Loading...
HomeMy WebLinkAbout4854-39STORM DRAIN/ UNDERGROUND UTILITIES R SHINGLE NAIL SEE NOTE 3 LODGE POLE TREE TRUNK 1 CINCH TIE TRE` TRUNK z i SIDEWALK (DO NOT TWIST) J J. POLE �----WONDER TREE TIE -ATTACH I ' PREVAILING WIND TO TURNBUCKLE pd I IDIRECTION TURNBUCKLE I CURB AND GUTTER METER ' 10 GAGE GALV. WIRE 5 / rrp. nrP. TREE PER PLAN 2" DIA LODGEPOLE PINE TREE UNDERGROUND STRUCTURE STAKE COPPER NAPTHENATE PERMANENT BASIN TAPER 1:1 MAX. CUT ARBORGUARD IN TURF AREAS CATCH BASIN TREATED AND DRIVEN IN GROUND EXISTING 3. SLOPE ® PLANT PIT AND FRONT YARDS ( TR! FORMER VAULT. I TO 2FT. MIN. DEPTH. 2 REQ'D SLOPE FERTILIZER TABLETS R�_ L SIDEWALK (SEE SPECS.) i I i _ — I 'CINCH TIE' (4) REQ'D DRIVE s,l.. r z a I /lAPPROACHilL to• ��� I S ARBOR GUARD IN TURF AREAS ROOTBALL ' PREPARED BACKFILL MIX, 2X1THE XWIDTH O�OTBALL R ROOTBALL H �� „ � CURB AND GUTTER I I � •) g" I SEE SPECIFICATIONS BACKFILL MIX. (SEE SPECS. 1 /2 SCH.40 PVC SLEEVE 5 56 5' 10• �� ao MIN MIN MIN �— MIN � MIN �� PUDDLE AND SETTLE BACKFIL 3 HIGH WATER BASIN, PRIOR TO PLACEMENT OF SHRUB I 6" EARTH BERM- REMOVE AT TIME OF PLANTING I I_ +: --I, I I PRIOR TO SEEDING NOTES: r I I� —I I c— 1. TREE SPACING SHALL CONFORM TO PLANS APPROVED BY �� r— �I I FINISH GRADrE `� I=� { THE CITY ENGINEER 0 1= :• - a 4"X4"X36" RDWD. DEADMAN { i= =) { �_) { {-_�{ � { - 11- I �. 2. ALL TREES IN THE R.O.W. ARE SUBJECT TO LINE.OF.SIGHT CRITERIA AS APPROVED BY TRAFFIC ENGINEER. _) I {= AGRIFORM TABLETS TO BE I— ills. PLANT PIT - i / 1/2X SIZE 3. AT ALL LOCAL RESIDENTIAL INTERSECTIONS THE FIRST TWO= — — — ADDED PER MFG. RECOM Ds. OF PLANT BALL PARKWAY TREES AT ALL APPROACHES TO BE PLACED BEHIND SIDEWALK. PLANT TABLET- SEE SPECS, 4. MAINTAIN 10 FEET FROM CENTER OF STREET TO EDGE OF ALL UNDERGROUND FACILITIES. 4. MAINTAIN 10 FEET FROM ALL STREET LIGHTS, UTILITIES 2X DIA. OF STRUCTURES AND VALVE BOXES. ROOT BALL �ROFESS] p ROVED BY: CITY OF FONTANA �o Q�°fEss�� P OVED BY: CITY OF FONTANA o ItOVESS/py�l AP OVED BY: CITY OF FONTANA ESS1diYge APP oVED Y: CITY OF FONTANA No. 51152 %CITY ENGINEER DATE SHRUB ON SLOPE No. 51152 CITY ENGINEER DATE TREE GUYING No. 51152 CITY ENGINEER BATE TREE PLACEMENT `� No. 51152 CITY ENGINE DATE TREE STAKING RICARDO S,ANDOVAI. RICARDO SANDOVAL RICARDO SANDOVAL RICARDO SANDOVAL * EXP. 91300 * EXP. 9130103 Timat Raat .dt * EXP. 9130105 * * EXP. 9130105 REVIEWED BY: Timat Rastedt CML REVIEWED BY: h= REVIEWED BY: ►,mothv Rastedt REVIEWED BY. Simo�1}I Rastect s CML � 1-26-00 CML Q, CML r-�lf of CkOT DATE OF LAST REVISION: 1-28-� STD. PLAN NO. 5036 SHT '� OF 'I rF of CALtiDATE OF LAST REVISION: STD. PLAN N0. 