PRESOAKING SEED: Seed noted to be pre—soaked shall be
C
GRADING: Areas shop be raked and floated smooth to
done so in clean potable water for twelve (12)
consecutive hours prior to hydroseeding. After
B.
TOP SOIL: Excess topsoil shall be removed from the
2. Minor pick—up items may be completed during the
basic maintenance period such as:
W.
WEED CONTROL:
provide a true and uniform surface.
soaking is started, seed that drys out will be deemed
site.
A.
KILLING WEEDS: Contractor shall germinate and destroy
g y
D.
PLANT PITS AND FERTILIZER: Planting pits for ground
unacceptable.
C.
NEATNESS: Leave the sidewalks and streets in a neat
a. Resodding of bare spots in lawn.
b. Replacement of damages or non—conforming
P g g
existing weed seeds before preparing areas for
cover shall be 4" x 4" or adequate to accept material
E.
PREPARATION.
and clean condition at the end of the day.
y
plant material.
planting. Sufficient water shall be applied to cause
week seed to sprout. Young weeds shall then be
P g
from flats without crushingor the rootball.
g
Place a 20-10-5— Agriform 5 gram fertilizer tablet in
D.
REMOVAL OF TAGS: Remove all tags, labels, nursery
C. Re—staking or tying of frees.
destroyed and removed before they have opportunity to
each round cover.
g
1. All hydroslurry mixes shall be mixed at the site
under the observation of the Owner and Landscape
stakes and ties from all plants unless otherwise
P
d. Lowering of sprinkler heads to grade after
turf has established.
set seed.
E.
PLANTING.- All ground cover areas noted on the pions
Architect as it is placed in the hydroslurry
directed, only at the end of all installations.
f. Replacement of unauthorized substitutions.
B.
ADDITIONAL REQUIREMENTS. For additional weed killing,
shall be rooted cuttings from flats and shall be
planted in staggered rows continuously under all trees
tank.
XVII.
PROTECTION:
refer to Planting Notes on the Planting Plan.
and shrubs at the spacing indicated on the plans. All
2. Begin slurry preparation by adding water to the
B. FINAL MAINTENANCE INSPECTION: At the end of
Vll.
SOIL PREPARATION:
plants shall be protected from drying out prior to
tank when the engine is at one—half throttle.
A.
GENERAL: At all times during construction, adequate
maintenance period and when ground covers and turf
planting.
When the water level has reached the height of
protection shall be provided for all planted areas
have established and all pick—up items have been
A.
SOIL REPORT: Before startingsoil preparation the
P P
the agitator shaft and good recirculation has
against damage of any kind, until final acceptance by
the Landscape Architect.
completed, the Contractor shall request a final
maintenance inspection. The Contractor will be
Contractor shall submit a soil report to the Owner and
Landscape Architect. If no soil report is submitted
F.
WATERING. Each section of ground cover shall be
immediately watered upon completion of planting, and
been established, add the fertilizer to the
mixture (the tank shall be at least 1/3 filled
advised by the Landscape Architect at the final
it will be assumed that amendments were not added and
thereafter as re q wired.
with water at this time).
)
B.
RESPONSIBILITY The Contractor shall be held
responsible for the care and preservation of all
inspection that work is or is not satisfactory.
the Landscape Contractor will be requested to give a
credit for soil preparation.
G.
SPACING FROM EDGE: The first row of ground cover
,,
3. Open the engine throttle to full speed when the
existing buildings and structures on the property and
adjacent premises. Any port of them injured, damaged
1. If the work is satisfactory, the basic
maintenance period will end on the date of the
should always be within 6 of the edge of the planting
area.
tank is 1/2 filled with water. Add all organic
amendments, fiber, seedmix and chemicals by the
or disturbed because of his work shall be repaired,
final inspection.
B.
COMPACTED AREAS: Soil areas that are compacted to
time the tank is 2/3 to 3/4 full.
replaced or cleaned by him at his expense.
more than 929 duringsite preparation shall be ripped
P P PP
2. If the work is unsatisfactory the basic
,�
to a minimum of 12 prior to beginning soil
preparation. These areas shall be defined by the
X.
SEASONAL COLOR:
4. Start spraying immediately when the tank is full
XWH.GUARANTEE:
maintenance period will continue at no
additional expense to the Owner until the work
Landscape Architect and be billed as an
A.
