HomeMy WebLinkAbout4854-39STORM DRAIN/
UNDERGROUND UTILITIES R SHINGLE NAIL
SEE NOTE 3 LODGE POLE
TREE TRUNK
1
CINCH TIE
TRE` TRUNK z i SIDEWALK (DO NOT TWIST)
J
J.
POLE
�----WONDER TREE TIE -ATTACH I ' PREVAILING WIND
TO TURNBUCKLE pd I IDIRECTION
TURNBUCKLE I CURB AND GUTTER METER
'
10 GAGE GALV. WIRE 5
/ rrp. nrP.
TREE PER PLAN
2" DIA LODGEPOLE PINE TREE
UNDERGROUND STRUCTURE STAKE COPPER NAPTHENATE
PERMANENT BASIN TAPER 1:1 MAX. CUT ARBORGUARD IN TURF AREAS CATCH BASIN TREATED AND DRIVEN IN GROUND
EXISTING 3. SLOPE ® PLANT PIT AND FRONT YARDS ( TR!
FORMER VAULT. I TO 2FT. MIN. DEPTH. 2 REQ'D
SLOPE FERTILIZER TABLETS R�_
L SIDEWALK
(SEE SPECS.) i I i
_ — I 'CINCH TIE' (4) REQ'D
DRIVE s,l.. r z a I /lAPPROACHilL to• ��� I S ARBOR GUARD IN TURF AREAS
ROOTBALL ' PREPARED BACKFILL MIX,
2X1THE XWIDTH O�OTBALL R ROOTBALL H �� „ � CURB AND GUTTER I I � •) g" I SEE SPECIFICATIONS
BACKFILL MIX. (SEE SPECS.
1 /2 SCH.40 PVC SLEEVE 5 56 5' 10• ��
ao
MIN MIN MIN �— MIN � MIN ��
PUDDLE AND SETTLE BACKFIL 3 HIGH WATER BASIN,
PRIOR TO PLACEMENT OF SHRUB I
6" EARTH BERM- REMOVE AT TIME OF PLANTING
I I_ +: --I, I I PRIOR TO SEEDING NOTES: r
I I� —I I c— 1. TREE SPACING SHALL CONFORM TO PLANS APPROVED BY �� r— �I I FINISH GRADrE
`� I=� { THE CITY ENGINEER
0 1= :• - a 4"X4"X36" RDWD. DEADMAN { i= =) { �_) { {-_�{ � { - 11-
I �. 2. ALL TREES IN THE R.O.W. ARE SUBJECT TO LINE.OF.SIGHT
CRITERIA AS APPROVED BY TRAFFIC ENGINEER. _) I {= AGRIFORM TABLETS TO BE
I—
ills. PLANT PIT - i / 1/2X SIZE 3. AT ALL LOCAL RESIDENTIAL INTERSECTIONS THE FIRST TWO= — — — ADDED PER MFG. RECOM Ds.
OF PLANT BALL PARKWAY TREES AT ALL APPROACHES TO BE PLACED BEHIND SIDEWALK.
PLANT TABLET- SEE SPECS, 4. MAINTAIN 10 FEET FROM CENTER OF STREET TO EDGE
OF ALL UNDERGROUND FACILITIES.
4. MAINTAIN 10 FEET FROM ALL STREET LIGHTS, UTILITIES 2X DIA. OF
STRUCTURES AND VALVE BOXES. ROOT BALL
�ROFESS] p ROVED BY: CITY OF FONTANA �o Q�°fEss�� P OVED BY: CITY OF FONTANA o ItOVESS/py�l AP OVED BY: CITY OF FONTANA ESS1diYge APP oVED Y: CITY OF FONTANA
No. 51152 %CITY ENGINEER DATE SHRUB ON SLOPE No. 51152 CITY ENGINEER DATE TREE GUYING No. 51152 CITY ENGINEER BATE TREE PLACEMENT `� No. 51152 CITY ENGINE DATE TREE STAKING
RICARDO S,ANDOVAI. RICARDO SANDOVAL
RICARDO SANDOVAL RICARDO SANDOVAL
*
EXP. 91300
* EXP. 9130103 Timat Raat .dt * EXP. 9130105 * * EXP. 9130105
REVIEWED BY: Timat Rastedt CML REVIEWED BY: h= REVIEWED BY:
►,mothv Rastedt REVIEWED BY. Simo�1}I Rastect
s CML � 1-26-00 CML Q, CML
r-�lf of CkOT DATE OF LAST REVISION: 1-28-� STD. PLAN NO. 5036 SHT '� OF 'I rF of CALtiDATE OF LAST REVISION: STD. PLAN N0. 5032 SHT 'I OF 'i �rF of Call�°Q'- DATE OF LAST REVISION: -28-00 STD. PLAN NO. 5033 SHT '� OF �jF Of CpL,��� DATE OF LAST REVISION: 1-28-00 STD. PLAN N0, 5031 SHT 7 OF 1
EDGE DETAIL
MIN. 6" THICK CONCRETE PAVING
BULLNOSE EDGE
v
° v
4" Q I III
v 4
- av II III I 1..
