1900.00
W� UPSTREAM ELEVATION = 1716.00
«� DOWNSTREAM ELEVATION = 1610.00
ELEVATION DIFFERENCE = 106.00
TC = .304*1 ( 1900.00** 3.00)/( 106.00)3** .20 = 11.093
25 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.471
SOIL CLASSIFICATION IS "A"
COMMERCIAL SUBAREA LOSS RATE, Fm(INCH/HR) = .0970
8� SUBAREA RUNOFF(CFS) = 11.02
TOTAL AREA(ACRES) = 2.80 PEAK FLOW RATE(CFS) = 11.02
FLOW PROCESS FROM NODE 31.00 TO NODE 33.00 IS CODE = 8
________________________________________________________________________
M� >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================
25 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.471
SOIL CLASSIFICATION IS "A"
RESIDENTIAL-> 3-4 DWELLINGS/ACRE SUBAREA LOSS RATE, Fm(INCH/HR) = .5820
SUBAREA AREA(ACRES) = 33.50 SUBAREA RUNOFF(CFS) = 117.25
0� EFFECTIVE AREA(ACRES) = 36.30
AVERAGED Fm(INCH/HR) = .545
TOTAL AREA(ACRES) = 36.30
N� PEAK FLOW RATE(CFS) = 128.27
~~
TC(MIN) = 11.09
*** * * * * * * *
FLOW PROCESS FROM NODE 33.00 TO NODE 34.00 IS CODE = 3
_------------ _-------- _---------- _---- _------------
________________________
M� >>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
============================================================================
DEPTH OF FLOW IN 36.0 INCH PIPE IS 26.5 INCHES
PIPEFLOW VELOCITY (FEET/SEC. ) = 23.0
UPSTREAM NODE ELEVATION = 1610.00 '
DOWNSTREAM NODE ELEVATION = 1590.00
U� FLOWLENGTH(FEET) = 430.00 MANNINGS N = .013
ESTIMATED PIPE DIAMETER(INCH) = 36.00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) = 128.27
U� TRAVEL TIME(MIN. ) = .31 TC(MIN. ) = 11.40
* *****************************************************************
FLOW PROCESS FROM NODE 34.00 TO NODE 35.00 IS CODE = 3
---- _------- _---- _---- ____----- ____ ---- ____----- ____ ---- __________________
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
DEPTH OF FLOW IN 36.0 INCH PIPE IS 27.3 INCHES
11 PIPEFLOW VELOCITY(FEET/SEC.) = 22.3
UPSTREAM NODE ELEVATION = 1590.00
DOWNSTREAM NODE ELEVATION = 1553.00
FLOWLENGTH(FEET) = 850.00 MANNIN8S N = .013
1 ESTIMATED PIPE DIAMETER(INCH) = 36.00 NUMBER OF PIPES = 1
NPIPEFLOW THRU SUBAREA(CFS) = 128.27
TRAVEL TIME(MIN.) = .63 TC(MIN.) = 12.04
****************************************************************************
FLOW PROCESS FROM NODE 34.20 TO NODE 35.00 IS CODE = 8
---- _------- _---- _---- ____----- ____ ---- ____----- ____ ---- __________________
N� >>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
============================================================================
25 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.222
N� SOIL CLASSIFICATION IS "A"
RESIDENTIAL-> 11+ DWELLINGS/ACRE SUBAREA LOSS RATE, Fm(INCH/HR) = .1940
SUBAREA AREA(ACRES) = 16.20 SUBAREA RUNOFF(CFS) = 58.73
N� EFFECTIVE AREA(ACRES) = 52.50
AVERAGED Fm(INCH/HR) = .436
TOTAL AREA(ACRES) = 52.50
�� PEAK FLOW RATE(CFS) = 178.87
0�
"� TC(MIN) = 12.04
**************************************************************************
- FLOW PROCESS FROM NODE 35.00 TO NODE 26.00 IS CODE = 3
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
==========================================================================
DEPTH OF FLOW IN 45.0 INCH PIPE IS 32.0 INCHES
PIPEFLOW VELOCITY(FEET/SEC. ) = 21.3
UPSTREAM NODE ELEVATION = 1553.00
DOWNSTREAM NODE ELEVATION = 1532.00
FLOWLENGTH(FEET) = 700.00 MANNINGS N = .013
ESTIMATED PIPE DIAMETER(INCH) = 45.00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) = 178.87
TRAVEL TIME(MIN. ) = .55 TC(MIN.) = 12.59
**************************************************************************
FLOW PROCESS FROM NODE 33.00 TO NODE 26.00 IS CODE = 8
____________________________________________________________________________
>>>>>A[)DITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
25 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.093
SOIL CLASSIFICATION IS "A"
8� COMMERCIAL SUBAREA LOSS RATE, Fm(INCH/HR) = .0970
«� SUBAREA AREA(ACRES) = 2.70 SUBAREA RUNOFF(CFS) = 9.71