REFERENCE: Refer to Paragraphs V. W. VII. for finish
and the slurry is mixed.
has been completed, inspected and approved by
extra if the unit price is quoted in the bid.
grading, weed control, and soil preparation.
A.
SHRUBS: All shrubs shall be guaranteed as to growth
g g
the Landscape Architect.
F.
APPLICATION:
and health for a period of ninety days after
C.
METHOD OF MIXING: If the slope is under 2 1 2 to 1
P �
B.
SOIL PREPARATION: Prepare the soil as per these
completion of the specified maintenance period and or
P P P �
C. FAILURE TO PASS INSPECTION: if work fails to pass
the soil preparation materials should be broadcast
P P
specifications and the Planting Notes on the Planting
1. Apply the hydromulching in the form of a slurry
final acceptance b the Owner.
P y
final inspection, any subsequent inspections must be
uniforml over all landscape areas and worked to a
Y P
Plan.
consisting of organic soil amendments,
rescheduled as per above, and will be charged to the
depth of 6" b a rototilier or other acceptable
P Y P
commercial fertilizer, and other chemicals
B.
TREES. Trees shall be guaranteed to live and row in
9 9
Contractor at the prevailing hourly rate of the
mechanical means to obtain a uniform blend to
C.
GRADING: Areas shall be raked and floated smooth to
called for. When hydraulically sprayed onto the
acceptable upright position for one year after the
Landscape Architect.
the soil. If the slope is greater than 2 1/2 to 1 the
provide a true and uniform surface.
soil, the mulch shall form a blotter like
specified maintenance period and/or final acceptance
amendments shall be hydraulically applied for areas
material. Direct the spray operation so that
by the Owner. The owner must provide adequate
over 1000 square feet and raked in for small areas.
D.
QUALITY OF PLANTS: Plants shall be healthy annual
the slurry spray will also penetrate the soil
maintenance to insure the extended guarantee on trees.
For the soil amendment mix refer to the Planting Notes
plant material in 4" pots in boom.
surface as to drill and mix the slurry
on the Planting Plan.
components into the soil, thus ensuring maximum
C.
DEFINITION OF DEATH: Plants which die or lose more
E.
PLANT PITS AND FERTILIZER. Each plant pit for
impregnation and coverage. The impregnation and
than 309 of their original leaves shall be replaced.
D.
EXTRANEOUS MATERIAL: In addition to the work
seasonal color shall be 6x6 X6" with one teaspoon of
mixing of components will help in retaining
specified above the Contractor shall remove all
bone meal mix into the backfill mix. (Use shrub
moisture while stabilizing soil surface from
D.
REPLACEMENT: The Contractor within seven (7) days of
extraneous material that is exposed on the surface and
backfill mix). Do not use Agriform plant tablets.
superficial erosion.
written notification by the Owner shall remove and
grade to facilitate run—off of surface water.
replace all guaranteed plant materials which, for any
G
WATERING. Each section of seasonal color shall be
2. Spray the area with a uniform visible coat using
reason, fail to meet the requirements of this
E
DELIVER SUPS: Supply delivery slips from the
immediately watered upon completion of planting, and
the dark color of cellulose fiber or organic
guarantee. Replacement shall be made with plant
supplier for the soil amendments to the site (Bulk
watered thereafter as required
amendment as a visible guide. The slurry shall
materials as indicated or specified for the first
loads from the Contractors yard will not be accepted
be applied in a downward drilling motion via a
planting and all such replacement materials shall be
Supply empty bogs for fertilizer to the Superintendent
H.
SPACING FROM EDGE: The first row of seasonal color
fan stream nozzle.
guaranteed as specified for the original guaranteed
of the job.)
should always be within 6 of the edge of the planting
material.
area.
G
TIME LIMIT: All hydroslurry mixture that has not been
VIII.
SHRUB AND TREE PLANTING.
used within two (2) hours shall be disposed of off—
XIX.
MAINTENANCE
Xl.
SOD LAWN MATERIALS & PLANTING (IF APPLICABLE):
site at the Contractors expense.
A.
CORRELATION. Trees and shrubs shall not be planted
A.
MAINTENANCE PERIOD: The maintenance period shall
until all operations in conjunction with the
A.
QUALITY Sod shall be #Grade, machine cut at a
H.
