Loading...
HomeMy WebLinkAbout2998-18CITY OF FONTANA GENERAL NOTES I. ADVANCE CONSTRUCTION SIGNING INDICATING DURATION OF PROJECT SHALL BE IN PLACE ONE WEEK PRIOR TO IMPLEMENTING DETOURS. 2. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC RIGHT-OF-WAY WITHIN THE CITY. CALL (909) 350-7610 3. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES DESCRIBED IN THE STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON -METRIC EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER. A. THE CONTRACTOR SHALL NOTIFY THE CITY TRAFFIC SECTION TWO WORKING DAYS PRIOR TO IMPLEMENTING THE TRAFFIC CONTROL PLAN TO ALLOW CITY STAFF TIME TO ADJUST TRAFFIC SIGNAL DETECTION. 5. THE CONTRACTOR SHALL MAINTAIN TWO WAY TRAFFIC AT ALL TIMES UNLESS OTHERWISE APPROVED BY THE CITY TRAFFIC ENGINEER. QUALIFIED FLAGGERS SHALL BE USED WHEN THE ROADWAY IS REDUCED TO A SINGLE LANE OR WHERE TRAFFIC MUST STOP FOR MOVEMENT OF EQUIPMENT. 6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES. 7. THE WORK ZONE SHALL BE ROUTINELY INSPECTED AND MAINTAINED TO ENSURE PROPER VISIBILITY AND OPERATION OF ALL TRAFFIC CONTROL AND ADVANCED TRAFFIC CONTROL DEVICES. 8. ALL EXISTING OR TEMPORARY SIGNS, STRIPING OR PAVEMENT MARKINGS THAT ARE IN CONFLICT AND/OR NO LONGER APP4ICA94E SHALL BE REMOVED, 9. SIGNS SHALL NOT BE PLACED IN EXCESS OF 15 FEET FROM THE EDGE OF THE TRAVELED WAY. PORTABLE SIGN STANDARDS SHALL BE TIED DOWN OR WEIGHTED TO PREVENT TOPPLING. 10. THE EXACT LOCATION OF ALL TRAFFIC CONTROL DEVICES IS SUBJECT TO APPROVAL OF THE CITY TRAFFIC ENGINEER, ADDITIONAL WARNING, CONSTRUCTION SIGNS OR TRAFFIC SAFETY EQUIPMENT MAY BE REQUIRED BY THE CITY TRAFFIC ENGINEER. 11. ALL WORK AREAS SHALL BE CLEARLY IDENTIFIED AND DELINEATED WITH CONES, PORTABLE DELINEATORS AND/OR BARRICADES. ALL CONES SHALL BE A MINIMUM OF 28 INCHES IN HEIGHT. ALL DELINEATORS SHALL BE A MINIMUM OF 36 INCHES IN HEIGHT. 12. ALL SIGNS SHALL BE REFLECTORIZED OR ILLUMINATED. 13. TRAFFIC SIGNS DIMENSIONS, COLOR AND LETTERING SHALL CONFORM TO THE LATEST CALTRANS SIGN SPECIFICATION SHEET. SIGN CODES SHOWN HEREON ARE TO CONFORM TO CAL TRANS SPECIFICATION SHEET CODES. TRAFFIC SIGN SIZE SHALL BE STANDARD UNLESS OTHERWISE SHOWN ON THE PLANS. 14. ALL SIGNS SHALL BE MOUNTED ON GALVANIZED STEEL POSTS, UNLESS OTHERWISE SHOWN ON THE PLANS, PER CITY STANDARD DETAIL 139. 15. ALL FLASHING YELLOW WARNING LIGHTS SHALL BE TYPE 'A' PORTABLE, LENS DIRECTED, ENCLOSED AND MOUNTED AT A MINIMUM HEIGHT OF THREE FEET, MEASURED FROM THE BOTTOM OF THE LENS TO THE UNDERLYING SURFACE. 16. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES. A MINIMUM 12 FOOT LANE SHALL BE MAINTAINED AT ALL TIMES IN THE CLOSURE AREA FOR RESIDENTS AND EMERGENCY VEHICLES. 17. UPON COMPLETION OF CONSTRUCTION. CONTRACTOR SHALL REMOVE TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER, ANS INSTALL SIGNING AND STRIPING PER THE SIGNING AND STRIPING PLAN. 18. CONTRACTOR TO CONTACT TIM RASTEDT AT (909) 350-6649 TWO WORKING DAYS PRIOR TO ANY SIGN INSTALLATION TO ALLOW CITY STAFF TO LOCATE EXISTING UNDERGROUND FACILITIES. NOTE STREET CLOSURE ONLY PERMITED ON WEEKEND AS APPROVED BY CITY ENGINEER. CONSTRUCTION TRAFFIC CONTROL PLAN INSTALLATION NOTES STAGE 3 on SHEET 18 - SCOPE OF WORK �I PAINT STRIPING, MARKING, OR LEGEND AS NOTED. F2] PLACE SIGN AS NOTED. C132 so* C30[ I. PUT INTO PLACE THE TRAFFIC CONTROL AND DETOUR SIGNING PER THIS SHEET. 2. PROPOSED STRIPING UP TO STA. 86+50 ON S0. HIGHLAND AV. SHALL BE MAINTAINED DURING THIS STAGE TO REFLECT THE SIGNING AND STRIPING PLANS. 3. REMOVE ANY EXISTING CONFLICTING STRIPING AND INSTALL TEMPORARY STRIPING. 4. INSTALL STORM DRAIN PER STREET IMPROVEMENT PLAN. 4" SOLID WHITE(TEMP) I AVE • HIGHLAND C302 C30 2 �{ -- o o� -, C30 2 C20(LT) I 2 I C30L2 550' 1 550' SIERRA AVE. MATCH.LINE STA 101(50 SEE S 12" WHITE LIMN LINE (TEMP) u C301 2 4" SOLID WHITE(TEMP)L I I R � N wow ONE DETAIL 211 1 12" WHITE LIMIT LINE (TEMP) IEET- 19 D NOTE � �, / � '� z c30 PEDESTRIAN TRAFFIC SHALL C30 2 22• BE MAINTAINED DURING 16' CONSTRUCTION AT ALL TIMES. MATCH LINE STA 98+50 SEE SHEET 19 SIERRA AVE. NOTE LEFT TURN POCKETS AND PHASING SHALL BE RESTORED DURING THIS STAGE AFTER THE STORM DRAIN INSTALLATION. 4" SOLID YELLOW(TEMP) I I NOTE : TRAFFIC CONTROL ON THESE PLANS ARE FOR CONCEPT ONLY, LANE LOCATIONS MAY HAVE TO BE MODIFIED PER CONTRACTORS SCHEDULE AND CONSTRUCTION METHODS. CONTRACTOR SHALL SUBMIT DETAILED TRAFFIC CONTROL PLANS FOR APPROVAL OF THE CITY TRAFFIC ENGINEER TEN (10) WORKING DAYS IN ADVANCE OF ANY PROPOSED MODIFICATION OF THESE PLANS OR CONSTRUCTION STAGING. NOTE e EXISTING TRAFFIC SIGNAL OPERATION SHALL BE MAINTAINED TO THE SATISFACTION OF THE CITY ENGINEER AT ALL TIMES. VEHICLE HEADS AND CAMERA PLACEMENT OR ALIGNMENT WITH RESPECT TO LANES. 4" SOLID WHITE(TEMP) I I 1 1 12" WHITE LIMIT LINE (TEMP) NOTE INTERSECTION PAVEMENT TO BE CONSTRUCTED ON WEEKEND AS APPROVED BY CITY ENGINEER. -- C301 2 l�S�l---------� a 1--------._:!-!._.