EFFECTIVE AREA(ACRES) = 55.20
AVERAGED Fm(INCH/HR) = .420
U� TOTAL AREA(ACRES) = 55.20
PEAK FLOW RATE(CFS) = 182.47
TC(MIN) = 12.59
I
11 **************************************************************************
011 PROCESS FROM NODE 26.00 TO NODE 26.00 IS CODE = 1
_____________________________________________________________________
W >> >>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
A>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<<
N ==== ======================================================================
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 3 ARE:
0�TIME OF CONCENTRATION(MINUTES) = 12.59
��
~~ RAINFALL INTENSITY (INCH. /HOUR) = 4.09
EFFECTIVE STREAM AREA(ACRES) = 55.20
TOTAL STREAM AREA(ACRES) = 55.20
8� PEAK FLOW RATE(CFS) AT CONFLUENCE = 182.47
*************************************************************************
FLOW PROCESS FROM NODE 26.00 TO NODE 36.10 IS CODE = 3
N�---------------------------------------------------------------------
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
nrpTu no rim Tm I
9� o TNrH PPE IS 74.1 INCHES
CONFLUENCE INFORMATION:
� ��
= 24.9
U�STREAM
PEAK FLOW
TIME INTENSITY FM
EFFECTIVE
u �NUMBER
RATE(CFS)
(MIN.) (INCH/HOUR) (IN/HR)
AREA(ACRES)
______________________________________________________________
1 831.39
13.91 3.816 .50
277.26
N�
2 39.94
19.74 2.986 .41
17.20
NUMBER OF PIPES =
3 182.47
12.59 4.093 .42
55.20
N�RAINFALL
INTENSITY AND TIME OF CONCENTRATION RATIO
TRAVEL TIME(MIN.) = .32
CONFLUENCE FORMULA USED FOR 3 STREAMS.
14.23
SUMMARY RESULTS:
STREAM CONFLUENCE
EFFECTIVE
NUMBER Q(CFS)
AREA(ACRES)
__________________________________________
1 1037.30
344.58
2 790.98
349.66
3 1033.84
317.04
COMPUTED CONFLUENCE
ESTIMATES ARE AS FOLLOWS:
00
PEAK FLOW RATE(CFS)
= 1037.30 TIME(MINUTES)
= 13'911
EFFECTIVE AREA(ACRES) = 344.58
TOTAL AREA(ACRES) =
369.70
*************************************************************************
FLOW PROCESS FROM NODE 26.00 TO NODE 36.10 IS CODE = 3
N�---------------------------------------------------------------------
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
nrpTu no rim Tm I
9� o TNrH PPE IS 74.1 INCHES
'�'� �����
PIPEFLOW VELOCITY(FEET/SEC.)
� ��
= 24.9
UPSTREAM NODE ELEVATION = 1532.00
DOWNSTREAM NODE ELEVATION =
1525.00
FLOWLENGTH(FEET) = 480.00
MANNINGS N
= .013
ESTIMATED PIPE DIAMETER(INCH)
= 96.00
NUMBER OF PIPES =
U�
PIPEFLOW THRU SUBAREA(CFS) =
1037.30
TRAVEL TIME(MIN.) = .32
TC(MIN.) =
14.23
* ** * ** ****************************************************
�� FLOW PROCESS FROM NODE 37.10 TO NODE 36.10 IS CODE = 8
_____________________________________________-_-----------------------
>>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
��.==========================================================================
��
^� 25 YEAR RAINFALL INTENSITY(INCH/HOUR> = 3.755
SOIL CLASSIFICATION IS "A"
RESIDENTIAL-> 5-7 DWELLINGS/ACRE SUBAREA LOSS RATE, Fm(INCH/HR) = .4850
U� SUBAREA AREA(ACRES) = 16.60 SUBAREA RUNOFF(CFS) = 48.86
m� EFFECTIVE AREA(ACRES) = 361. 18
AVERAGED Fm(INCH/HR) = .482
N� TOTAL AREA(ACRES) = 386.30
PEAK FLOW RATE(CFS) = 1064.13
TC(MIN) = 14.23
****************************************************************************
FLOW PROCESS FROM NODE 36.10 TO NODE 36.00 IS CODE = 3
___________________________________________________________________________
m� >>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
~~ DEPTH OF FLOW IN 90.0 INCH PIPE IS �2.2 INCHES
PIPEFLOW VELOCITY(FEET/SEC.) = 28.0
UPSTREAM NODE ELEVATION = 1525.00
U� DOWNSTREAM NODE ELEVATION = 1506.00
FLOWLENGTH(FEET> = 950.00 MANNINGS N = .013
ESTIMATED PIPE DIAMETER(INCH) = 90.00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS> = 1064. 13
TRAVEL TIME(MIN.) = .57 TC(MIN.) = 14.80
FLOW PROCESS FROM NODE 26.00 TO NODE 36.00 IS CODE = 8
____________________________ l:-
>>>>>ADDITION OF SUBAREA TO' MAINLINE PEAK FLOW<<<<<
