Loading...
HomeMy WebLinkAbout4712-6PLANTING NOTES 1. GENERAL - ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CITY CODES; AND THESE PLANS. THE CONTRACTOR SHALL APPLY FOR ALL PERMITS AND PAY FOR SAME. A. THE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS SHOWN ON THE PLANS AT THE SITE PRIOR TO COMMENCMENT OF ANY WORK UNDER THIS CONTRACT. B. THE CONTRACTOR SHALL CARRY ALL WORKER'S COMPENSATION, PUBLIC LIABILITY AND PROPERTY DAMAGE INSURANCE, AS REQUIRED BY THE OWNER. C. THE CONTRACTOR SHALL APPLY FOR ALL PERMITS AND PAY FOR SAME. ALL IRRIGATION WORK SHALL HAVE RECOMMENDED APPROVAL BY THE LANDSCAPE ARCHITECT PRIOR TO BEGINNING ANY GROUNDCOVER PLANTING WORK. U. THE OWNER'S SUPERINTENDENT AND THE LANDSCAPE ARCHITECT WILL REVIEW THE PLANTING WORK. PRIOR TO STARTING WORK, THE CONTRACTOR SHALL CONTACT THE LANDSCAPE ARCHITECT AND COORDINATE ALL REVIEWS. E. THE QUALITY OF WORKMANSHIP AND MATERIALS SHALL BE OF THE HIGHEST STANDARDS. COOPERATION AND FLEXIBILITY IS EXPECTED OF THE CONTRACTOR TOWARD WORKING WITH THE OWNER/LANDSCAPE ARCHITECT IN PRODUCING THE BEST POSSIBLE PRODUCT. F. UPON COMPLETION OF EACH PHASE OF THE WORK, THE CONTRACTOR SHALL THOROUGHLY CLEAN THE SITE OF ALL ACCUMULATED RUBBISH, DEBRIS, AND OTHER EXTRANEOUS MATERIAL. 2. SCOPE OF WORK - FURNISH ALL MATERIAL, LABOR, TRANSPORTATION, EQUIPMENT AND PROPERTY TO COMPLETE THE LANDSCAPING OF THE PLANTING AREAS SHOWN ON THE DRAWINGS, OR REASONABLY IMPLIE TO COMPLETE THE CONSTRUCTION. INCLUDED AS A PART OF THE WORK, BUT NOT NECESSARILY LIMITED BY ARE THE FOLLOWING ITEMS: FINE GRADING OF ALL PLANTING AREAS, PREPARATION OF ALL PLANTING AND TREE HOLES, FURNISHING AND INSTALLATION OF ALL REQUIRED PLANTING BACKFILL MATERIALS, TREE STAKI AND MISCELLANEOUS MATERIALS, FURNISHING AND INSTALLATION OF ALL PLANT MATERIALS, PROVIDING MAINTENANCE THROUGHOUT THE SPECIFIED PERIOD, CLEAN-UP AND WEEDING OF ALL LANDSCAPE AREAS, GUARANTEE OF ALL PLANT MATERIAL AND WORKMANSHIP FOR A PERIOD OF ONE YEAR 3. THE CONTRACTOR SHALL REMOVE ALL WEEDS, ROCKS OVER 2" DIAMETER, DEBRIS AND OTHER EXTRANEOUS MATERIAL FROM THE JOB SITE IN A LEGAL MANNER PRIOR TO PROCEEDING WITH ANY WORK UNDER THIS CONTRACT. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FINISH GRADE, INCLUDING ANY IMPORT SOIL ADJUSTMENTS TO EARTH BERMS. PROVIDE FINISH GRADE IN PLANTING AREAS 1% MINIMUM FLOW. FINISH GRADES SHALL BE 2" BELOW ADJACENT WALKS, CURBS, DRIVEWAYS, ETC. IN GROUND COVER AREAS. 5_ ALL TREES AND SHRUBS SHALL BE PLANTED PER THESE NOTES AND AS DETAILED. ALL PLANT MATERIAL SHALL BE OF THE HIGHEST QUALITY AND LARGEST REASONABLE SIZE AVAILABLE FOR THE SPECIFIED CONTAINER SIZE (WITHOUT BEING ROOT BOUND). SHRUB MATERIALS SHALL BE VIGOROUSLY GROWING, HEALTHY PLANT MATERIAL, FULL AND BUSHY, OF HINES WHOLESALE NURSERY/MONROVIA NURSERY COMPANY QUALITY, OR EQUAL. THE LANDSCAPE ARCHITECT WILL REVIEW ALL PLANT MATERIAL WHEN SPOTTED FOR PLANTING, AND WILL NOT HESITATE TO REJECT ANY MATERIAL OF QUESTIONABLE QUALITY, OR OF LESS THAN THE LARGEST REASONABLE SIZE MATERIAL AVAILABLE. 