Loading...
HomeMy WebLinkAboutArea 2 AREA 2 Rational method, 100 year storm Yb calculation — -- - Aimm•■••■•■■•••■•■• i . (\vow .. . . eitio u= 1 ....or • ' 1 0 Us ) g p , , i g 46, i 0 4 4 i 1 I P or % • 1 f E I ! 1 • , • " • I i p i 11 z i: 4 ALI: , , 0 •-• - - At 4 1 0 i I AI I OM n :il m g 2 eb 1 1 1 c4 g . s : 1 1 It IP • 0 • I , ii r l _l • itil milr a 111 93 1 i i u go: 1 . • it a • I 0 • . 1 , 1 ora w • • 9 4 40 s e 4 mir I 1 *I III * r I i • 11111 imormair la 0111 _ Imilill s • - ' - 10.11.11011 t ---''<-....litillIrarn fl II 11111i 0 ii 1 1 mi : g et i ibv , i : 11/4. 0. / • 1 _li 4 i , rift 1 . - TioarinLil r I Pr' I 1 i 0 11 1 if • t 1 . ill ill : 1 a , 1 i / 7 e i . 7 5 , f " 1 1 1 Flit ! 11 11 1 1 4 i 10 • 0 I 0 11 111 IT" 4 ifi i I lip . 1 t wine 1, i It i 8 1 I fill* 6 I 4 csi r I f MP I r k , • ‘It t 1 i ill ri , , / int_ ;,„........ , , . • f 4.,r itIC r I I A t lir r I * I ) I 1 I t 4 ‘..,. 1 4,..... 470..1. ,...!,.. ,ii i Ft* o r I 4r- FA,. e nat.?.F.A ,O , of 0 • • "ft I A JP 71 : e ibrollimo i i ' 1.01 Ovisk.-•' r i 111114 1 '1 - "* -- iii a .7 A c V '‘ A i ■et ; E 7 -. fa ti i i 1 Cr - -a - i I J i l k ,.... ...- , a • I ; A , ka . 1 , te, , I ? . rSi, • k ‘ (-- _is % ' 1 ilict: aftmit, iii 1 i , , b 11 ,4 i : ... .... ;I / ell mill rail. "b lin 4 raji 1 . i . a 1 1 ___, _.....0 ... i NI .. rig • 1 lio -4° N. 1/41/4 1 'svt• 'el , „ ii■ , It \ , , 1 : lik k lt\ ,... . C) '‘ ) KA 1 t V"" IIII „0, I • • 1 i vmvi .4.. so if ilit owe rme01111101111iN ic, 1 0 NIL - at -- zur tice m. 4 **************************************************************************** RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE (Reference: 1986 SAN BERNARDINO CO. HYDROLOGY CRITERION) (c) Copyright 1983-2003 Advanced Engineering Software (aes) Ver. 8.0 Release Date: 01/01/2003 License ID 1400 Analysis prepared by: Allard Engineering 8253 Sierria Avenue Fontana Ca. 92335 ************************** DESCRIPTION OF STUDY ************************** * MASTER PLAN OF DRAINAGE * 100 YEAR STORM * area 2 ************************************************************************** FILE NAME: MASTER22.DAT TIME/DATE OF STUDY: 12:36 01/24/2007 USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION: --*TIME-OF-CONCENTRATION MODEL*-- USER SPECIFIED STORM EVENT(YEAR) = 100.00 SPECIFIED MINIMUM PIPE SIZE(INCH) = 18.00 SPECIFIED PERCENT OF GRADIENTS(DECIMAL) TO USE FOR FRICTION SLOPE = 0.90 *USER-DEFINED LOGARITHMIC INTERPOLATION USED FOR RAINFALL* SLOPE