211 EXTENDED COLLAR AT
°° III I I I PERIMETER EDGE DETAIL - ABUTING EXISTING CONCRETE
3" BERM TO FORM III I I III III III I I IELI MIN. 6" THICK CONCRETE EXISTING CONCRETE
PERMANENT BASIN WATER BASIN Y2' BULLNOSE EDGE
-IIIIII,,, II III II III I��-
-I
r 10" 95% COMPACTED a v +
FERTILIZER TABLETS SUBGRADE PRIOR TO POUR 2 4 ° 4 °
I I- COLD JOINT •- a
° v 4
'' I I I ROOTBALL 1/2" R 2" ° #4 REBAR AT 18" O.C. CORE AND EPDXY Y2'
1 1/2-X MIN. ROOTBALL DEPTH . , � _ _I � IN BOTH DIRECTIONS v DIA. TAPERED STEEL
2x THE WIDTH OF ROOTBALL
BACKFILL MIX. ° ° ° WRAP EXPOSED END
a ° a ° REINFORCEMENT (MIN. 2 I 1 1 1 III III I I I I III I I III_
PUDDLE AND SETTLE BACKrIL 4" v 4 ° ° COVER) _ 11
1 _1 1 1 i IN PARAFIN PAPER
PRIOR T4 PLACEMENT OF SHRUB I I o
- I 1 95 /a COMPACTED
SUBGRADE PRIOR TO POUR
CONTROL JOINT
1/2" R
4 a s� 6X6 10/10 E.W.W.F.
° a REINFORCEMENT
4„ v v. ia"
v Q
v
° v a
.°
�o Q�oFfssla,�` oVED BY: CITY OF FONTANA
No. 51152 ITY ENGINEER DATE SHRUB PLANTING
RICARDO SANDOVAL
� EXP, 9130105
srAj CML REVIEWED BY: limo+hyL$nstedt
E of CALDATE of LAST REVISION: 1-26—
04 STD. PLAN NO. 5435 SHT OF 1 CONCRETE PAVING DETAIL 2 CONCRETE EDGE AT EXISTING PAVING DETAIL 3 NOT USED
DATE SUBMITTAL TRACKER CITY 0 F FO NTANA, CALIFORNIA
10-23-09 DEPARTMENTAL REVIEW Q D SHOULD CONSTRUCTION O F THE REQUIRED \uANDS��F
01-22-10 ARST PLAN CHECK SUBMITTAL IMPROVEMENTS NOT COMMENCE WITHIN TWO '�' ���� E "''<<F -9� FONTANA CAMPUS PARKING LOT
03-09-10 SECOND PLAN CHECK SUBMITTAL - rlo
YEARS OF THE DATE OF APPROVAL SHOWN HEREON � � � � ?� DRAWN BY: SCALE -
06 -29-10 THIRD PLAN CHECK SUBMITTAL AND CARRIED FORTH IN A DILIGENT MANNER, THE � AC, SM H RDS E D ETAI LS
TW❑ WORKING �MGMATUREN.T.S.
09-02-10 FOURTH PLAN CHECK SUBMITTAL DIAL CITY ENGINEER MAY REQUIRE REVISIONS TO THE y DESIGNED BY: DATE:
BEFORE .O DAYS BEFORE 9/30/11
YOU DIG YOU DIG PLANS TO BRING THEM INTO CONFORMANCE WITH EXP.DATE SM, EL 10-23-09
TOLL FREE 1-800-227-2600 REV STANDARDS IN EFFECT �o���P CHECK D : D !� �•/ DRAWING NO.: 9
A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT REVISION DESCRIPTION DATE MGR. CITY DATE of CAS DATE: ` 4854
BM 39