6. NO PLANT SUBSTITUTIONS ARE TO BE MADE WITHOUT THE WRITTEN CONSENT OF THE LANDSCAPE ARCHITECT. 7. ALL GROUNDCOVER AS NOTED IN THE LEGEND SHALL BE ROOTED TIP CUTTINGS FROM FLATS AND SHALL BE PLANTED IN STAGGERED ROWS CONTINUOUSLY UNDER ALL TREES AND SHRUBS IN THE AREAS AS DESIGNATED ON THE PLANS AND AT THE SPACING INDICATED IN THE LEGEND. GROUNDCOVER SHALL BE INSTALLED NO CLOSER THAN 1/2 THE ON CENTER SPACING AS INDICATED ON PLANS. 8. TO ALL NEW PLANTING AREAS (SHRUB AND GROUNDCOVER) ROTOTILL THE FOLLOWING AMENDMENTS 411-6" DEEP AND IRRIGATE THOROUGHLY: 200 LBS. OF GRO-POWER/1000 S.F. 3 CU. YDS. NITROGEN STABILIZED ORGANIC AMENDMENT/1000 S.F. 9. AFTER EARTHWORK, INSTALLATION OF IRRIGATION SYSTEM, AND SOIL PREPARATION, BUT PRIOR TO PLANTING, PERFORM WEED ABATEMENT PROGRAM TO ALL PLANTING AREAS AS FOLLOWS: TO ALL PLANTING AREAS ALLOW A WEEK MIN. FOR WEED ABATEMENT PROCESS A. APPLY SULFATE OF AMMONIA AT THE RATE OF 5 LBS. PER 1,000 SQ. FT. TO ALL AREAS TO BE PLANTED. B. KEEP AREA MOIST BY REGULAR IRRIGATIONS FOR A PERIOD OF TWO (2) WEEKS TO GERMINATE EXISTING WEED SEEDS. C. AT THE END OF TWO WEEKS, APPLY "ROUND -UP" OR EQUAL SYSTEMIC HERBICIDE. DO NOT IRRIGATE WITH -IN SIX (6) HOURS AFTER APPLICATION. HERBICIDE SHALL BE APPLIED BY AN INDIVIDUAL WITH THE PROPER LICENSE. REFER TO MFG. SPECIFICATIONS FOR PERIOD OF TIME REQUIRED FROM TIME OF APPLICATION TO TIME IMPLEMENTING PLANTING. AFTER COMPLETE WEED KILL, REMOVE ALL WEED RESIDUE AND TOP GROWTH AND DISPOSE OF IN A LEGAL MANNER. NOTE: ALTERNATE METHODS OF WEED KILL FOR ITEM 'C' MAY BE VAPAM OR METHYL BROMIDE APPLIED PER LICENSED HERBICIDE AGENCY AND SPECIFICATIONS. D. REPEAT STEPS A,B & C. 10. ALL PLANTING AND BARE SOIL AREAS (EXCEPT AREAS TO RECEIVE HYDROSEED) ARE TO BE TREATED WITH A PRE -EMERGENT CHEMICAL (SUBJECT TO APPROVAL BY LANDSCAPE ARCHITECT PRIOR TO APPLICATION). CHEMICALS ARE TO BE APPLIED BY A LICENSED PEST CONTROL AGENT AT THE RATES RECOMMENDED BY THE MANUFACTURER. THIS TREATMENT SHALL BE APPLIED AT THE FOLLOWING TIMES DURING THE CONTRACT: A) AT THE BEGINNING OF PLANT ESTABLISHMENT PERIOD AND B) AT THE END OF THE PLANT ESTABLISHMENT PERIOD.(IF IT EXCEEDS 90DAYS) NO CHEMICALS SHALL BE APPLIED OTHER THAN IN THE PRESENCE OF THE INSPECTOR_ 11. BACKFILL MIX FOR TREES AND SHRUBS SHALL BE AS FOLLOWS: - 6 PARTS BY VOLUME NATIVE ON-SITE SOIL - 4 PARTS BY VOLUME NITROLIZED FIR SHAVINGS - 18 LBS OF GRO-POWER PER CU./YD. OF MIX - 2 LBS. OF IRON SULFATES PER CU_/YD OF MIX - GRO-POWER PLANTING TABLETS FOR EXTENDED FEEDING/SOIL CONDITIONING. SEE TREE AND SHRUB PLANTING DETAILS FOR PLACEMENT AND QUANTITIES. THE ABOVE SHOULD BE THOROUGHLY BLENDED PRIOR TO USE FOR BACKFILL PURPOSES. THE IRON SULFATE SHOULD NOT CONTACT CEMENT SURFACES SINCE SEVERE STAINING COULD OCCUR. 