Loading...
HomeMy WebLinkAbout4849-2GENERAL NOTES: 1. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ("GREEN BOOK "4. ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL BE THE LATES EDITION UNLESS OTHERWISE NOTED. 2. WHEN A TECHNICAL CONFLICT IF FOUND TO EXIST IN THE CONTRACT DOCUMENT THAT CAN NOT BE RESOLVED BY REFERENCE TO PRECEDENCE PROVISIONS IN THE "GREEN BOOK", THE CONTRACTOR SHALL IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENGINEER FOR RESOLUTION. -- 3. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER. 4. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL (909) 350-7610 5. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES DESCRIBED IN THE STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS. LATEST NON -METRIC EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER. 6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES. 7. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR TRENCHES 5 FEET OR GREATER IN DEPTH FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY. 8. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPT SHALL BE GUARDED BY SHORING, SLOPING OF THE GROUND OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS OF THE DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA. TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND MOVEMENT. 9. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT OBTAINING A SEPARATE PERMIT FOR THAT PURPOSE. 10. THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION; HOWEVER, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTION TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT 1-800-227-2600 TWO WORKING DAYS BEFORE EXCAVATION. 11. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT LIMITED TO, GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACILITIES. 12. THE CONTRACTOR SHALL NOT OPERATE AND FIRE HYDRANT WATER MAIN VALVES WITHOUT APPROPRIATE AGENCY AUTHORIZATION. CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR VALVE OPERATION AND WATER REQUIREMENTS. 13. CURVE DATA REFERS TO THE FACE OF CURB. 14. STATIONING REFERS TO THE CENTERLINE OF STREETS EXCEPT WHERE OTHERWISE NOTED. 15. ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION. 16. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCH MARKS WITHOUT PRIOR NOTIFICATION TO THE CITY ENGINEER. 17. REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING SURVEY MONUMENT S. MONUMENT TIES AND BENCH MARKS, SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR. SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS CONSTRUCTION SHALL BE REPLACED. MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT. 18. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES. A MINIMUM 12 FOOT LANE SHALL BE MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDENTS AND EMERGENCY VEHICLES. 19. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING ADEQUATE WATERING, AT ALL TIMES. 20. ALL GRADING OPERATIONS SHALL BE DISCONTINUED WHEN SUSTAINED WIND VELOCITIES EXCEED 25 -MILES PER HOUR. 21. THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO BE DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL. 22. NO TRENCH BACKFILL SHALL BE TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR 23. A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE REQUIRED DENSITY SHALL REQUIRE RE -WORKING OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED DENSITY IS OBTAINED 24. CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY NON- ERODEABLE SWALES ENTERING OR LEAVING IMPROVEMENTS. 