5032 SHT 'I OF 'i �rF of Call�°Q'- DATE OF LAST REVISION: -28-00 STD. PLAN NO. 5033 SHT '� OF �jF Of CpL,��� DATE OF LAST REVISION: 1-28-00 STD. PLAN N0, 5031 SHT 7 OF 1 EDGE DETAIL MIN. 6" THICK CONCRETE PAVING BULLNOSE EDGE v ° v 4" Q I III v 4 - av II III I 1.. 211 EXTENDED COLLAR AT °° III I I I PERIMETER EDGE DETAIL - ABUTING EXISTING CONCRETE 3" BERM TO FORM III I I III III III I I IELI MIN. 6" THICK CONCRETE EXISTING CONCRETE PERMANENT BASIN WATER BASIN Y2' BULLNOSE EDGE -IIIIII,,, II III II III I��- -I r 10" 95% COMPACTED a v + FERTILIZER TABLETS SUBGRADE PRIOR TO POUR 2 4 ° 4 ° I I- COLD JOINT •- a ° v 4 '' I I I ROOTBALL 1/2" R 2" ° #4 REBAR AT 18" O.C. CORE AND EPDXY Y2' 1 1/2-X MIN. ROOTBALL DEPTH . , � _ _I � IN BOTH DIRECTIONS v DIA. TAPERED STEEL 2x THE WIDTH OF ROOTBALL BACKFILL MIX. ° ° ° WRAP EXPOSED END a ° a ° REINFORCEMENT (MIN. 2 I 1 1 1 III III I I I I III I I III_ PUDDLE AND SETTLE BACKrIL 4" v 4 ° ° COVER) _ 11 1 _1 1 1 i IN PARAFIN PAPER PRIOR T4 PLACEMENT OF SHRUB I I o - I 1 95 /a COMPACTED SUBGRADE PRIOR TO POUR CONTROL JOINT 1/2" R 4 a s� 6X6 10/10 E.W.W.F. ° a REINFORCEMENT 4„ v v. ia" v Q v ° v a .° �o Q�oFfssla,�` oVED BY: CITY OF FONTANA No. 51152 ITY ENGINEER DATE SHRUB PLANTING RICARDO SANDOVAL � EXP, 9130105 srAj CML REVIEWED BY: limo+hyL$nstedt E of CALDATE of LAST REVISION: 1-26— 04 STD. PLAN NO. 5435 SHT OF 1 CONCRETE PAVING DETAIL 2 CONCRETE EDGE AT EXISTING PAVING DETAIL 3 NOT USED DATE SUBMITTAL TRACKER CITY 0 F FO NTANA, CALIFORNIA 10-23-09 DEPARTMENTAL REVIEW Q D SHOULD CONSTRUCTION O F THE REQUIRED \uANDS��F 01-22-10 ARST PLAN CHECK SUBMITTAL IMPROVEMENTS NOT COMMENCE WITHIN TWO '�' ���� E "''<<F -9� FONTANA CAMPUS PARKING LOT 03-09-10 SECOND PLAN CHECK SUBMITTAL - rlo YEARS OF THE DATE OF APPROVAL SHOWN HEREON � � � � ?� DRAWN BY: SCALE - 06 -29-10 THIRD PLAN CHECK SUBMITTAL AND CARRIED FORTH IN A DILIGENT MANNER, THE � AC, SM H RDS E D ETAI LS TW❑ WORKING �MGMATUREN.T.S. 09-02-10 FOURTH PLAN CHECK SUBMITTAL DIAL CITY ENGINEER MAY REQUIRE REVISIONS TO THE y DESIGNED BY: DATE: BEFORE .O DAYS BEFORE 9/30/11 YOU DIG YOU DIG PLANS TO BRING THEM INTO CONFORMANCE WITH EXP.DATE SM, EL 10-23-09 TOLL FREE 1-800-227-2600 REV STANDARDS IN EFFECT �o���P CHECK D : D !� �•/ DRAWING NO.: 9 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT REVISION DESCRIPTION DATE MGR. CITY DATE of CAS DATE: ` 4854 BM 39