Loading...
HomeMy WebLinkAbout3444-1CONSTRUCTION NOTES: VICINITY MAP (Not to Scale) (SIGNING AND STRIPING) INSTALL STRIPING DETAIL (INCLUDING PLACEMENT OF RAISED PAVEMENT MARKERS), ARROW OR LEGEND AS SHOWN. F2] INSTALL 300mm (121) WHITE CROSSWALK AND/OR LIMIT LINE. F3 INSTALL SIGN AND/OR POST AS SHOWN. INSTALL MODIFIED DETAIL 12 TO REPLACE TYPE G REFLECTIVE MARKERS WITH TYPE C. �5 N/A F6] RELOCATE SIGN AND POST AS SHOWN. F7] REMOVE SIGN AND POST. FBI INSTALL MODIFIED DETAIL 38 TO REPLACE TYPE G REFLECTIVE MARKERS WITH TYPE C. 1-91 INSTALL SIGN ON PROPOSED STREET LIGHT POLE. Flo] INSTALL 300mn (12') WHITE STRIPE AT 45: Fl-il INSTALL IOOmm (4') WHITE LINE. [12] RELOCATE SIGN TO TRAFFIC SIGNAL POLE. F13] INSTALL MODIFIED DETAIL "Al TO REPLACE TYPE G REFLECTIVE MARKERS WITH TYPE C. CITY OF FONTANA, L_ D I cc)lms u muc u UOH FOR CALIFORNIA PD A LL A H a SOUTH HIGHLAND AVE. FROM ATTNs MS. MARCIE HART 650' EAST TO JUNIPER RIALTO, CA 92376 AVENUE (909) 456-3652 STREET, STORM & SAFETY OF CITRUS SEWER, STR TSCAP S, DRAIN, TRAFFIC. SIGNAL, LIGHTING CITY OF FONTANA UTILITY NOTIFICATION LIST CITY OF FONTANA PACIFIC BELL ATTN= MS. GRAC I ELA MARTINEZ ATTN= MR. OMAR LOYA 8353 SIERRA AVENUE 3939 E. CORONADO STREET, 2ND FLOOR FONTANA, CA 92335 ANAHEIM CA 92807 (909) 350-6522 (714) 6k-5500 SO CALIFORNIA GAS COMPANY ATTN= MR. RICKEY REYES TIME WARNER TELECOM 1981 W. LUGONIA AVENUE ATTNs MS. MARCIE HART REDLANDS CA 92373-0306 521 W. RIALTO AVENUE (909) 33�-7508 RIALTO, CA 92376 24 -INCH RCP (D -LOAD (909) 456-3652 SO. CALIFORNIA EDISON COMPANY GOLDEN STATE UTILITY COMPANY ATTNi MR. GREGORY KLOCK ATTN= MR. HOWARD ER I KSEN 7951 REDWOOD AVENUE P.O. BOX 2968 FONTANA, CA 92336 TURLOCK CA 95381-2068 (909) 357-6585 (209) 634-4981 SAN GABRIEL VALLEY WATER COMPANY ADELPHIA ATTN: MR. LUIS MONTENEGRO ATTN: MR. PAUL CYR 11142 GARVEY AVENUE 1205 DUPONT AVENUE EL MONTE- CA 91733 ONTARIO CA 91761 (626) 44A-6183 X252 (909) 05-3342 CONSTRUCTION NOTES (SEWER IMPROVEMENTS) 60 CONSTRUCT 8 INCH EXTRA STRENGTH VCP SEWER 61 CONSTRUCT SEWER MANHOLE PER CITY OF FONTANA STD N0. 112. 62 N/A 63 CONSTRUCT 10 INCH EXTRA STRENGTH VCP SEWER 64 CONSTRUCT 6 INCH EXTRA STRENGTH VCP SEWER LATERAL HOUSE CLEAN OUT PER CITY OF FONTANA STD N0. 