12. MAINTENANCE PERIOD - THE MAINTENANCE PERIOD SHALL COMMENCE UPON THE OWNER'S AND THE LANDSCAPE ARCHITECT'S WRITTEN RECOMMENDED APPROVAL OF ALL PHASES OF PLANTING INSTALLATION AND SHALL BE FOR NINETY (90) CONTINUOUS CALENDAR DAYS. 13. MAINTENANCE PROCEDURES - THE GENERAL CARE AND MAINTENANCE OF ALL AREAS SHALL CONSIST OF PROPER WATERING, FERTILIZATION, WEEDING, CLEAN-UP, AND AS FOLLOWS: A. CULTIVATE AND WEED AT LESS THAN TEN (10) WORKING DAY INTERVALS. B. APPROXIMATELY 30 DAYS AFTER INITIAL PLANTING, APPLY 25 LBS. OF GRO-POWER PER 1,000 SQ. FT. AND IRRIGATE THOROUGHLY. THE SECOND APPLICATION USING THE ABOVE PRODUCT AT THE SAME RATE SHALL BE APPLIED IN ANOTHER 60 DAYS OR JUST BEFORE THE MAINTENANCE PERIOD ENDS. C. CONTRACTOR SHALL MAINTAIN THE IRRIGATION SYSTEMS IN A LIKE NEW, OPERATING CONDITION, ADJUSTING HEAD HEIGHTS, THROW AND SPRAY ARCS AS NECESSARY. THE CONTRACTOR IS RESPONSIBLE FOR PROPER WATERING OF ALL PLANTING AREAS, AND SHALL REPLACE ANY MATERIAL DAMAGED DUE TO IMPROPER MOISTURE. D. ANY CONCENTRATED DEVELOPMENT OF WEED GROWTH THAT MAY APPEAR IN PLANTING AREAS DURING MAINTENANCE PERIOD SHALL BE REMOVED AT TEN (10) DAY INTERVALS. THE CONTRACTOR MAY ELECT TO REMOVE SUCH CONCENTRATIONS OF WEEDS MANUALLY OR BY AN APPROVED HERBICIDE PROGRAM. E. DURING THE COURSE OF THE MAINTENANCE WORK, THE CONTRACTORSHALL REMOVE SURPLUS MATERIALS AND DEBRIS FROM THE SITE AND SHALL KEEP THE PREMISES IN A NEAT AND CLEAN CONDITION AT ALL TIMES. F. DURING THE MAINTENANCE PERIOD, THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ADEQUATE PROTECTION FOR ALL PLANTING AREAS. ANY DAMAGED AREAS SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE. 14. ITEMS 8, 11 & 13B ARE FOR BID PURPOSES ONLY. CONTRACTOR SHALL SUBMIT SOIL SAMPLE TO SOIL & PLANT LAB, P.O. BOX 6566 ORANGE, CA 92613 (714-282-8777). CONTRACTOR SHALL SUBMIT TEST RESULTS AND LAB RECOMMENDATIONS TO L.A. FOR REVIEW. CONTRACTOR SHALL AMEND SOIL, PREPARE BACKFILL & FERTILIZER PER TEST RESULTS, OWNER SHALL PAY FOR WHOLESALE COST OF MATERIALS ONLY SHOULD TEST RESULTS REQUIRE ADDITIONAL MATERIALS BEYOND BID SPECIFICATION. P7 IN1d�po1NN1 Serrloo Alert Irak 10LL FREE 1-800 227-2600 � rou ow I� OWNER /DEVELOPER: NEW WEST HOME 450 NEWPORT CENTER DRIVE, SUITE 480 NEWPORT BEACH, CA 92660 (949) 640-6420 * FAX: (949) 640-6484 ESSI N0 75126 W. 12/311/01 Oft SHINGLE NAIL LODGE POLE TREE TRUNK CINCH TIE (DO NOT TWIST) PREVAILING WIND DIRECTION -2" DIA LODGEPOLE PINE TREE STAKE COPPER NAPTHENATE TREATED AND DRIVEN IN GROUND TO 2FT. MIN. DEPTH. 2 RE09D -'CINCH TIE' (4) REQ -0 -ARBOR GUARD IN TURF AREAS PREPARED BACKFILL MIX, SEE SPECIFICATIONS 3' HIGH WATER BASIN, AT TIME OF PLANTING FINISH GRADE -AGRIFORM TABLETS TO BE ADDED PER MFG, RECOM DS. 2X DIA. OF ROOT BALL APPROVED BY: CITY OF FONTANA Q P I9AwdW CITY ENGINEER DATE: R0I3M W. WEDOLuE TREE STAKING DRAWN. BY: TIMOTHY RASTEDT DATE OF LAST REVISION: STD. PLAN NO. 531 SHT. 1 OF1 6" 4" RADIUS EDGES 1/2" FINISH GRADE (TURF SIDE) #3 RE6AR, CONTINUOUS NATIVE SOIL 30% COMPACTED 4tpEI s$ APPROVED BY: It ,'tel CITY OF FONTANA f =% Na. 2512 CITY ENGINEER DATE: CONCRETE MOND CURB ROeERr W. WINDDLE DRAWN $Y: TIMOTHY RASTEDT . Crft orf Of f1►11Ed�� DATE OF LAST REVISION: SM. PLAN 1110.544 SHT. 1 QF 1 BENCHMARK: B.M. N0. 