CLEAN—UP: Any slurry sprayed or spilled in an area
commence upon the Owner's written approval of all
installation of the sprinkler system have been
uniform thickness of 5/8" excluding tip growth and
other than that designated in the plans shall be
phases of planting installation and shall be for the
completed, final grades have been established, and the
thatch, weed free and shall be no less than eight
cleaned up at the Contractor's expense.
following period. -90 DAYS
planting beds properly prepared by cultivation and
months nor more than sixteen months old.
fertilization as covered in these specifications.
1.
RESEEDING: All bare spots shall be reseeded by the
B.
GENERAL: The general care and maintenance of all
B.
TiMING: Installation shall take place within 24 hours
Contractor within ten (10) days. The Contractor will
areas shall consist of proper watering, fertilization,
B.
HANDLING AND STORAGE: All plants shall -tie handled and
after harvesting.
be responsible for all reseed areas for as long after
weeding, clean—up to maintain all plants and turf in a
stored so they are adequately protected from drying
seeding as necessary until an acceptable stand of
healthy, growing condition and as noted below.
out, sun, windburn or any other injury.
C
REFERENCE: Refer to Paragraphs V. W. VII. for finish
hydroseeded material is realized and approved by the
grading, weed control, and soil preparation.
Owner.
C.
GROUND COVER: Ground cover from flats—areas without
C.
PLANTING TiME: No planting shall take place during
overseed — apply a pre—emergent herbicide in
extremely hot, dry, windy or freezing weather.
D.
PREPARATION. Sod area prior to planting shall be
J.
GERMINATION STAGE IRRIGATION. Approximately twenty
accordance with the manufacturer's printed
rolled lightly and watered to a depth of 6" the day
five (25) hours after hydromulching the planting
instructions.
D.
LOCATIONS. Relative position of all plants and trees
prior to planting. If any air pockets are found, the
areas, initiate the watering sequence. The water
is subject to approval of the Landscape Architect and
area shall be regraded as necessary. Lightly water
should be left on long enough to moisten the soil
D.
FER77LIZA77ON: Maintenance work shall include
they shall, if necessary, be relocated at his
the area to be planted just prior to planting.
thoroughly to the depth of the fiber, taking care not
fertilization with a commercial fertilizer at 30 day
direction as part of this contract.
to super saturate or to wash the fiber or soil
intervals as noted herein. The fertilizer may be
E.
INSTALLATION. Sod shall be laid in a staggered
particles off the slopes. The Contractor will have to
superseded by the soils report and shall be approved
E.
DISTRIBUTION. No more plants shall be distributed
pattern, with tight joints and in the some direction
repair all seed washing or erosion at his own expense.
by the Landscape Architect.
about the landscape area than can be planted and
each time. On all , slopes sod shall be installed from
The fiber and seed must be irrigated lightly and
watered on the same day.
the bottom up and the newly laid sod should be
frequently to maintain optimum moisture content for
E.
WEEDING: Any concentrated development of weed growth
protected by walking on boards as installer moves
maximum germination. At all times the irrigation
that may appear in planting areas during the
F.
CONTAINER REMOVAL: Plant containers shall be removed
upward. On metal staples will be allowed. No sod of
system must be observed while in operation.
maintenance period shall be removed at 10 day
when planting the plants. Cans shall be split on both
less than 18" in length will be allowed. No sod of
Irrigation sequence must be determined by air
intervals. The Contractor shall remove such
sides. An axe or spade shall not be used. All
less than 18" in length will be allowed
temperature, prevailing wind velocity, soil texture,
concentrations of weeds manually.
containers shall be removed from the site.
orientation and other logistical problems. It is
F.
JOINTS: Adjoin the section of sod firmly together.
imperative that the soil be kept moist at all times
F.
GROUND COVER AREAS: Cultivate all non—hydroseeded
G.
PLANTING PITS. All tree and shrub pits shall have a
If air spaces occur between sections of sod they must
during the germination period.. The light, frequent
ground cover areas at not more than 10 day intervals.
diameter of at least twice the diameter of the
be filled with sand or have the sod relaid.
irrigation sequence should continue until the
rootball. Pit depths shall be minimum 12" deeper than
seedlings have grown beyond the germination stage.
G.
SHRUBS AND TREES: All shrubs shall be pinch—pruned as
the rootball for trees and 8" deeper than the root
G.
ROLLING: Roll sod with on adequately weighted roller
necessary to encourage new growth. Dead, wilted
ball for shrubs or as per planting details.
to smooth out the sod bed.
K.
