HomeMy WebLinkAbout4854-1ONSITE LANDSCAPE PLAN
FOR
.Fl.,�l TAIqA CANIPUS PARI(Il G LOT
FONTANA, CALIFORNIA
8353 SIERRA AVE FONTANA, CA 92335
PHONE: (951)680�0440 CONTACT: TERRY RENNER
UPLAND AVE
w
mmm
® Q
® v v w
® _
W-
W— ENGINEERING
CITY HALL =
®®®®�
®3
®o
66 FOOTHILL BLVD ON
1111111 Dum.,iiiiian
E® o
J
IVY AVE
o DEVELOPMENT % ®®
UPLAND AVE ¢ SERVICES ® POLICE
15 :.:..:. w PROJECT SITE ® ® w
SEVILLE AVE'*.*.*
®Q
Q ®®®
ARROW BLVD SEVILLE AVE
U-1
w
w 55W
W3: TWFFFW
ORANGE WAY —M
E
Jpa Ima ISM ism
LIBRARY AMPHITHEATER
MERRILL AVE
Limit of Work
w > > ®®®®®
Q
Cl) < 0 �
{.ice I � t < 6
Uc)
THEATER ® UPLAND AVE
VICINITY MAPCHAMBER OIC ® FIRE
COMMERCE ® ® STATION
N.T.S. LOCATION MAP
N.T.S.
®®®®®®® OF ARROW BLVD
Landscape Water Use Calculations
LANDSCAPE CONSTRUCTION NOTES: HOLD HARMLESS & INDEMNIFICATION CLAUSE FONTANA CAMPUS PARKING LOT
1. The design shown is diagrammatic, the contractor shall review the site conditions prior (For projects with more than 1 hydrozone)
to bidding. Contractor agrees that they shall assume sole responsibility for job site conditions during
2. The contractor shall provide for positive drainage away from all structures at a 1 % the course of construction of this project , including safety of all persons and property, 1 Maximum Annual Water Allowance (MAWA)
minimum for hardscape areas and a 2% minimum for landscaped areas unless that this requirement shall apply continuously and not be limited to normal working hours,
otherwise directed by the civil engineering plans. and hold the county and the landscape architect harmless from any and all liability real or INPUT the total square footage of landscape = 43,942 S.F.
3. The contractor must notify the Landscape Architect, (951) 737-1124, 48 hours prior alleged, in connection with the performance of work on this project, excepting for liability INPUT the Hist. ETo for the area =r 56.37
to starting construction. arising from the sole negligence of the owner, or the landscape architect.
4. The contractor shall be responsible for obtaining building permits prior to MAWA = 1,437 gal / yr
commencing construction.
5. The contractor shall notify the architect if discrepancies exist between existing site 2 Estimated Annual Water Use (EAWU)
conditions and plans.
6. All construction shall meet or exceed local controlling jurisdiction. Hydrozone # 1 INPUT Plant Factor= 0.8 (Tum
7. The contractor shall take great care to protect existing site amenities during the MAINTENANCE NOTES: INPUT square footage of hydrozone = 7,464
process of construction. Items not specifically identified for protection shall be 1. Minimum of 90 days maintenance on this project is required starting after the first mowing INPUT hydrozone irrigation efficiency = 0.9
protected in place. of the established grass areas. EAWU = 310 gal I yr
8. The contractor shall remove rocks greater than 1" in dia. from within the top 12 " of the 2. Maintenance of facility shall be continuously done and the contractor must provide a
finish grade of the turf areas. weekly schedule. Contractor personnel must check in with Landscape Hydrozone # 2 INPUT Plant Factor= 0.4 (Mev)
9. All landscape areas other than turf shall receive a minimum of 3" medium grind bark Inspector/Technician to verify continuous maintenance on facility. INPUT square footage of hydrozone = 36,478
mulch. 3. "As Builts" Shall be labeled "Record Drawings" Contractor is responsible for providing City INPUT hydrozone irrigation efficiency - 0.9
10. Upon the completion of the rough grading the landscape contractor shall engage "The staff with mylars of "Record Drawings" as part of turnover items before final completion EAWLI = 758 gal / yr
Soil and Plant Lab" or equal to perform soils samples & tests for agricultural suitability. and release of project.