361 ELEV.= 1365.00 NAIL IN POLE #1536697E S.W. CORNER SULTANA & BASELINE MARK I BY I DATE ENGINEER PERMANENT BASIN 1 1/2"X MIN. ROC 2X THE WIDTH OF PUDDLE AND SETTLE W#1%Lr%f .� PRIOR TO PLACEMENT OF SHRUB QWEss[� fi APPROVED 8Y: crrY of FONTANA 1241,00 1& 23126 � CITY ENGINEER DATE: 5{-jlzUf� PLANTINGROBERT W. VffF�DLE *. 12/J1/otl �. DRAWN BY: TIMOTHY RASTEDT. avn. O 11 DATE OF LAST REVISION: STD. PLAN NO. 5,35- SHT. 14F1 PERMANENT BASIN EXISnNG SLOPE i I r 1 1/20X MIN. ROOTBALL DEPTH 2X THE WIDTH OF ROOTBA,LL PUDDLE AND SETTLE BACKAL -- PR1OR TO PLACEMENT OF SHRUB TAPER 1:1 MAX. CUT SLOPE O PLANT P#T FF-41TABLETS (SEE SPECS.) RM18ALL BACKFILL NII (SEE SPECS. TEtSt APPROVED BY: CITY OF FONTANA Ift 2513 CFF Y ENGINEER DATE: 5H RU B ON SLOPE ROBERY W. WEDDLE EV 112/31/011 DRAWN BY: TTMOTW RASTEDT . CML jE OF call � DATE OF LAST REVISION: STD. PLAN NO. 536 1 SHT. 1 OF 1 APPR. DATE COUNTY �pSCgpF MUS/k Wdlur* 7/."/09e R e al f J'>•-Darb�Q- OF CA 41 3612 MISSION /NN AVE RIVERSIDE, CALIF. 92501 L/C. #1512 LAwaSoo:s (909) 781-1930 •sOMETECIE em FAX(909) 686-8091 � J PREPARED BY: RHA PROJECT # 07153 J1:1 joiners ready to pull out of the carton and install in one continuous line of up DeepRoot LB 12-2, LB 18-2 or UB 24-2 to: LB 12-2 80: (24 m) per Carton LB 18-2 52 (16 m) per Carton Line can be separated at any two foot interval. Sidewalk Sidewalk Ground Locks TO BE 24" DEEP ON ALL SIDES DEEPROOT BARRIER PLANT SPACING AS PER PLAN PLANT SPACING AS PER PLAN PREPARE BED AS PER PLANTING NOTES EQU PI AN VIEW B SHRUB / G.C. SPACING CITY OF FONTANA, CALIFORNIA 72PUBLIC WORKS DEPARTMENT DRAWN BY: LANDSCAPE PLAN SCALE: JE FOR N.T.S. DESIGNED BY: TRACT 16243 DATE: JE LI� ING D IL�!8�, NOTES MARCH 12, 2008 CHECKED BY APPROV BY: I/ /' DWG. N0. SHEET MH C ENGINE ARDO SA VAL. R.C.E. 5115 � � I � 6 of 6 Linear Style Planting with DeepRoot Barriers Determine the correct number of panels to be used. D. Next place the barrier in the trench with the vertical ribs Depending upon the actual planting plan and the number of facing toward the tree and align in a straight fashion. It is trees involved the length of linear barrier will vary, but as a helpful to place the barrier against the hardscape. Use the general rule of thumb take the anticipated mature canopy hardscape as a guide and backfill against the barriers to • diameter of the tree and add 2 feet (61 cm). This will be the promote a clean smooth fit to the hardscape. Be sure to number of feet necessary for a linear style planting keep the barriers double top edge