ESTABLISHMENT STATE IRRIGATION: The irrigation
flowers and dead foliage shall be continuously
sequence (frequency) shall be reduced while the
removed. No pruning shall be done to shrubs or trees
H.
PLACING: Plants shall be placed and held during
H.
PROTECTION OF EDGES: Regrade to protect the edges
duration of each watering cycle will be increased. A
without the approval and under the direction of the
backfill in an upright position in the center of the
from drying if mowing edge is not used
specific watering program shall be approved by the
Landscape Architect. All wounds over 1-1/2 inches in
pit. Plants shall be held of, or slightly above
Owner and Landscape Architect but should approximate
diameter shall be sealed with an approved free seal.
nursery level. The earth ball shall be kept intact.
I.
WATERING. After installation sod must be kept
watering once a day through completion of the
Any exposed roots shall be spread. Injured roots
thoroughly watered to a depth of 6" No foot traffic
maintenance period.
H.
TURF AREAS: Edge and mow to a height of 2 inches
shall be pruned
should be allowed for 2 or 3 weeks from the date of
whenever the turf reaches a height of 3 inches. Grass
I.
BACKFILL: Plant pit backfilling soil shall consist of
installation.
L.
HARDENING OFF STAGE IRRIGA71ON: At the end of the 90—
clippings shall be removed off—site.
1 part nitrogen stabilized sawdust — 2 parts topsoil.
day establishment period, as determined by the
Materials shall be thoroughly mixed before
J.
INSPECTION BY SUPPLIER. If there are any questions
Landscape Architect, reduce the watering frequency to
1.
SUBSURFACE DRAINS: All subsurface area drains shall
replacement. In addition to backfill commercial
regarding the quality of sod Installation a
once every three (3) days, while increasing the
be periodically flushed with clear water to avoid
fertilizer 20-10-5 Agriform 21 gram tablets shall be
representative of the supplier shall be requested to
duration of the water sufficiently to allow for
build—up of silt and debris. Keep all drain inlets
added to plant pits at the following rates:
inspect the installation and the Contractor called out
maximum water penetration for the expanding root
clear of leaves, trash and other debris.
by the supplier's representative.
system, while at the same time taking care not to
* one tablet per one gallon container
cause erosion. The precise watering reduction program
J.
PROTECTION: During the maintenance period, the
* two tablets per five gallon container
X11.
SEED LAWN PLANTING (IF APPLICABLE):
shall be determined by the Landscape Architect.
Contractor shall be responsible for maintaining
* three tablets per 15 gallon container
adequate protection of all planting areas. Any
* four tablets per 20" and 24" box
A.
REFERENCE: Refer to paragraphs V, W, VIII, for
XIV.
SCOPE OF EROSION CONTROL WORK:
damaged areas shall be repaired at the Contractor's
* five tablets per 30" box
finish grading, weed control, and soil preparation.
expense.
* six tablets per 36" box
A.
EROSION CONTROL: Installation will be required in
* seven tablets per 42" box
B.
PREPARATION. Cultivate to a depth of 2" below finish
locations specifically delineated on the drawings or
K.
RE—HYDROSEEDING. The Contractor shall re—hydroseed
* eight tablets per 60" box
grade, remove stones, foreign growth of any kind and
as necessary due to field conditions.
all hydroseed areas eroded or non—germinating at the
* nine tablets per 72" box
extraneous matter, and grade to remove ridges and
end of each 30 days of maintenance.
* ten tablets per 84" box
depressions so that areas after settlement will
1. The surface of the slopes shall uniformly smooth
* ground cover plants planted from flats or liners in
conform to the finish grade. Roll and rake lightly
and even with all debris and rocks raked out.
L.
IRRIGATION: All irrigation must be operating properly
2:1 or steeper slopes shall receive one 5 gram tablet
until the surface is smooth, friable and of uniform
The soil shall be sufficiently moist to permit
and adjusted properly for efficient coverage and
per plant
fine texture.
the firm laying of erosion control matting and
minimum oversproy at the end of the maintenance
to prevent sloughing of topsoil.
period.
C.
SOWING: Sow lawn seed in the area designated on the
J.
WATERING. When the pit has been backfilled to three—
drawings at the rate as designated on the planting
2. The erosion control matting shall be laid with
M.