============================================================================
EN 25 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.654
SOIL CLASSIFICATION IS "A
"
COMMERCIAL SUBAREA LOSS RATE, Fm(INCH/HR) = .0970 10.89
SUBAREA AREA(ACRES) = 3.40 SUBAREA RUNOFF(CFS) =
EFFECTIVE AREA(ACRES) = 364.58
w� AVERAGED Fm(INCH/HR) = .470
TOTAL AREA(ACRES) = 389.70
PEAK FLOW RATE(CFS) = 1064.13
N� TC(MIN) = 14.80
��
FLOW PROCESS FROM NODE 37.10 TO NODE
36.10 IS CODE = 8
_____________________________________________-_-----------------------
>>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
��.==========================================================================
��
^�
25 YEAR RAINFALL INTENSITY(INCH/HOUR>
= 3.755
SOIL CLASSIFICATION IS "A"
RESIDENTIAL-> 5-7 DWELLINGS/ACRE SUBAREA LOSS RATE, Fm(INCH/HR> = .4850
m�
SUBAREA AREA(ACRES> = 16.60 SUBAREA
RUNOFF(CFS) = 48.86
EFFECTIVE AREA(ACRES) = 361. 18
N�
AVERAGED Fm(INCH/HR) = .482
TOTAL AREA(ACRES) = 386.30
PEAK FLOW RATE(CFS) = 1064.13
TC(MIN) = 14.23
****************************************************************************
FLOW PROCESS FROM NODE 36.10 TO NODE
36.00 IS CODE = 3
m�
___________________________________________________________________________
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE
(NON-PRESSURE FLOW)<<<<<
~~
DEPTH OF FLOW IN 90.0 INCH PIPE IS �2.2
INCHES
PIPEFLOW VELOCITY(FEET/SEC.) = 28.0
UPSTREAM NODE ELEVATION = 1525.00
U�
DOWNSTREAM NODE ELEVATION = 1506.00
FLOWLENGTH(FEET> = 950.00 MANNINGS
N = .013
ESTIMATED PIPE DIAMETER(INCH> = 90.00
PIPEFLOW THRU SUBAREA(CFS> = 1064. 13
NUMBER OF PIPES = 1
TRAVEL TIME(MIN.) = .57 TC(MIN.)
= 14.80
***************************************************************************
N� FLOW PROCESS FROM NODE 37.00 TO NODE 36.00 IS CODE = 8
____________________________________________________________________________
>>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
25 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.654
SOIL CLASSIFICATION IS "A"
U� RESIDENTIAL-> 5-7 DWELLINGS/ACRE SUBAREA LOSS RATE, Fm(INCH/HR) = .4850
SUBAREA AREA(ACRES) = 23.50 SUBAREA RUNOFF(CFS) = 67.03
EFFECTIVE AREA(ACRES) = 388.08
X� AVERAGED Fm(INCH/HR) = .479
m� TOTAL AREA(ACRES) = 413.20
PEAK FLOW RATE(CFS) = 1109.22
TC(MIN) = 14.80
****************************************************************************
FLOW PROCESS FROM NODE 36.00 TO NODE 36.00 IS CODE = 1
___________________________________________________________________________
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
===========================================================================
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MINUTES) = 14.80
RAINFALL INTENSITY (INCH./HOUR) = 3.65
W� EFFECTIVE STREAM AREA(ACRES) = 388.08
N� TOTAL STREAM AREA(ACRES) = 413.20
PEAK FLOW RATE(CFS) AT CONFLUENCE = 1109.22
****************************************************************************
FLOW PROCESS FROM NODE 40.00 TO NODE 39.00 IS CODE = 2
�-___________________________________________________________________________
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
===========================================================================
DEVELOPMENT IS SINGLE FAMILY RESIDENTIAL -> 5-7 DWELLINGS/ACRE
TC = K*[(LENGTH** 3.00)/(ELEVATION CHAN' )]** .20
INITIAL SUBAREA FLOW-LENGTH = 1600.00
N� UPSTREAM ELEVATION = 1550.00
DOWNSTREAM ELEVATION = 1518.00
ELEVATION DIFFERENCE = 32.00
U� TC = .389*[( 1600.00** 3.00)/( 32.00)]** .20 = 16.270
25 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.420
SOIL CLASSIFICATION IS "A"
RESIDENTIAL-> 5-7 DWELLINGS/ACRE SUBAREA LOSS RATE, Fm(INCH/HR) = .4850
m� SUBAREA RUNOFF(CFS) = 61.27
TOTAL AREA(ACRES) = 23.20 PEAK FLOW RATE(CFS) = 61.27
****************************************************************************
FLOW PROCESS FROM NODE 39.00 TO NODE 36.00 IS CODE = 3
___________________________________________________________________________
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