at least 1/2" (13mm) application. (See chart below.) above grade to ensure roots do not grow over the top. A. Choose the barrier that best suits the application. Generally E Plant the tree(s). The Linear style offers a more expansive if a sidewalk, patio or driveway is to be protected, 18" rooting growth area, however adverse soil and drainage �46cm) (LB 18-2) is sufficient depth with 12" (30cm) conditions may exist in the actual planting area. Take steps 1_13 12-2) as an alternate choice for non—aggressive, deeper to ensure healthy growth of the tree at planting. Consult with rooting trees. However for curb and gutter protection or more a local Arborist for planting tips and recommendations. agressive roots 24" (61 cm) (UB 24-2) is generally the better choice, F. If the tree(s) will be subject to maintenance work such as lawn mowing or weed trimming we strongly recommend the B. Dig the trench to the depth based upon the particular installation of ArborGard+ Tree Trunk Protectors which is BERM TO FORM barrier chosen. placed around the base of young trees to protect them from SER BASIN damage by weed trimmers, lawn mowers and small rodents. C. Install the barrier. When using DeepRoot Linear Barriers simply pull the appropriate number of panels out of the box For additional information please consult the 16 page ►TILf2ER TABLETS (they come preassembled) and separate the joiner at the DeepRoot Product Selection and Installation Guidelines. correct length. When Installing DeepRoot Universal Barriers in a linear fashion you will need to join the appropriate number of For information regarding distributors please call: 1 800 ILV panels together. ROOT (458.7668). For help with difficult drainage or other OOTBAL.L difficult installation questions please call DeepRoot Technical BACKFILL MIX. Support at: 1 800 ROOT TEK (766.8835). QWEss[� fi APPROVED 8Y: crrY of FONTANA 1241,00 1& 23126 � CITY ENGINEER DATE: 5{-jlzUf� PLANTINGROBERT W. VffF�DLE *. 12/J1/otl �. DRAWN BY: TIMOTHY RASTEDT. avn. O 11 DATE OF LAST REVISION: STD. PLAN NO. 5,35- SHT. 14F1 PERMANENT BASIN EXISnNG SLOPE i I r 1 1/20X MIN. ROOTBALL DEPTH 2X THE WIDTH OF ROOTBA,LL PUDDLE AND SETTLE BACKAL -- PR1OR TO PLACEMENT OF SHRUB TAPER 1:1 MAX. CUT SLOPE O PLANT P#T FF-41TABLETS (SEE SPECS.) RM18ALL BACKFILL NII (SEE SPECS. TEtSt APPROVED BY: CITY OF FONTANA Ift 2513 CFF Y ENGINEER DATE: 5H RU B ON SLOPE ROBERY W. WEDDLE EV 112/31/011 DRAWN BY: TTMOTW RASTEDT . CML jE OF call � DATE OF LAST REVISION: STD. PLAN NO. 536 1 SHT. 1 OF 1 APPR. DATE COUNTY �pSCgpF MUS/k Wdlur* 7/."/09e R e al f J'>•-Darb�Q- OF CA 41 3612 MISSION /NN AVE RIVERSIDE, CALIF. 