125 INCLUDING BOX. 65 REMOVE EXISTING 8 INCH STUB (L=5') AND BREAK INTO EXISTING SEWER MANHOLE AND MODIFY CHANNEL BASE PER APWA 208-I �5 BREAK INTO EXISTING SEWER MANHOLE AND MODIFY CHANNEL BASE PER APWA 208-I 66 PLUG END OF PIPE. CONSTRUCTION NOTES: (STREET LIGHT CONDUIT) 67 INSTALL NEW 101/2' X 17' X 12' CONCRETE VAULT FOR SCE BY CONTRACTOR 68 INSTALL CONDUIT RUN FOR SCE BY CONTRACTOR AS SHOWN BELOW N0OF CONDU I T . PROPOSED CONDUIT RUN FOR STREET LIGHT WITH DETAILS AND DEPTH 36' MIN. LENGTH OF CONDUIT RUN (FEET) POTHOLE VERIFICATION V) �0 ON, IMPROVEMENT Ifm �A PROJECT CONSTRUCTION NOTES: (STREET IMPROVEMENTS) I PROTECT IN PLACE. 2 REMOVE EXISTING P.C.C. , A.C., PAVEMENT, OR SOIL. 2A N/A 26 N/A O3 CONSTRUCT 6 % ANCH THICK ASPHALT CONCRETE OVER 4 INCH THICK CRUSHED AGGRE�G TE BASE MATERIAL. 3A COLD MILL 30.48mm (0. 1') OF EXISTING A. C. PAVEMENT AND OVERLAY 30.48mm (0. 1') OF A. C. PAVEMENT PER DETAIL ON SHEET 7. 36 N/A 3C N/A 3D N/A 3E N/A CONSTRUCTION NOTES e ( STORM DRAIN) CONSTRUCTION NOTES = ( STORM DRA 30 CONSTRUCT IB -INCH RCP (D -LOAD PER PLAN) t CONT .I 31 CONSTRUCT 24 -INCH RCP (D -LOAD PER PLAN) 45 N/A 32 N/A 46 N/A 33 N/A - 34 N/A 35 4$ REMOVE EXISTING INLET PORSARPCw.AURSTDPEPLAN N0T300B251N qg N/A 35 N/A 50 N/A 36 REMOVE INTERFERING PORTION OF EXISTING PIPE 5� NSA 37 N/A 52 N/A 3g CONSTRUCT CONCRETE COLLAR PER A. P. W. A. 53 CONSTRUCT 30 -INCH RCP (D -LOAD PER PLAN) STD. PLAN N0. 380-3 54 CONSTRUCT DESILTING BASIN PER DETAIL ON SHEET 4 39 N/A 55 CONSTRUCT SPECIAL MANHOLE PER DETAIL SHOWN ON 40 N/A DRAWING N0. 3001, SHEET 7. 56 CONSTRUCT STANDARD DRIVEWAY PER FONTANA STD. 41 N/A SIZE OF CONDUIT (INCHES) q2 NSA 43 N/A 44 N/A THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES OR STRUCTURES SHOWN ON THESE PLANS WAS OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS. ADDITIONAL UNDERGROUND FACILITIES MAY EXIST. OR THE LOCATION OF FACILITIES MAY DIFFER FROM THE LOCATIONS SHOWN ON THE PLANS. THE CONTRACTOR SHALL, AT HIS OWN EXPENSE, DETERMINE THE EXACT LOCATION OF ALL SUCH UNDERGROUND UTILITIES PRIOR TO DOING ANY WORK OR TAKING ANY ACTION THAT MAY DAMAGE SUCH FACILITES OR INTERFERE WITH THEIR CONTINUOUS OPERATIONS. UPON LEARNING OF THE EXISTANCE AND LOCATION OF ANY UNDERGROUND FACILITIES NOT SHOWN ACCURATELY ON THESE PLANS OR NOT PROPERLY MARKED BY THE UTILITY OWNER, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE UTILITY OWNER AND THE ENGINEER BY TELEPHONE AND IN WRITING. PLAN N0. 