===========================================================================
6 DEPTH OF FLOW IN 36.0 INCH PIPE IS 26.2 INCHES
PIPEFLOW VELOCITY(FEET/SEC.) = 11.1
UPSTREAM NODE ELEVATION = 1518.00
DOWNSTREAM NODE ELEVATION = 1506.00
FLOWLENGTH(FEET) = 1100.00 MANNIN8S N = .013
ESTIMATED PIPE DIAMETER(INCH) = 36.00 NUMBER OF PIPES = 1
H� PIPEFLOW THRU SUBAREA(CFS) = 61.27
TRAVEL TIME(MIN.) = 1.65 TC(MIN.) = 17.92
***************************************************************************
FLOW PROCESS FROM NODE 38.00 TO NODE 36.00 IS CODE = 8
___________________________________________________________
>>>>>ADDITION OF SUBAREA TO MAINLINE PEAK FLOW<<<<<
25 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.196
N� SOIL CLASSIFICATION IS "A"
N� RESIDENTIAL-> 5-7 DWELLINGS/ACRE SUBAREA LOSS RATE, Fm(INCH/HR) = .4850
SUBAREA AREA(ACRES) = 21.60 SUBAREA RUNOFF(CFS) = 52.70
EFFECTIVE AREA(ACRES) = 44.80
AVERAGED Fm(INCH/HR) = .485
TOTAL AREA(ACRES) = 44.80
PEAK FLOW RATE(CFS) = 109.31
0
TC(MIN) = 17.92
m�
0
ul
**************************************************************************
N� FLOW PROCESS FROM NODE 38.00 TO NODE 36.00 IS CODE = 1
_-___________________________________________________________________________
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
>>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<<
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MINUTES) = 17.92
N� RAINFALL INTENSITY (INCH./HOUR) = 3.20
EFFECTIVE STREAM AREA(ACRES) = 44.80
TOTAL STREAM AREA(ACRES) = 44.80
U� PEAK FLOW RATE(CFS) AT CONFLUENCE = 109.31
CONFLUENCE INFORMATION:
STREAM PEAK FLOW TIME INTENSITY FM EFFECTIVE
NUMBER RATE(CFS) (MIN.) (INCH/HOUR) (IN/HR) AREA(ACRES)
______________________________________________________________
1 1109.22 14.80 3.654 .48 388.08
2 109.31 17.92 3.196 .48 44.80
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
SUMMARY RESULTS:
STREAM CONFLUENCE EFFECTIVE
NUMBER Q(CFS) AREA(ACRES)
____________________________________________
1 1214.74 425.07
2 1058.44 432.88
0� COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE(CFS) = 1214.74 TIME(MINUTES) = 14.797
EFFECTIVE AREA(ACRES) = 425.07
U� TOTAL AREA(ACRES) = 458.00
***************************************************************************
N� FLOW PROCESS FROM NODE 36.00 TO NODE 41.00 IS CODE = 3
____________________________________________________________________________
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING COMPUTER-ESTIMATED PIPESIZE (NON-PRESSURE FLOW)<<<<<
DEPTH OF FLOW IN 96.0 INCH PIPE IS 74.1 INCHES
PIPEFLOW VELOCITY(FEET/SEC.) = 29.2
N� UPSTREAM NODE ELEVATION = 1506.00
DOWNSTREAM NODE ELEVATION = 1503.00
FLOWLENGTH(FEET) = 150.00 MANNINGS N = .013
U� ESTIMATED PIPE DIAMETER(INCH) = 96.00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) = 1214.74
TRAVEL TIME(MIN.) = '09 TC(MIN.) = 14.88
***************************************************************************
FLOW PROCESS FROM NODE 42.00 TO NODE 44.00 IS CODE = 2
___________________________________________________________________________
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
DEVELOPMENT IS SINGLE FAMILY RESIDENTIAL -> 5-7 DWELLINGS/ACRE
TC = K*[(LENGTH** 3.00)/(ELEVATION CHANGE)]** .20
INITIAL SUBAREA FLOW-LENGTH = 1850.00
UPSTREAM ELEVATION = 1594.00
N� DOWNSTREAM ELEVATION = 1562.00
ELEVATION DIFFERENCE = 32.00
TC = .389*[( 1850.00** 3.00)/( 32.00)]** .20 = 17.751
25 YEAR RAINFALL INTENSITY (INCH/HOUR) = 3.217
SOIL CLASSIFICATION IS "A"
RESIDENTIAL-> 5-7 DWELLINGS/ACRE SUBAREA LOSS RATE, Fm(INCH/HR) = .4850
SUBAREA RUNOFF(CFS) = 69.10
TOTAL AREA(ACRES) = 28.10 PEAK FLOW RATE(CFS) = 69.10
FLOW PROCESS FROM NODE 45.00 TO NODE 46.00 IS CODE = 2
____________________________________________________________________________
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
DEVELOPMENT IS APARTMENTS
TC = K*[ (LENGTH** 3 00) / (ELEVATION CHANGE) 3** 20
. .