All results shall be submitted to the Owner & Landscape Architect. Soil amendment SubTotal EAWU = 1 068 gal / yr
P 4. "Turn Over Items" Shall include a handheld remote device to remotely control and inspect Input Irrigation System Operation Factorl 0.85
specifications shall be modified to reflect the recommendation set forth in the soils irrigation system.
report. Total EA1NU = 1,256
MAWA -e, EAWU = 181 Icu ft / yr
(this number must be positive)
Sheet List Table
Sheet Number
Sheet Title
1
TITLE SHEET
E-1
NEW ELECTRICAL - NORTH
E-2
NEW ELECTRICAL - SOUTH
E-3
EXISTING ELECTRICAL - DEMOLITION NORTH
E-4
EXISTING ELECTRICAL - DEMOLITION SOUTH
E-5
ELECTRICAL DETAILS
E-6
NEW ELECTRICAL WORK - NEW CANOPY AREA
E-7
PARTIAL EXISTING ELECTRICAL CONDITIONS -
DATA AND COMMUNICATIONS
E-8
TITLE 24 CALCULATIONS
10
HARDSCAPE PLAN
11
IRRIGATION PLAN
12
IRRIGATION PLAN
13
IRRIGATION PLAN
14
IRRIGATION PLAN
15
IRRIGATION PLAN
16
IRRIGATION PLAN
17
IRRIGATION PLAN
18
IRRIGATION PLAN
19
IRRIGATION PLAN
20
IRRIGATION PLAN
21
IRRIGATION PLAN
22
IRRIGATION PLAN
23
IRRIGATION LEGEND
24
IRRIGATION DETAILS
25
IRRIGATION DETAILS
26
IRRIGATION DETAILS
27
PLANTING PLAN
28
PLANTING PLAN
29
PLANTING PLAN
30
PLANTING PLAN
31
PLANTING PLAN
32
PLANTING PLAN
33
PLANTING PLAN
34
"", PLANTINQ- RLAN
35
-
PLANTING! PLAN
36
PtANTI:NG",PLAf�
37
PL/NTIN.G: PLAN
38
PLANTING PLAN
39
HARDSCAPE DETAILS
DATE SUBMITTAL TRACKER CITY 0 F FONTANA, CALIFORNIA
10-23-09 DEPARTMENTAL REVIEW Q D SHOULD CONSTRUCTION OF THE REQUIRED err
NDS�gp�01-22-10 FIRST PLAN CHECK SUBMITTAL IMPROVEMENTS NOT COMMENCE WITHIN TWO� "''<<F -9� FONTANA CAMPUS PARKING LOT
03-09-10 SECOND PLAN CHECK SUBMITTAL oYEARS OF THE DATE OF APPROVAL SHOWN HEREONP 2'`�� DRAWN BY. SCALE
06-29-10 THIRD PLAN CHECK SUBMITTALvvvvvwm
AND CARRIED FORTH IN A DILIGENT MANNER, THE � AC, SM TITLES EET N.T.S.
SIGNATURE
09-02-10 FOURTH PLAN CHECK SUBMITTAL DIAL TWO WORKING CITY ENGINEER MAY REQUIRE REVISIONS TO THE —' DESIGNED BY: DATE:
BEFORE DAYS BEFORE 9/30/11
YOU DIG YOU DIG PLANS TO BRING THEM INTO CONFORMANCE WITH EXP. DATE P SM, EL 10-23-09
A PUBLICTOLL FREE
SERV I CE BY UNDERGROUND 0— 227 -
SERVICE ALERT STANDARDS IN EFFECT lF OF L �FO��\ CHECKED K l APP � o . 1d DRAWING NO.:Z39
REVISION DESCRIPTION DATE ENGR. CITY DATE �A BM DATE: 4 a54