------ 1, -'p•qeWE�'♦. ♦ ♦� �' A V ^ • ^ ✓ V - v "�V'+ V 1/ V V V V V V al f 01 NA III INA "NOW, MA MA IVA klWA all al IN M kla MA IMANIR lig �����a��r�����r�� WE ig � - ----- .•moi 550' TAPER (D M FLASHING ARROW BOARD 0 DELINEATOR i+ TYPE II BARRICADE iIF TYPE III BARRICADE N = � U WORK AREA Q DIRECTION OF TRAFFIC FLOW ~ W V) W � zm W U w �Ln SCALE: 1" - 40' Q R � N wow ONE DETAIL 211 1 12" WHITE LIMIT LINE (TEMP) IEET- 19 D NOTE � �, / � '� z c30 PEDESTRIAN TRAFFIC SHALL C30 2 22• BE MAINTAINED DURING 16' CONSTRUCTION AT ALL TIMES. MATCH LINE STA 98+50 SEE SHEET 19 SIERRA AVE. NOTE LEFT TURN POCKETS AND PHASING SHALL BE RESTORED DURING THIS STAGE AFTER THE STORM DRAIN INSTALLATION. 4" SOLID YELLOW(TEMP) I I NOTE : TRAFFIC CONTROL ON THESE PLANS ARE FOR CONCEPT ONLY, LANE LOCATIONS MAY HAVE TO BE MODIFIED PER CONTRACTORS SCHEDULE AND CONSTRUCTION METHODS. CONTRACTOR SHALL SUBMIT DETAILED TRAFFIC CONTROL PLANS FOR APPROVAL OF THE CITY TRAFFIC ENGINEER TEN (10) WORKING DAYS IN ADVANCE OF ANY PROPOSED MODIFICATION OF THESE PLANS OR CONSTRUCTION STAGING. NOTE e EXISTING TRAFFIC SIGNAL OPERATION SHALL BE MAINTAINED TO THE SATISFACTION OF THE CITY ENGINEER AT ALL TIMES. VEHICLE HEADS AND CAMERA PLACEMENT OR ALIGNMENT WITH RESPECT TO LANES. 4" SOLID WHITE(TEMP) I I 1 1 12" WHITE LIMIT LINE (TEMP) NOTE INTERSECTION PAVEMENT TO BE CONSTRUCTED ON WEEKEND AS APPROVED BY CITY ENGINEER. -- C301 2 l�S�l---------� a 1--------._:!-!._.------ 1, -'p•qeWE�'♦. ♦ ♦� �' A V ^ • ^ ✓ V - v "�V'+ V 1/ V V V V V V al f 01 NA III INA "NOW, MA MA IVA klWA all al IN M kla MA IMANIR lig �����a��r�����r�� WE ig � - ----- .•moi 550' TAPER 1 L TEMPORARY CRASH CUSHION PER CALTRANS STD PLAN (2002) IA -ARRAY TU14 lk4 sFF ��NF eFST V-00 761, 2 1 C30 C30 Mi f 0000 S goo now I I DETAIL 21 C30 2 r ,I 4" SOLID WHITE(TEMP) I qT�y164. SFF q �j�F a Bpi STq �J O PERMIT NO.08-03-N-MC-0483 W I 0 z 0 U U LL- III .L III z 0 N Ne Of 0 W z Li Q D z Q z 0 I— 0 U) 0 06 knM N 0 M w a in 0 U U 1- 00 0 M z LEGEND M FLASHING ARROW BOARD • DELINEATOR i+ TYPE II BARRICADE iIF TYPE III BARRICADE -{ FLAG TREE LANE CLOSURE WORK AREA --P- DIRECTION OF TRAFFIC FLOW 1 L TEMPORARY CRASH CUSHION PER CALTRANS STD PLAN (2002) IA -ARRAY TU14 lk4 sFF ��NF eFST V-00 761, 2 1 C30 C30 Mi f 0000 S goo now I I DETAIL 21 C30 2 r ,I 4" SOLID WHITE(TEMP) I qT�y164. SFF q �j�F a Bpi STq �J O PERMIT NO.08-03-N-MC-0483 W I 0 z 0 U U LL- III .L III z 0 N Ne Of 0 W z Li Q D z Q z 0 I— 0 U) 0 06 knM N 0 M w a in 0 U U 1- 00 0 M z