25. THE FINAL LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS SHALL BE APPROVED AT THE TIME OF CONSTRUCTION AND SHALL CONFORM TO THE CITY OF FONTANA STANDARD DETAILS. 26. ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR, AND FINISH TO MATCH EXISTING CONCRETE. 27. THE SEWER CONTRACTOR SHALL STAMP AN "S" IN THE FACE OF THE CURB AT THE LOCATION OF THE SEWER LATERAL. BENCH MARK NO. 119 LOCATION: BRASS CAP NORTH END OF NORTHWEST CORNER OF SIERRA AVENUE AND ARROW BOULEVARD. ELEV. 1275.25' Underground Service Alert SECTION 4216/4217 OF THE GOVERNMENT o r� CODE REQUIRES A DIG ALERT IDENTIFICATION NUMBER BE ISSUED BEFORE A PERMIT TO EXCAVATE WILL BE VALID FOR YOUR DIG ALERT I.D. NUMBER CALL UNDERGROUND SERVICE ALERT TOLL FREE 1-800-227-2600 TWO WORKING DAYS BEFORE YOU DIG TKE JOB #: 101-49 GENERAL NOTES (CONT.): 28. NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED, INSPECTED AND APPROVED. 29. ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF STREETS. 30. APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT. 31. PAVEMENT STRUCTURAL SECTIONS SHOWN ARE MINIMUM AND SUBJECT TO REVISION AND APPROVAL OF THE CITY ENGINEER AS DETERMINED BY SOILS TESTS TAKEN AFTER COMPLETION OF ROUGH GRADING. 32. ACTUAL THICKNESS OF A.C. PAVEMENT AND/OR BASE COURSE MATERIAL FOR STRUCTURAL STREET SECTIONS SHALL BER COMMENDED BY A GEOTECHNICAL REPORT AND SUBMITTED TO THE CITY OF FONTANA FOR APPROVAL UPON COMPLETION OF ROUGH GRADING. 33. ALL PAVING MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO FINISHED GRADE BY THE PAVING CONTRACTOR UPON COMPLETION OF PAVING. 34. UPON COMPLETION OF CONSTRUCTION, CONTRACTORS SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER. 35. CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS AND SIDEWALKS AFFECTED BY THE CONSTRUCTION TO THE SATISFACTION OF THE CITY ENGINEER. 36. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER. GENERAL NOTES: 1. ALL WORK PERFORMED IN THIS CONTRACT SHALL CONFORM TO: A. PROJECT SPECIFICATIONS. B. WORK WITHIN PUBLIC RIGHT OF WAY SHALL CONFORM TO THE LATEST EDITION AND SUPPLEMENTS OF THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (SSPWC) AND AMERICAN PUBLIC WORKS ASSOCIATION (APWA). C. CITY OF FONTANA STANDARDS. 2. ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF THE WORK SPECIFIED ON THE DRAWINGS AND WITHIN THE VARIOUS NOTES SHOWN, HEREIN. 3. THE EXISTING CONDITIONS SHOWN DIAGRAMMATICALLY ON THE PLANS ORIGINATED FROM AS BUILT DRAWINGS AND FIELD SURVEY. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VISIT THE JOB SITE AND VERIFY THE EXACT EXISTING CONDITIONS BEFORE SUBMITTING HIS BID. ANY DISCREPANCY SHALL BE REPORTED IMMEDIATELY TO THE CITY FOR PROPER ACTION. 4. THE CONTRACTOR SHALL PROTECT ALL EXISTING STRUCTURES IN THE AREA OF WORK WHICH ARE NOT INCLUDED IN THIS CONSTRUCTION, ANY DAMAGE RESULTING FROM THIS WORK SHALL BE REPAIRED AND/OR REPLACED AT NO ADDITIONAL COST TO THE CITY. 5. UNDERGROUND SERVICE ALERT: BEFORE COMMENCING ANY EXCAVATION, THE CONTRACTOR SHALL OBTAIN AN UNDERGROUND SERVICE ALERT INQUIRY I.D. NUMBER BY CALLING 1-800-422-4133. TWO WORKING DAYS SHALL BE ALLOWED AFTER THE I.D. NUMBER IS OBTAINED AND BEFORE THE EXCAVATION WORK IS STARTED THAT UTILITY OWNERS CAN BE NOTIFIED. 