FINAL ACCEPTANCE: Will be given at the end of the
quarters of its depth water shall be poured about the
notes. Sow the lawn in two directions.
the direction of flow of surface drainage, and
maintenance period for all planted areas once
roots. Air pockets shall be eliminated and backfillin
accordance with the manufacturers
hydroseed germination and plant establishment has been
continued until the backfill is brought to the grade
D.
TOP DRESSING: Rake lightly, spread 1/4" of Por -5 top
directions. The matting shall be cut to provide
obtained and there are no barren areas larger than 3"
level.
dressing with a mechanical spreader, roll with 200 lb.
a visually pleasing slope.
x 3" All plants must be in a healthy, growing
roller and water with a fine spray.
condition as approved by the Landscape Architect and
K.
COMPACTING: Backfill shall not be compacted around
3. The matting shall be stapled in place and firmly
Owner.
the roots or ball of the plant during or after
XIII.
HYDROSEEDING SPECIFICATIONS (IF APPLICABLE):
embedded by means of tamping or rolling, as
planting. The backfill on which the plant ball rests
approved by the Owner, to ensure that the
N.
CONDITION OF SITE. During the maintenance period,
shall be lightly compacted.
A.
GENERAL: The hydro—mulch shall be applied in the form
matting is in contact with the soil and that no
keep the project neat and free from debris at all
of a slurry consisting of wood cellulose fibre, seed,
erosion can take place under the matting.
times. Obtain the Owner's approval for onsite storage
M.
STAKING. Stakes shall be driven to sufficient depth
chemical additives, commercial fertilizer and water.
of equipment or maintenance materials.
to hold tree rigid. Tree shall be supported by at
When hydraulically sprayed on the soil surface the
4. Planting of turf, ground covers, shrubs and/or
least two ties (see details).
hydromulching shall form a blotter like ground cover
vines may be required in areas protected by
XX.
FINAL CONSTRUCTION INSPECTION AND FINAL
impregnated uniformly with seed and fertilizer and
erosion control matting as specified in the
MAINTENANCE INSPECTION.-
NSPECTION.0.
0.
PRUNING: Limbs, branches, canes and runners which
shall allow the absorption of moisture and rain fall
plans or as becomes necessary.
require trimming shall be removed to leave a clean cut
to percolate to the underlying soil. hydro—mulch
A.
FINAL CONSTRUCTION INSPECTION: When all landscape
flush with trunk. (Pruning only as directed by the
specifications may be superseded by the Horticultural
XV.
REPLACEMENTS:
improvements have been installed in accordance with
Landscape Architect).
soils test.
the plans and specifications the Contractor shall
A.
GENERAL: The Contractor shall immediately replace
notify the Landscape Architect and request a "Final
P.
PLANTING BEDS: Plantingbeds shall be edged and
9
B.
SEED MIXES: Seed mixes to be used on this project are
any and all plant materials which for any reason die
Construction" inspection. If the Landscape Architect
P P
cultivated to the line shown. Beds shall be brought
9
designated on the plans and noted in the plant legend.
or are damaged while under his care. Replacements
determines the work to be substantially complete and
y P
to a smooth even surface conformingto established
C.
GUARANTEE: The Landscape Contractor shall be
shall be made with plants of like kind and size in the
in conformance with plans and specifications, the
P P
grades after full settlement has occurred
responsible for the quality of all labor and materials
same manner as specified for the original planting.
Contractor will be advised that the basic maintenance
Xi.
SHRUB COVER AREAS:
as provided by subcontractors and suppliers, including
XVI.
CLEAN—UP
period is started.
seed mix, hydroslurry ingredients and their.
application.
1. In order to be substantially complete, at least
A.
REFERENCE: Refer to Paragraphs V W. Wit. for
A.
GENERAL: After all installation operations have been
the following must have been finished:
finish grading, weed control, and soil preparation.
completed remove all trash, excess soil, empty plant
containers and rubbish from the property. All scars,
a. All fine grading, including elimination of
B.
SOIL PREPARATION. Prepare the soil as per these
ruts or other marks in the area caused by this work
low points that hold runoff.
specifications and the planting Notes on the Planting
shall be repaired and the ground left in a neat and
b. A complete and operable irrigation system.
Plan.
orderly condition throughout the site. Contractor
C. Installation of all plant materials.
shall pick up all trash resulting from this work no
d. Seeding of off seeded areas.
less than each Friday before leaving the site, once a
week and/or the last working day each week. All trash
shall be removed completely from the site.