OF INTENSITY DURATION CURVE(LOG(I;IN/HR) vs. LOG(Tc;MIN)) = 0.6000 USER SPECIFIED 1-HOUR INTENSITY(INCH/HOUR) = 1.2300 *ANTECEDENT MOISTURE CONDITION (AMC) III ASSUMED FOR RATIONAL METHOD* *USER-DEFINED STREET-SECTIONS FOR COUPLED PIPEFLOW AND STREETFLOW MODEL* HALF- CROWN TO STREET-CROSSFALL: CURB GUTTER-GEOMETRIES: MANNING WIDTH CROSSFALL IN- / OUT-/PARK- HEIGHT WIDTH LIP HIKE FACTOR NO. (FT) (FT) SIDE / SIDE/ WAY (FT) (FT) (FT) (FT) (n) 1 18.0 12.0 0.020/0.020/0.020 0.67 1.50 0.0200 0.125 0.0180 2 22.0 12.0 0.020/0.020/0.020 0.67 1.50 0.0200 0.125 0.0180 GLOBAL STREET FLOW-DEPTH CONSTRAINTS: 1. Relative Flow-Depth = 0.25 FEET as (Maximum Allowable Street Flow Depth) - (Top-of-Curb) 2. (Depth)*(Velocity) Constraint = 10.0 (FT*FT/S) *SIZE PIPE WITH A FLOW CAPACITY GREATER THAN OR EQUAL TO THE UPSTREAM TRIBUTARY PIPE.* *USER-SPECIFIED MINIMUM TOPOGRAPHIC SLOPE ADJUSTMENT NOT SELECTED **************************************************************************** FLOW PROCESS FROM NODE 1160.00 TO NODE 1161.00 IS CODE = 21 >»»RATIONAL METHOD INITIAL SUBAREA ANALYSIS««< »USE TIME -OF- CONCENTRATION NOMOGRAPH FOR INITIAL SUBAREA« INITIAL SUBAREA FLOW - LENGTH(FEET) = 910.00 ELEVATION DATA: UPSTREAM(FEET) = 1005.00 DOWNSTREAM(FEET) = 990.00 Tc = K *[(LENGTH ** 3.00) /(ELEVATION CHANGE)J* *0.20 SUBAREA ANALYSIS USED MINIMUM Tc(MIN.) = 13.494 * 100 YEAR RAINFALL INTENSITY(INCH /HR) = 3.011 SUBAREA Tc AND LOSS RATE DATA(AMC III): DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS Tc LAND USE GROUP (ACRES) (INCH /HR) (DECIMAL) CN (MIN.) RESIDENTIAL "5 -7 DWELLINGS /ACRE" A 1.70 0.80 0.50 52 13.49 RESIDENTIAL "5 -7 DWELLINGS /ACRE" B 13.70 0.45 0.50 76 13.49 SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH /HR) = 0.49 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50 SUBAREA RUNOFF(CFS) = 38.34 TOTAL AREA(ACRES) = 15.40 PEAK FLOW RATE(CFS) = 38.34 ********************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** FLOW PROCESS FROM NODE 1161.00 TO NODE 1163.00 IS CODE = 62 » »>COMPUTE STREET FLOW TRAVEL TIME THRU SUBAREA« « < » »>( STREET TABLE SECTION # 2 USED) « «< UPSTREAM ELEVATION(FEET) = 990.00 DOWNSTREAM ELEVATION(FEET) = 976.00 STREET LENGTH(FEET) = 1710.00 CURB HEIGHT(INCHES) = 8.0 STREET HALFWIDTH(FEET) = 22.00 DISTANCE FROM CROWN TO CROSSFALL GRADEBREAK(FEET) = 12.00 INSIDE STREET CROSSFALL(DECIMAL) = 0.020 OUTSIDE STREET CROSSFALL(DECIMAL) = 0.020 SPECIFIED NUMBER OF HALFSTREETS CARRYING RUNOFF = 2 STREET PARKWAY