INITIAL SUBAREA FLOW-LENGTH = 1300.00
UPSTREAM ELEVATION = 1557.00
PR
mi DOWNSTREAM ELEVATION = 1529.00
��
m� ELEVATION DIFFERENCE = 28.00
TC = .324*[( 1300.00** 3.00)/( 28.00)3** .20 = 12.288
25 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4.162
SOIL CLASSIFICATION IS "A"
APARTMENTS SUBAREA LOSS RATE, Fm(INCH/HR) = .1940
SUBAREA RUNOFF(CFS) = 38.57
TOTAL AREA(ACRES) = 10'80 PEAK FLOW RATE(CFS) = . 38'57
END OF STUDY SUMMARY:
TOTAL AREA(ACRES) = 10.80
N� EFFECTIVE AREA(ACRES) = 10.80
PEAK FLOW RATE(CFS) = 38.57
===========================================================================
N� END OF RATIONAL METHOD ANALYSIS
��
BILL MANN & ASSOCIATES, INC.
Civil Engineering • Drainage — Flood Control • Special Studies
February_22, 1988
Mr. Joe Dilorio
The Caryn Company
2834 Terry Road
Laguna Beach, CA 92651
Subject: Design of San Sevaine Basin No. 5
Interim Development Mitigation
Dear Joe:
File: 87 -25
87 -27
Enclosed is a copy of the Interim Development Mitigation Report as required
under Task No. 3 of the Agreement for the Design of San Sevaine Basin No. 5.
The report_ reviews and recommends measures to mitigate the increase in
drainage runoff to be generated by proposed developments.
The Executive Summary briefly summarizes the report and recommendations. The
recommendations are outlined in Section V of the report and the various miti-
gation methods are discussed in Section IV. The primary effort will be to
modify the existing basin drain and spillway of Basin No. 5 and partially
excavate the proposed basin.
Although not specifically called for in the Agreement, the hydrology model
referenced in the report is presently being developed by Hall & Foreman and
Bill Mann & Associates.
Any comments and /or recommendations you have on - the report will be appre-
ciated.
Cordially,
BILL C. MANN,
'Consulting ngineer
BCM:sw
Enclosure
cc: Dave Hall, Engineering- Science w /encl
Lew Neeb, Flood Control District w /encl
Bob Schoenborn, City of Fontana w /encl
1814 COMMERCENTER WEST - SUITE A • SAN BERNARDINO, CA 92408 • (714) 885 -4309 • (714) 885 -5418
BILL MANN & ASSOCIATES, INC
Civil Engineering • Drainage — Flood Control • Special Studies
February 22, 1988
Fontana Heritage West'End Associates
c/o Barclay Associates
230 Newport Center Drive, Suite 300
Newport Beach, California 92660
Attention: Mr. Doug'Ford
Subject: Design of San Sevaine Basin No., 5
Interim Development Mitigation Report
Dear Doug:
File: 87 -25
87 -27
Enclosed is a copy of the Interim Development Mitigation Report as required
under -Task No. 3 of the Agreement for the Design of San Sevaine Basin No. 5.
The, report reviews and, recommends measures to mitigate the increase in
drainage runoff to be generated by proposed developments.
