Loading...
HomeMy WebLinkAbout4072-1GENERAL NOTES 1. CONT RAGT VM#46 . Shall consist of . s peclfkatlaw and its general conditions and the &awhgs. The intent of these documents Is to Include all labor, matorlals, and servkos necessary for the proper execution of the work. The documents aro to be considered as ono, and whatever is called for by any part shall be as I;MLV as if called for by all pangs. 2. YFRIFIGATION: The contractor shall verify nmm romonts on the &awkW before beghnhg work In case of error or discrepancy in f1w drawings or speclfkatO ns or In work of -others affoathg his work, he shall notify the owners representative i M&Itely. Tfie contractor shall be held responsble for axy damage or loss do to his failure to observe thea hwiructWo. 3. LICDOE: All work shall be performed by a C-21 Califmla LkensedLand'scap+e Contractor. 4. IN5WANGE: The Contractor shall carry all hlorkmans Compensation, Pbbllc Lkelity and Property barrage hsurcnce as required by all applkable codes, regulations and the owner. 5. L WWAPE ARCHITECTS LIABILITY The owner and contractors, recognizing the hhera t Mob cavwted with construction, agree to Urrdt axy cid all liability clam for damages, cost of defense, or eases to be levied against the Architect on account of crry design defect, error,ombalon, or profes bvi negligence to a sum not to exceed $50,WO, or Mo amount of the Landscape Architects foe, whichever is lesser. 6. C WTRUGTIO'N SAFETY: The design, adoquacy and safety of erection, excavation, bracIS shoring temporary s"aorts, etc, is the sole rosponsibility of the GMk=tor, and has -not been considered by the Architect or his consultants. Tho contractor is responsible for the stabllliy of any structures and excavaibm and shall provide the necossa^y brachg to provide stability drhg the entire construction progress. Observation visits to the site by the Lanctscgao Architect or his consultants shall not Include Inspection of the above items. 7. 50WEYS, PERMITS, RE6ULAT IONS:The owner shall furnish an adagvate survey of the property. Tire contractor shall obtah and pay for all permits acrd candy with all laws aid ordinances bearing on the operation or conduct of the work as d%*v amu specified. If the contractor observes, that a variance exists dwomlih he shall pro rtly notify the owners representaiivo in writing and any necessary cha ys; shall be a*ated as provldod In the contract for changes in the work. 8. PROTECT ION OF AVW FROPF Z7Y AND PERSON: The . contractor shall adequately protect the work adjacent property and the pmblic, and shall be respom ble for any damage or Injury due to his act. Q. Gk4N6F5 IN THE MORK:The owner may order changes in the work The contract sum beteg adjusted accordhgly. All such orders and adjustments pets claim by the contactor for extras must be made before. executing the monk Involved. 10. PROVISIONS FOR E 7RAS. No new work of any khd shall be considered an extra unlessa separate estimate Is given for said murk before It is corrrrenced and uriill.sane is approved by the owner, and Odes not unless the owner first so ordered in writing and the pertkular extra work is specifled In withg and tine cost agreed Won bet%reen the owner and the contractor. Except for extra work ordered by Av owner accondhg to unit prices which have bean bid, any extra work performed, not authorized as provided above, will not and cannot be paid for by the owner. Il. %0STI7U7I0NS.- All. materials shall be specified unless the contractor can establish the fact that they are unavailable, and substibttk+ns are approved h writing by the Lardscgae Archltect� 12. GORREGTION OF kVR1G The contractor shall be re -execute any vArk that falls to conform to gine requirements of the contract aid shall remedy defects dre to f&rlty. materials or wo kwiship Wm written notke-.from tine project manager for a period -of 6vfy (40) days from date of completion of the contract. The Irr"lon system shall Cary a one year go -antes. The paragraph gvplles to the `work of subcontractors as well an employees of t#ne contractor. 13. LANPWAPE 000WINATORS STATU5: The landscape coordinator acts as the authorized representative of the owner in con unction►with the project manager, and has the authority to accept of reject materials or workrmwishlo and to make minor changes in work not Invo". extra cost. He will also- hterprot the meaning of the contract documents and may stop. the work If necesaary to Insure Its proper execution. 