CROSSFALL(DECIMAL) = 0.020 Manning's FRICTION FACTOR for Streetflow Section(curb -to -curb) = 0.0180 Manning's FRICTION FACTOR for Back -of -Walk Flow Section = 0.0200 * *TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) = 65.60 ** *STREET FLOWING FULL * ** STREETFLOW MODEL RESULTS USING ESTIMATED FLOW: STREET FLOW DEPTH(FEET) = 0.72 HALFSTREET FLOOD WIDTH(FEET) = 24.44 AVERAGE FLOW VELOCITY(FEET /SEC.) = 3.84 PRODUCT OF DEPTH &VELOCITY(FT *FT /SEC.) = 2.75 STREET FLOW TRAVEL TIME(MIN.) = 7.41 Tc(MIN.) = 20.91 * 100 YEAR RAINFALL INTENSITY(INCH /HR) = 2.315 SUBAREA LOSS RATE DATA(AMC III): DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS LAND USE GROUP (ACRES) (INCH /HR) (DECIMAL) CN RESIDENTIAL "5 -7 DWELLINGS /ACRE" A 22.60 0.80 0.50 52 RESIDENTIAL "5 -7 DWELLINGS /ACRE" B 7.90 0.45 0.50 76 SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH /HR) = 0.71 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50 SUBAREA AREA(ACRES) = 30.50 SUBAREA RUNOFF(CFS) = 53.85 EFFECTIVE AREA(ACRES) = 45.90 AREA- AVERAGED Fm(INCH/HR) = 0.32 AREA - AVERAGED Fp(INCH /HR) = 0.63 AREA- AVERAGED Ap = 0.50 TOTAL AREA(ACRES) = 45.90 PEAK FLOW RATE(CFS) = 82.55 END OF SUBAREA STREET FLOW HYDRAULICS: DEPTH(FEET) = 0.77 HALFSTREET FLOOD WIDTH(FEET) = 27.19 FLOW VELOCITY(FEET /SEC.) = 4.15 DEPTH *VELOCITY(FT *FT /SEC.) = 3.20 *NOTE: INITIAL SUBAREA NOMOGRAPH WITH SUBAREA PARAMETERS, AND L = 1710.0 FT WITH ELEVATION -DROP = 14.0 FT, IS 55.6 CFS, WHICH EXCEEDS THE TOP -OF -CURB STREET CAPACITY AT NODE 1163.00 LONGEST FLOWPATH FROM NODE 1160.00 TO NODE 1163.00 = 2620.00 FEET. ********************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** FLOW PROCESS FROM NODE 1163.00 TO NODE 40.00 IS CODE = 61 » »>COMPUTE STREET FLOW TRAVEL TIME THRU SUBAREA« «< » »>(STANDARD CURB SECTION USED) « « < UPSTREAM ELEVATION(FEET) = 976.00 DOWNSTREAM ELEVATION(FEET) = 970.00 STREET LENGTH(FEET) = 1025.00 CURB HEIGHT(INCHES) = 8.0 STREET HALFWIDTH(FEET) = 22.00 DISTANCE FROM CROWN TO CROSSFALL GRADEBREAK(FEET) = 12.00 INSIDE STREET CROSSFALL(DECIMAL) = 0.020 OUTSIDE STREET CROSSFALL(DECIMAL) = 0.020 SPECIFIED NUMBER OF HALFSTREETS CARRYING RUNOFF = 2 STREET PARKWAY CROSSFALL(DECIMAL) = 0.020 Manning's FRICTION FACTOR for Streetflow Section(curb -to -curb) = 0.0150 Manning's FRICTION FACTOR for Back -of -Walk Flow Section = 0.0200 * *TRAVEL TIME COMPUTED USING ESTIMATED FLOW(CFS) = 127.21 ** *STREET FLOWING FULL * ** STREETFLOW MODEL RESULTS USING ESTIMATED FLOW: STREET FLOW DEPTH(FEET) = 0.92 HALFSTREET FLOOD WIDTH(FEET) = 34.90 AVERAGE FLOW VELOCITY(FEET /SEC.) = 4.58 PRODUCT OF DEPTH &VELOCITY(FT *FT /SEC.) = 4.24 STREET FLOW TRAVEL TIME(MIN.) = 3.73 Tc(MIN.) = 24.64 * 100 YEAR RAINFALL INTENSITY(INCH /HR) = 2.098 SUBAREA LOSS RATE DATA(AMC III): DEVELOPMENT TYPE/ SCS SOIL AREA Fp Ap SCS LAND USE GROUP (ACRES) (INCH /HR) (DECIMAL) CN RESIDENTIAL "5 -7 DWELLINGS /ACRE" B 37.70 0.45 0.50 76 RESIDENTIAL "5 -7 DWELLINGS /ACRE" A 16.80 0.80 0.50 52 SUBAREA AVERAGE PERVIOUS LOSS RATE, Fp(INCH /HR) = 0.56 SUBAREA AVERAGE PERVIOUS AREA FRACTION, Ap = 0.50 SUBAREA AREA(ACRES) = 54.50 SUBAREA RUNOFF(CFS) = 89.23 EFFECTIVE AREA(ACRES) = 100.40 AREA- AVERAGED Fm(INCH /HR) = 0.30 AREA- AVERAGED Fp(INCH /HR) = 0.59 AREA- AVERAGED Ap = 0.50 TOTAL AREA(ACRES) = 100.40 PEAK FLOW RATE(CFS) = 162.81 END OF SUBAREA STREET FLOW HYDRAULICS: DEPTH(FEET) = 1.00 HALFSTREET FLOOD WIDTH(FEET) = 38.87 FLOW VELOCITY(FEET /SEC.) = 4.84 DEPTH *VELOCITY(FT *FT /SEC.) = 4.86 *NOTE: INITIAL SUBAREA NOMOGRAPH WITH SUBAREA PARAMETERS, AND L = 1025.0 FT WITH ELEVATION -DROP = 6.0 FT, IS 113.1 CFS, WHICH EXCEEDS THE TOP -OF -CURB STREET CAPACITY AT NODE 40.00 LONGEST FLOWPATH FROM NODE 1160.00 TO NODE 40.00 = 3645.00 FEET. END OF STUDY SUMMARY: TOTAL AREA(ACRES) = 100.40 TC(MIN.) = 24.64 EFFECTIVE AREA(ACRES) = 100.40 AREA- AVERAGED Fm(INCH/HR)= 0.30 AREA - AVERAGED Fp(INCH /HR) = 0.59 AREA- AVERAGED Ap = 0.50 PEAK FLOW RATE(CFS) = 162.81 END OF RATIONAL METHOD ANALYSIS MASTER PLAN OF DRAINAGE AREA 2 YB CALCULATION * ** NON - HOMOGENEOUS WATERSHED AREA- AVERAGED LOSS RATE (Fm) AND LOW LOSS FRACTION ESTIMATIONS FOR AMC II: TOTAL 24 -HOUR DURATION RAINFALL DEPTH = 8.00 (inches) SOIL -COVER AREA PERCENT OF SCS CURVE LOSS RATE TYPE (Acres) PERVIOUS AREA NUMBER Fp(in./hr.) YIELD 1 41.10 50.00 32. 0.975 0.520 2 59.30 50.00 56. 0.748 0.666 TOTAL AREA (Acres) = 100.40 AREA- AVERAGED LOSS RATE, Fm (in./hr.) = 0.420 AREA- AVERAGED LOW LOSS FRACTION, Y = 0.394 MASTER PLAN OF DRAINAGE AREA 2 YB CALCULATION * ** NON - HOMOGENEOUS WATERSHED AREA- AVERAGED LOSS RATE (Fm) AND LOW LOSS FRACTION ESTIMATIONS FOR AMC III: TOTAL 24 -HOUR DURATION RAINFALL DEPTH = 8.00 (inches) SOIL -COVER AREA PERCENT OF SCS CURVE LOSS RATE TYPE (Acres) PERVIOUS AREA NUMBER Fp(in./hr.) YIELD 1 41.10 50.00 52.(32.) 0.796 0.639 2 59.30 50.00 76.( 56.) 0.452 0.807 TOTAL AREA (Acres) = 100.40 AREA- AVERAGED LOSS RATE, Fm (in./hr.) = 0.296 AREA-AVERAGED LOSS FRACTION, Y = 0.262