The Executive Summary briefly summarizes the report and recommendations. The
recommendations are outlined in Section V of the report and the various miti-
gation methods are discussed in Section IV. The primary effort will be to
modify the existing basin drain and spillway of Basin No. 5 and partially .
excavate the proposed basin.
Although not specifically called for in the Agreement, the hydrology model
referenced in the report is presently being developed by Hall & Foreman and
Bill Mann & Associates.
Any comments and /or recommendations you have on the report will be appre—
ciated.
Cordially,
.�-- --
BILL C. MANN, .E.
Consulting ngineer
BCM:sw
Enclosure
cc: Dave Hall, Engineering— Science w /encl.
Lew N.eeb, Flood Control District w /encl
Bob Schoenborn, City of,Fontana w /encl
a
1814 COMMERCENTER WEST - SUITE A • SAN BERNARDINO, CA 92408 • (714) 885 -4309 • (714) 885 -5418
BILL MANN & ASSOCIATES, INC.
Civil Engineering • Drainage — Flood Control • Special Studies
February 22, 1988
Fontana Heritage West End Associates
c/o Barclay Associates
230 Newport Center Drive, Suite 300
Newport Beach, California 92660
Attention: Mr. Roger Hatch
Subject: Design of San Sevaine Basin No. 5
Interim Development Mitigation Report
Dear Roger:
File: 87 -25
87 -27
Enclosed is a copy of the Interim Development Mitigation Report as required
under Task No. 3 of the Agreement for the Design of San Sevaine Basin No. 5.
The report reviews and recommends measures to -mitigate the increase in
drainage runoff to be generated by proposed
The Executive Summary briefly summarizes the report and recommendations. The
recommendations are outlined in Section V of the report and the various miti-
gation methods are discussed in Section IV. The primary effort will be to
modify the existing basin drain and spillway of Basin No. 5 and partially
excavate the proposed basin.
Although not specifically called for in the Agreement, the hydrology model
referenced in the report is presently being developed by Hall & Foreman and
Bill Mann & Associates..
Any comments and /or recommendations you-have on the report will' be appre-
ciated.
Cordially,
BI L C. MANN, .E.
Consulting Knginecr
BCM:sw
Enclosure
cc: Dave Hall, Engineering- Science w/encl
Lew Neeb, Flood Control District w /encl
Bob Schoenborn, City of Fontana w /encl
1 1 814 COMMERCENTER WEST - SUITE A • SAN BERNARDINO, CA 92408 • (714) 885 -4309 • (714) 885 -5418
BILL MANN & ASSOCIATES, INC.
Civil Engineering • Drainage — Flood Control • Special Studies
February 22, 1988
Mr. Barry
Karcher -Barry
200 North Harbor Boulevard
Suite 203
.Anaheim, California 92805
Subject: Design of San Sevaine Basin No. 5
Interim Development Mitigation Report
Dear Mr. Barry:
File: 87 -25
87 -27
Enclosed is a copy of the Interim Development Mitigation Report as required
under Task No. 3 of the Agreement for the Design of San Sevaine Basin No. 5.
The report reviews and recommends measures to mitigate the increase in
drainage runoff to be generated by proposed developments.
The Executive Summary briefly summarizes the report and recommendations. The
recommendations are outlined in Section V of the report and the various miti-
gation methods are discussed in Section IV. The primary effort will be to
modify the existing basin drain and spillway of Basin No. 5 and partially
excavate the proposed basin.
Although not specifically called for in the Agreement, the hydrology model
referenced in the report is presently being developed by Hall & Foreman and
Bill Mann & Associates.
Any comments and /or recommendations you have on the report will be appre-
ciated.
Cordially,
BI L C. MANN, .E.
Consulting ngineer
BCM:sw
Enclosure
cc: Dave Hall, Engineering- Science w /encl
Lew Neeb, Flood Control District w /e,ncl /
Bob Schoenborn, City of Fontana w /encl/
1814 COMMERCENTER WEST - SUITE A • SAN BERNARDINO, CA 92408 • (714) 885 -4309 • (714) 885 -5418
BILL- MANN & ASSOCIATES, INC.
Civil. Engineering • Drainage -- Flood Control • Special Studies
February 22, 1988 File: 87 -25
87 -27
Lewis Homes of California
c/o Lewis /Coussoulis /Johnson
Post Office Box 670
Upland, California 91785
Attention: Mr. Rick Gomes
Senior Project Manager
Subject: Design of San Sevaine Basin No. 5
Interim Development Mitigation Report
Dear Mr. Gomes:
Enclosed is a copy of the Interim Development Mitigation Report as required
under Task No. 3'of the Agreement for the Design of San Sevaine Basin No. 5.