14. CLARIFICATION OF DRANIN65 BEFORE BIDDING: After reviewing the &-awk s thoroughly it is tine contractorsresponsblllty to clarify with the Landscape Architect or owrna-s representative, any qumfons the contactor may have rv9a-dhg- the method of constructlon, quantltles, or quality of materials hdkated or called out. If the contractor carrot contact the Landscape Architect or owners represenWho, the contractor must qualify ha bid or accept the Interpretation of the Landscgae Architect or owners representative on the questionable areas as May develop ai" construction. Is. SAMPLES: E,S: The Landscape Architect reserves the right to take and analyze samples of materials for conformity to specifkatons at any time. The contractor shall furnish samples upon request by the L.andscapo Architect. Rejected material shall be immodk tely removed from the site and replaced at contractors e)ome. The cost ,of testing materials not meeting specifkatkaw shall be paid for by the contractor. 16. PRE-GONSTRZ770N WNPOWCE: Sdiedtle a pro -construction meeting with the Archltsct at least 7 days before beghnhg work The purpose of this conference is to rovlew any questkms the contractor may have regcrdhg the mock admhlstrative procedros d�rhg conskwfl w and project work schedule. ly COINPLETION: Completion is defined as being when all conditbw of the contract have boon accompllshod. Specifically when all items. are Installed, the area cleaned and the maintenance period satisfactorily completed, aid then all special tools aid equorwA. b kwtlaw, written as -built pkns, lien releases and any items required by the contract dbouments have been properly executed and delivered to the owner. The Architect shall have full authority to accept or reject the contract items and will promptly notify the owner of completion. 16. 6ilARAN7W In addition to spedfled guarantees provided for in the separate sections of the specifkatiom, the contractor shall grids►tee h withg all workr4neh#2 aid materials to b8 free from defect for a period of one year from the date of acceptance of the work by the owner without additional cost to the owner: CFE) FONTANA., CALIFORNIA LANDSCAPE ARCHITECTURAL PLANS SITE PLAN VICINITY MAP CITY OF RIALTO CITY OF FONTANA SITE OWNER I No. FONTANA EF K. HOVNANIAN, FORECAST HOMES 4240 E. JURUPA` STREET, Ste: 402 ONTARIO, CA 91761 MILLER AVE. NOT TO SCALE: SHEET INDEX 1 of 10 TITLE SHEEP 2 of 10 LANDSCAPE NOTES 3 of 10 IRRIGATION PLAN 4 of 10 IRRIGATION PLAN 5 of 10 IRRIGATION DETAILS 6 of 10 PLANTING PLAN 7 of 10 PLANTING PLAN 8 of 10 PLANTING DETAILS 9 of 10 LANDSCAPE SPECIFICATIONS 10 of 10 LANDSCAPE SPECIFICATIONS CONSULTANTS: CITY REQUIRED NOTES ,l I- iT IS THE LANDSCAPE CONTRACTORS' RESPONSIBILITY TO CONTACT THE ENGINERING DIVISION'S LANDSCAPE INSPECTOR 48 HOURS PRIOR TO DESIRED INSPECTION OF AN ITEM AT (QOQ) 350-66441. 2- PRIOR TO RELEASE OF UTILITIES OR MAINTENANCE PERIOD COMMENCEMENT THE FOLLOWING INSPECTIONS ARE REQUIRED: -pre construction meeting -inspection of irrigation system in open trench condition (prior to backfill). mainline pressure test O 150 p.s.i. for a three (5) hour continuous period -irrigation coverage tests including initial and final tests -f finish grade prior to planting -planting, including street trees, 'contact the Parks Planning and Landscape Development Section, Engineering Division, for species and final location -compliance with approved plans -final inspection 3- THE OWNER'S REPRESENTATIVE AND LAN SCAPE CONTRACTOR SHALL BE PRESENT AT EACH INSPECTION. CIVIL ENGINEEKo ARCHITECT: BASELINE ROAD TGA DEVELOPMENT & ENGINEERING, INC. KTGY GROUP, INC 1181 CALIFORNIA AVENUE, SUITE 101 B 17992 MITCHELL SOUTH CORONA, CALIFORNIA 92881 IRVINE, CALIFORNIA 92614 MONTGOMERY AVE. ¢ CONTACT: MANNY GONZALES CONTACT: STEVE STAND TEL (951) 371.0264 TEL (949) 851-2133 UJ o < C) w MILLER AVE. F— Q w z0 0 CD Q J zAPPROVALS O � L�. LL. LI -0 0 U U NOT TO SCALE ENGINEER R E VI S O N S APPROVAL DATE APPROVAL DATE BENCHMARK osc a�F CONSULTANT CITY OF FONTANA to zM 9 Inc. DRAM BY: �: I F 9 r R. LOPEZ . AS SHOWN 28 Landsca Archtecure.Land Planning. Design RECOR.D DRAWING E • 9� 0 07 722 N. Diamond Bar Blvd. T. (909) 861-4130 DESIGM BY: DATE: wwwseguraLkcom Diamond Bar, CA 91765 F. (909) 861-3709 T. SEGURA TRACT NO, 16482 APRIL 27, 2006 s�9 � CHECKED BY: 'Y � , / � DWG. N0. OF cAPPROVED: ,f;�C,.��c ,L�L�, �;� n �. /(, 5115 4072 1 S.A.05-49 T. SEGURA �� c�nr o�m R.c.E 10