103, EARTHWORK QUANTITIES CUT (C. Y.) FILL (C, Ya) 6,400 765 CONSTRUCTION NOTES. (STREET IMPROVEMENTS) f%INuor 3F N/A 3G N/A O CONSTRUCT 8 INCH CURB AND GUTTER PER CITY OF FONTANA STD. PLAN N0. 1003. 4A CONSTRUCT 8 INCH CURB PER CITY OF FONTANA STD. PLAN N0. 1003. 4B N/A 4C N/A 4D N/A 4E CONSTRUCT ASPHALT CONCRETE DIKE TYPE F PER CALTRANS STD. PLAN A87. 4F N/A 4G CONSTRUCT A, C, DIKE TRANSITION FROM 4'' TO 8'' CURB FACE 4H N/A O5 CONSTRUCT 4 INCH P.C.C. SIDEWALK PER CITY OF FONTANA STD. PLAN N0. 1015. O6 CONSTRUCT GRADED SWALE PER TYPICAL SECTIONS SHEETS 4-6. 6A CONSTRUCT LOCAL DEPRESSION fH=4'> AT CATCH BASIN PER APWA STD. PLAN N0. 31,3-I. 66 CONSTRUCT LOCAL DEPRESSION (H=I') AT CATCH BASIN PER APWA STD. PLAN N0. 313-I. 6C CONSTRUCT GUTTER DEPRESSION (W = 1.2m(41) & D = I00mm(4')) TYPE OS AND OL INLETS ON GRADE PER CALTRANS STD. PLAN D78. O7 N/A O8 N/A 8A N/A 9 N/A 10 ADJUST MANHOLE FRAME AND COVER TO GRADE PER CITY OF FONTANA STD. PLAN N0. 109. IOA ADJUST MANHOLE FRAME AND COVER TO GRADE. (BY OTHERS) QjI ADJUST. WATER VALVE FRAME AND COVER TO GRADE PER CITY OF FONTANA STD. PLAN N0. 130. 12 ADJUST GAS VALVE FRAME AND COVER TO GRADE.' 13 N/A 14 INSTALL STREET LIGHT 22,000 LUMEN PER CITY OF FONTANA STD. PLAN N0. 1016 (BY SCE). 15 RELOCATE EXISTING STREET LIGHT AND/OR POWER POLE. BY SCE) � 16 CONSTRUCT MEDIAN TREATMENT PER CITY OF FONTANA STD. PLAN 145. 16A N/A 17 INSTALL ONE 4 INCH AND ONE 6 INCH SCHEDULE 80 PVC PIPE PER SECTION SHEET 6. 18 _ TO BE RELOCATED. (TYPE AS SHOWN) i8A TO BE RELOCATED. (BY OTHERS) 188 N/A N� 19 CONSTRUCT ACCESS RAMP PER CITY OF FONTANA STD. PLLR N0. 1006. 20 CONSTRUCT 24 -INCH RCP, 2000-D 21 CONSTRUCT (2) PARALLEL 6' DIAMETER HDPE CULVERTS. 22 FONSTRUCTN�PZE-CAST MANHOLE PER CITY OF FONTANA STD. - 0 23 N/A 24 N/A 25 CONSTRUCT MODIFIED CATCH BASIN PER DETAIL ON SHEET 7. 26 REMOVE EXISTING DRAIN INLET. 26 38ANDO1-1 ANDxCONNECTINEWTPAPE.SEAL TOP PER APWA STD. PLAN 26 N/A Z7 CONSTRUCT CONCRETE PER A. P. W. A.SAN 803 28 CONSTRUCT GCP MODIFIED INLET PER DETAIL ON SHEET 7. 29 CONSTRUCT MODIFIED JUNCTION STRUCTURE PER DETAIL ONET_7. SS SEE SIGNING AND STRIPING PLANS. TS SEE TRAFFIC SIGNAL MODIFICATION PLANS � WMT wEANDNLTPERRPLAN APWA STD PLAN N0. 140-2. W7(MF N/A W CT N/A N/A --W�-CC�vI O NOT A PART z w w 0 n :2 w III V) z Q -CD 0 V) C v> 0 in Lo 0 N O / M m O Ln O Q' N C � «-, Lr) +- Cr)