The report reviews and recommends measures to mitigate the increase in
drainage runoff to be generated by proposed developments.
The Executive Summary briefly summarizes the report and recommendations. The
recommendations are outlined in Section V of the report and the various miti—
gation methods are discussed in Section IV. The primary effort will be to
modify the existing basin drain and. spillway of Basin No. 5 and partially
excavate the.proposed basin.
Although not specifically called for in the Agreement, the hydrology model
referenced in the report i's presently being developed by Hall & Foreman and
Bill Mann & Associates.
Any comments and /or recommendations you have on the report will -be appre—
ciated.
Cordially,
BILL C. MAN �E.
Consulting pngi.neer
BCM:sw
Enclosure
cc: Dave Hall, Engineering— Science w /encl
Lew Neeb, Flood Control District w /encl
'Bob Schoenborn, City of Fontana w /encl
1814 COMMERCENTER WEST - SUITE A • SAN BERNARDINO, CA 92408 • (714) 885 -4309 • (714) 885 -5418
BILL MANN & ASSOCIATES, INC.
Civil Engineering • Drainage — Flood Control • Special Studies
February 22, 1988 File: 87 -25
87 -27
Mr. David Mansfield
The Centennial Group, Inc.
282 South Anita Drive
Orange, California 92668
Subject: Design of San Sevaine'Basin No. 5
Interim Development Mitigation Report.
Dear Mr. Mansfield:
Enclosed is a copy of the Interim Development Mitigation Report as required
under Task No. 3 of the Agreement for the Design of San Sevaine Basin No. 5.
The report reviews and recommends measures to mitigate the increase in
drainage runoff to be generated by proposed developments.
The Executive Summary briefly summarizes the report and recommendations. The
recommendations are outlined in Section V of the report and the various miti-
gation. methods are discussed in Section IV. The primary effort will be to
modify the existing basin drain and spillway of Basin No. 5 and partially
excavate the proposed basin.
Although not specifically called for in the Agreement, the hydrology model
referenced in the report is presently being developed by Hall & Foreman and
Bill Mann & Associates.
Any comments and /or recommendations you have on the report will be appre-
ciated.
Cordially,
4t�c..
BI L C. MANN/,P.E.
Consulting j?nsi.neer
BCM:sw
Enclosure
cc: Dave Hall, Engineering- Science w /encl
Lew Neeb, Flood Control District w /encl
Bob Schoenborn, City of Fontana w /encl
1814 COMMERCENTER WEST - SUITE A • SAN BERNARDINO, CA 92408 • (714) 885 -4309 • (714) 885 -5418
BILL MANN Rc A SSOCIATES, INC.
Civil Engineering • Drainage — Flood Control • Special Studies
February 22, 1988 File: 87 -25
87 -27
Mr. Nicholas Pappas
First City Properties, Inc.
8383 Wilshire Boulevard
Suite 800
Beverly Hills, California 90211
Subject: Design of San Sevaine Basin No. 5
Interim Development Mitigation Report
Dear Mr. Pappas:
Enclosed is a copy of the Interim Development Mitigation Report as required
under Task No. 3 of the Agreement for the Design of San Sevaine Basin No. 5.
The report reviews and recommends measures to mitigate the increase in
drainage runoff to be generated by proposed developments.
The Executive Summary briefly summarizes the report and recommendations. The
recommendations are outlined in Section V of the report and the various miti-
gation methods are discussed in Section IV. The primary effort will be to
modify the existing basin drain and spillway of Basin No. 5 and partially
excavate the proposed basin.
Although not specifically called for in the Agreement, the hydrology model
referenced in the report is presently being developed by Hall & Foreman and
Bill Mann & Associates.
Any comments and /or recommendations you have on the report will be appre-
ciated.
Cordially,
BILL C. MANN, E.
Consulting gngineer -
BCM:sw
Enclosure
cc: Dave Hall, Engineering- Science w /encl
Lew Neeh, Flood Control District w /encl
Bob Schoenborn, City of Fontana w /encl -'
c. � . P. 1eO12P • �� s
� ro co r)
1814 COMMERCENTER WEST - SUITE A • SAN BERNARDINO, CA 92408 • (714) 885 -4309 • (714) 885 -5418
T
_ _
....... .. --- _____
_ _ - iliVERTECH
____ , , INC
__CONSULTANTS IN WATER RESOURCES ENGINEERING ---
_.._. .__7.117._. c :..- =:-
June 29, 1988
Mr. Pat Mead, P.E.
Environmental Public Works Agency
County of San Bernardino
825 East Third Street, Room 120
San Bernardino, CA 92415 -0835
Re: Proposed Concept for Stormwater Management - Rich
Basin and Hawker - Crawford Channel.