6. PROTECTION AND RESTORATION OF EXISTING IMPROVEMENTS: THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF PUBLIC AND PRIVATE PROPERTY ADJACENT TO THE WORK PER SECTION 7-9 OF THE STANDARD SPECIFICATIONS. 7. REMOVALS: EXISTING FACILITIES WHICH ARE INDICATED ON THESE PLANS TO BE REMOVED OR EXISTING FACILITIES WHICH ARE DISCOVERED DURING CONSTRUCTION (INCLUDING WALLS, FOOTINGS AND FOUNDATIONS) SHALL BE TOTALLY REMOVED, UNLESS DIRECTED OTHERWISE. 8. ALL SITE PREPARATION AS INDICATED SHALL BE MADE UNDER THE CONTINUOUS INSPECTION OF THE CITY. SECURE THE REQUIRED PERMIT FROM THE CALIFORNIA DIVISION OF INDUSTRIAL SAFETY FOR THE CONSTRUCTION OF TRENCHES, SHORING OR EXCAVATIONS WHICH ARE 5 FEET OR DEEPER OR WORK THAT MAY JEOPARDIZE THE WORKERS. SHORING CALCULATIONS SHALL BE PROVIDED AS REQUIRED FOR APPROVAL AND PERMITTING. 9. THE CONTRACTOR SHALL KEEP THE CONSTRUCTION AREA SUFFICIENTLY DAMPENED TO CONTROL DUST CAUSED BY WORK ACTIVITIES AS REQUIRED BY THE CITY. THE CONTRACTOR SHALL PROVIDE 6' HIGH TEMPORARY FENCING WITH VISUAL BARRIER AROUND THE PROJECT LIMITS. 10. ALL WORK IN THE PUBLIC RIGHT OF WAY REQUIRES APPROVAL BY THE CITY OF FONTANA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS BEFORE CONSTRUCTION BEGINS. CONTRACTOR SHALL SECURE AND PAY FOR ANY PERMIT REQUIRED PRIOR TO CONSTRUCTION. 11. ALL FILL OR BACKFILL SHALL BE COMPACTED BY MECHANICAL MEANS TO A MINIMUM 95% RELATIVE COMPACTION AS PER ASTM D-1557. 12. THE GEOTECHNICAL ENGINEER IS TO APPROVE THE KEY OR BOTTOM OF EXCAVATION LEAVE A CERTIFICATE ON THE SITE FOR THE CITY' INSPECTOR. -THE CITY INSPECTOR IS TO BE NOTIFIED BEFORE ANY GRADING BEGINS AND FOR BOTTOM INSPECTION BEFORE FILL IS PLACED. FILL MAY NOT BE PLACED WITHOUT . APPROVAL OF THE CITY. 13. VOIDS RESULTING FROM REMOVAL OF STRUCTURE SHALL BE FILLED WITH SUITABLE MATERIALS APPROVED BY THE CITY AND COMPACTED TO 95% MAXIMUM DENSITY PER ASTM D-1557. 14. UPON COMPLETION OF PROJECT, CONTRACTOR SHALL REMOVE EXISTING ' CONSTRUCTION FENCING, APPURTENANCES AND OFFICE TRAILERS FROM THE SITE. PAVEMENT SHALL BE PATCHED AND REPAIRED TO MATCH ADJACENT PAVEMENTS AND APPROVED BY THE CITY INSPECTOR AS APPLICABLE. TKE ENGINEERING, INC. 2305 CHICAGO AVENUE IO M• RFti "� RIVERSIDE CA 92507 (951) 680-0440 � No.69984 Exp.9_30-12 ERING FAX (951) 680-0490 C/Vi cTMRYRENN R.C.E. No. 69984 EXPIRES: 9-30-12 STORM DRAIN IMPROVEMENT GENERAL NOTES: 1. ADVANCE CONSTRUCTION SIGNING INDICATING DURATION OF PROJECT SHALL BE IN PLACE ONE WEEK PRIOR TO IMPLEMENTING DETOURS. 2. CONTRACTOR SHALL CONSTRUCT ALL PAVEMENT REPAIR, REPLACEMENT, BACKFILL, AND TRENCHING PER CITY OF FONTANA STANDARD PLAN NO. 1008. CONTRACTOR SHALL REMOVE ALL UNDERLYING PCC PAVEMENT AND CONSTRUCT AC PAVEMENT REPLACEMENT AS REQUIRED. ASPHALT PAVEMENT THICKNESS SHALL BE 6" OVER MINIMUM 12" 95% COMPACTED NA11VE SUBGRADE. 3. NO OPEN TRENCH SHALL BE ALLOWED AT THE END OF THE DAY WITHOUT PRIOR APPROVAL OF THE CITY ENGINEER. 4. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL EXPOSE EXISTING FACILITIES AND VERIFY ELEVATION AND LOCATION OF CONNECTIONS. CITY APPROVAL OF CONNECTION TO THE EXISTING FACILITIES AND VERIFY ELEVATION AND LOCATION. 5. IF EXISTING UTILITIES OR ANY OTHER FACILITIES CONFLICT WITH THE PROPOSED IMPROVEMENTS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND ALL AFFECTED AGENCIES IMMEDIATELY. 6. MINIMUM D -LOAD FOR ALL RCP IS 1350. 