92501 L/C. #1512 LAwaSoo:s (909) 781-1930 •sOMETECIE em FAX(909) 686-8091 � J PREPARED BY: RHA PROJECT # 07153 J1:1 joiners ready to pull out of the carton and install in one continuous line of up DeepRoot LB 12-2, LB 18-2 or UB 24-2 to: LB 12-2 80: (24 m) per Carton LB 18-2 52 (16 m) per Carton Line can be separated at any two foot interval. Sidewalk Sidewalk Ground Locks TO BE 24" DEEP ON ALL SIDES DEEPROOT BARRIER PLANT SPACING AS PER PLAN PLANT SPACING AS PER PLAN PREPARE BED AS PER PLANTING NOTES EQU PI AN VIEW B SHRUB / G.C. SPACING CITY OF FONTANA, CALIFORNIA 72PUBLIC WORKS DEPARTMENT DRAWN BY: LANDSCAPE PLAN SCALE: JE FOR N.T.S. DESIGNED BY: TRACT 16243 DATE: JE LI� ING D IL�!8�, NOTES MARCH 12, 2008 CHECKED BY APPROV BY: I/ /' DWG. N0. SHEET MH C ENGINE ARDO SA VAL. R.C.E. 5115 � � I � 6 of 6 For a simple formula to determine the quantity of panels required for a Linear application use: Estimated Diameter of the Tree Canopy at Maturity + 2' (61 cm) = Length of Barrier per Side. As little as one side of the tree may For One Side of Tree need barrier for root direction as EVected Tree Number of Feet of Optional llnnrwW there may be no hardscape else— Canopy at Mabuk Linear Barrier Barrier (U8) in • where requiring protection. (LB 12 or LB 18) number of Panels Note: Linear Barriers (LB 12-2 and LB 12' 3.6m Diameter +2' 61 cm = 14' 4.2m 7 Panels 18-2) are packaged in 2' (61 cm) long 18� 5.5m Diameter +2� 61 cm = 20� 6.1 m 10 Panels panels with pre—attached flexible 24 7.3m Diameter +2 61 cm = 26 7.9m 13 Panels QWEss[� fi APPROVED 8Y: crrY of FONTANA 1241,00 1& 23126 � CITY ENGINEER DATE: 5{-jlzUf� PLANTINGROBERT W. VffF�DLE *. 12/J1/otl �. DRAWN BY: TIMOTHY RASTEDT. avn. O 11 DATE OF LAST REVISION: STD. PLAN NO. 5,35- SHT. 14F1 PERMANENT BASIN EXISnNG SLOPE i I r 1 1/20X MIN. ROOTBALL DEPTH 2X THE WIDTH OF ROOTBA,LL PUDDLE AND SETTLE BACKAL -- PR1OR TO PLACEMENT OF SHRUB TAPER 1:1 MAX. CUT SLOPE O PLANT P#T FF-41TABLETS (SEE SPECS.) RM18ALL BACKFILL NII (SEE SPECS. TEtSt APPROVED BY: CITY OF FONTANA Ift 2513 CFF Y ENGINEER DATE: 5H RU B ON SLOPE ROBERY W. WEDDLE EV 112/31/011 DRAWN BY: TTMOTW RASTEDT . CML jE OF call � DATE OF LAST REVISION: STD. PLAN NO. 536 1 SHT. 1 OF 1 APPR. DATE COUNTY �pSCgpF MUS/k Wdlur* 7/."/09e R e al f J'>•-Darb�Q- OF CA 41 3612 MISSION /NN AVE RIVERSIDE, CALIF. 92501 L/C. #1512 LAwaSoo:s (909) 781-1930 •sOMETECIE em FAX(909) 686-8091 � J PREPARED BY: RHA PROJECT # 07153 J1:1 joiners ready to pull out of the carton and install in one continuous line of up DeepRoot LB 12-2, LB 18-2 or UB 24-2 to: LB 12-2 80: (24 m) per Carton LB 18-2 52 (16 m) per Carton Line can be separated at any two foot interval. Sidewalk Sidewalk Ground Locks TO BE 24" DEEP ON ALL SIDES DEEPROOT BARRIER PLANT SPACING AS PER PLAN PLANT SPACING AS PER PLAN PREPARE BED AS PER PLANTING NOTES EQU PI AN VIEW B SHRUB / G.C. SPACING CITY OF FONTANA, CALIFORNIA 72PUBLIC WORKS DEPARTMENT DRAWN BY: LANDSCAPE PLAN SCALE: JE FOR N.T.S. DESIGNED BY: TRACT 16243 DATE: JE LI� ING D IL�!8�, NOTES MARCH 12, 2008 CHECKED BY APPROV BY: I/ /' DWG. N0. SHEET MH C ENGINE ARDO SA VAL. R.C.E. 5115 � � I � 6 of 6