Dear Mr. Mead:
In accordance with your advise, we are submitting a
proposed concept to manage the stormwater in Rich Basin and
Hawker - Crawford Channel.
During our previous meetings, Mr. Lewis Neeb and yourself
had indicated that Rich Basin and Hawker - Crawford Channel
represent regional facilities that should be analyzed as
integral parts of the San Sevaine retention basin system.
In compliance with this requisite, we have developed a
conceptual plan for Rich Basin and Hawker - Crawford
Channel. The concept is based on a two - phased construction
program. The first phase would offset the increased storm
runoff as a result of the proposed Hunters Ridge
Development. The second phase, or ultimate phase, would
provide a solution for the fully developed watershed
conditions.
The following paragraphs describe the objectives of the
proposed concept:
• Provide a solution to allow progression of Hunters
Ridge Development while satisfying the
requirements of the Environmental Public Works
Agency.
• Provide regional facilities which meet the near
future requirements and have the expansion
capacity for fully developed watershed conditions.
Our proposed concept is shown in the attached drawing
entitled " Proposed Concept Plan for Rich Basin and Hawker -
Crawford Channel ". Our preliminary hydrologic and
1400 QUAIL STREET / SUITE 210 / NEWPORT BEACH, CA 92660 / (714) 752 - 8722
Mr. Pat Mead, P.E.
June 29, 1988
Page 2 . . . .
hydraulic analysis, based on the revised criteria for
detention basins, revealed that only a portion of the
property allocated for detention at Rich Basin may be used
to offset the increased runoff as a result of Hunters Ridge
Development. Fortunately, the required storage is such
that the proposed Rich Basin modifications will not fall
under State of California jurisdiction. This is shown in
the attached Figure.
I would appreciate it
proposed concept for mod
Crawford Channel. After
convenience, we would
Neeb, and Ms. Vana Olson
subject modifications.
Sincerely,
RIVERTECH IN .
A/S"
very much if you could review our
ification of Rich Basin and Hawker -
your review, and at your earliest
like to meet with you, Mr. Lewis
to obtain further guidance on the
Hasan Nouri
President
HN:lg
cc: Mr. Nicholas Pappas
Mr. Ron Sheldon
1615
1610
1605
LL
z
z
O 1600
w
J
W 1595
1590
158
i
i
i
I
I
1595.2=EXISilNG SPILLWAY ELEV.
i
I
1
i �2 �,,k, i
" f i
ST 1584.0 PILLWAY TOE ELEV. I
0 5 20 30 40 44.5 50
STORAGE -IN AC -FT.
60 70 80
mns
RIVERTECH PROPOSED ELEVATION - STORAGE RELATIONSHIP FIGURE
v INC AT RICH BASIN
J. P. KAPP & ASSOCIATES, INC.
CIVIL ENGINEERS, LAND PLANNERS, & SURVEYORS
July 18, 1988
City of Fontana
8353 Sierra
Fontana, California 92335
Attention: Bob Porter
Subject: Hunter's Ridge
Dear Bob:
We are pleased to submit these hydrology calculations and map for
the plan check on Hunter's Ridge project. This refinement of the
previous calculations is based on a 25 year storm for main line,
100 year storm within the curbs, is consistent with the approved
tentative map, and used the latest SBCFCD manual.
Please give me a call when your plan check is completed so that we
may discuss your comments.
Sincerely,
J. P. KAPP AND ASSOCIATES, INC.
Ronald P. Sheldon, P.E.
Vice President /Project Manager
RPS /jk
Attachments
15892 PASADENA AVE., TUSTIN, CALIFORNIA 92680, 714/730 -5757
J. P. KAPP & ASSOCIATES, NC.
CIVIL ENGINEERS, LAND PLANNERS, &SURVEYORS
July 8, 1988
George Caswell
City of Fontana
Public Works Department
8353 Sierra Avenue
Fontana, California 92335
Subject: Hunter's Ridge
Dear George:
Please find attached a copy of our conceptual proposal recently
submitted to the San Bernardino Flood Control District for the
improvement of Rich Basin.
We are suggesting these improvements as mitigation of the peak
flows for the Hunter's Ridge project.
Should you have any comments, your prompt written response is
appreciated.
Sincerely,
Ronald P. Sheldon, P.E.
Vice President
Attachments
RPS : j s
cc: Nick Papas
Diana Needham
Reed Flory
Bob Porter
, �eJ'
1 90
T 4 - 0
15892 PASADENA AVE., TUSTIN, CALIFORNIA 92680, 714/730 -5757