7. THE MINIMUM CONCRETE COVER BETWEEN REINFORCEMENT SURFACE AND PIPE INSIDE SURFACE FOR TRANSVERSE STEEL SHALL. BE 1-1 4". ASSUME 1-1/2" TO CENTER OF BAR WHEN CALCULATING EFFECTIVE DEPTH. WHERE VELOCITI S ARE BETWEEN 20 TO 30 FT/SEC THE CONCRETE COVER ON THE INSIDE FACE OF THE OF THE PIPE SHALL BE INCREASED 1/2". WHERE VELOCITIES EXCEED 30 FT/SEC, THE CLEARANCE ON THE INSIDE FACE SHALL BE INCREASED 1 ". DESIGN STRENGTH IN THESE REACHES SHALL BE Fc=4,000 PSI FOR VELOCITIES EXCEEDING 20 FT/SEC. NOTES: 1. ALL WORK PERFORMED INVOLVING THE INSTALLATION OF THE PERVIOUS CONCRETE SHALL BE PERFORMED BY A CONTRACTOR HOLDING A VALID "NRMCA PERVIOUS CONCRETE CONTRACTOR CERTIFICATION". 2. SUBBASE SHALL BE WRAPPED IN GEOTEXTILE MATERIAL. PERVIOUS GUTTER DETAIL: SCALE: 1" = 5' GRADING IMPROVEMENT PLANS CAMPUS PARKING LOT PROJECT FENCE/WALL SCHEDULE FOR: CAMPUS PARKING LOT PROJECT WALL/ FENCE LEGEND OF SYMBOLS AND ABBREVIATIONS: FINISH SIZE EXISTING FIRE HYDRANT `. EXISTING PCC CONCRETE TYPE ® EXISTING WATER VALVE PCC REMOVAL HEIGHT 2 P P EXISTING POWER POLE ® ASPHALT CONCRETE REMOVAL SPLIT MB a EXISTING MAILBOX EXISTING DECORATIVE ASPHALT CONCRETE PAVEMENT WM 0 EXISTING WATER METER EXISTING PCC DECORATIVE CONCRETE EXISTING EDGE OF PAVEMENT �. PROPOSED PCC CONCRETE SPLIT FACE 0 EXISTING TREE ® PROPOSED LANDSCAPE AREA PER ONSITE 3 WROUGHT IRON 8 FT. LANDSCAPE PLANS SHEETS 24 TO 36 O EXISTING SHRUB Q PROPOSED ASPHALT CONCRETE COLUMNS o--- H EXISTING STREET LIGHT 24"x8"x24" PROPOSED DECORATIVE ASPHALT CONCRETE PAVEMENT OM ® EXISTING MANHOLE v v PROPOSED PCC DECORATIVE CONCRETE EXISTING SURVEY CONTROL R/W EXISTING RIGHT-OF-WAY AB ABANDON FS FINISH SURFACE - PROPOSED SEWER AC ASPHALT CONCRETE GB GRADE BREAK 0 PROPOSED MANHOLE AP ANGLE POINT INV INVERT --� PROPOSED LATERAL BC BEGINNING OF CURVE LF LINEAR FEET OU UTILITY INTERFERENCE FLAG (APPROX. BCR BEGIN CURB RETURN MH MANHOLE LOCATION OF INTERFERENCE WITH TYPE CL CENTERLINE FL FLOW LINE OF UTILITY INDICATED BY: W -WATER; CF CURB FACE S SLOPE T -TELEPHONE; SD -STORM DRAIN; E -ELECTRIC; TV -CABLE TELEVISION; EC END OF CURVE STA STATION IR -IRRIGATION; U -UNKNOWN UTILITY; ECR END CURB RETURN TC TOP OF CURB S -SEWER; G -GAS). EL ELEVATION WM WATER METER FH FIRE HYDRANT PCC PORTLAND CEMENT CONCRETE PRC POINT OF REVERSE CURVE NOTES: 1. ALL WORK PERFORMED INVOLVING THE INSTALLATION OF THE PERVIOUS CONCRETE SHALL BE PERFORMED BY A CONTRACTOR HOLDING A VALID "NRMCA PERVIOUS CONCRETE CONTRACTOR CERTIFICATION". 2. SUBBASE SHALL BE WRAPPED IN GEOTEXTILE MATERIAL. PERVIOUS GUTTER DETAIL: SCALE: 1" = 5' GRADING IMPROVEMENT PLANS CAMPUS PARKING LOT PROJECT FENCE/WALL SCHEDULE FOR: CAMPUS PARKING LOT PROJECT WALL/ FENCE WALL FINISH SIZE COLOR RETAINING TOTAL TYPE HEIGHT HEIGHT 2 L.F. 98 L.F. 1 BLOCK 2 FT. SPLIT 6"x8"x16" TAN RETAINING WALL MAX. FACE MAX. 2 BLOCK WALL 8 FT. SPLIT FACE 8"x8"x16" TAN 0 FT. -0 IN. 118 L.F. 3 WROUGHT IRON 8 FT. BLACK 0 FT. -0 IN. 1003 L.F. 4 COLUMNS 8 FT. -6 IN. SPLIT FACE 24"x8"x24" TAN 0 FT. -0 IN. 55 EA. NOTES: 1. WALL HEIGHTS ARE MEASURED FROM THE HIGHEST ADJACENT GRADE. 2. FOR RETAINING PURPOSES, WALL HEIGHTS ARE MEASURED FROM THE LOWEST ADJACENT GRADE. SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND STANDARDS IN EFFECT. CITY OF FONTANA, CALIFORNIA GRADING IMPROVEMENT PLANS DRAWN BY: CAMPUS PARKING LOT IMPROVEMENTS buy: TMR AS SIROWN DOM BY: GENERAL NOTES DAA; TMR OCT. 2010 CHECM BY: DAM DRAWNG NO:: Y27 aT� o u,. �, , �� 4849 R ft