Loading...
HomeMy WebLinkAbout2998-15CITY OF FONTANA GENERAL NOTES I. ADVANCE CONSTRUCTION SIGNING INDICATING DURATION OF PROJECT SHALL BE IN PLACE ONE WEEK PRIOR TO IMPLEMENTING DETOURS. 2. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK. / INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC RIGHT-OF-WAY WITHIN THE CITY. CALL (909) 350-7610 3. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES DESCRIBED IN THE STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON -METRIC EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER. A. THE CONTRACTOR SHALL NOTIFY THE CITY TRAFFIC SECTION TWO WORKING DAYS PRIOR TO IMPLEMENTING THE TRAFFIC CONTROL PLAN TO ALLOW CITY STAFF TIME TO ADJUST TRAFFIC SIGNAL DETECTION. 5. THE CONTRACTOR SHALL MAINTAIN TWO WAY TRAFFIC AT ALL TIMES UNLESS OTHERWISE APPROVED BY THE CITY TRAFFIC ENGINEER. QUALIFIED FLAGGERS SHALL BE USED WHEN THE ROADWAY IS REDUCED TO A SINGLE LANE OR WHERE TRAFFIC MUST STOP FOR MOVEMENT OF EQUIPMENT. 6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES. 7. THE WORK ZONE SHALL BE ROUTINELY INSPECTED AND MAINTAINED TO ENSURE PROPER VISIBILITY AND OPERATION OF ALL TRAFFIC CONTROL AND ADVANCED TRAFFIC CONTROL DEVICES. 8. ALL EXISTING OR TEMPORARY SIGNS, STRIPING OR PAVEMENT MARKINGS THAT ARE IN CONFLICT AND/OR NO LONGER APPLICABLE SHALL BE REMOVED. 9. SIGNS SHALL NOT BE PLACED IN EXCESS OF 15 FEET FROM THE EDGE OF THE TRAVELED WAY. PORTABLE SIGN STANDARDS SHALL BE TIED DOWN OR WEIGHTED TO PREVENT TOPPLING. 10. THE EXACT LOCATION OF ALL TRAFFIC CONTROL DEVICES IS SUBJECT TO APPROVAL OF THE CITY TRAFFIC ENGINEER, ADDITIONAL WARNING, CONSTRUCTION SIGNS OR TRAFFIC SAFETY EQUIPMENT MAY BE REQUIRED -BY THE CITY TRAFFIC ENGINEER. 11. ALL WORK AREAS SHALL BE CLEARLY IDENTIFIED AND DELINEATED WITH CONES, PORTABLE DELINEATORS AND/OR BARRICADES. ALL CONES SHALL BE A MINIMUM OF 28 INCHES IN HEIGHT. ALL DELINEATORS SHALL BE A MINIMUM OF 36 INCHES IN HEIGHT. 12. ALL SIGNS SHALL BE REFLECTORIZED OR ILLUMINATED. 13. TRAFFIC SIGNS DIMENSIONS, COLOR AND LETTERING SHALL CONFORM TO THE LATEST CALTRANS SIGN SPECIFICATION SHEET. SIGN CODES SHOWN HEREON ARE TO CONFORM TO CAL TRANS SPECIFICATION SHEET CODES. TRAFFIC SIGN SIZE SHALL BE STANDARD UNLESS OTHERWISE SHOWN ON THE PLANS. 14. ALL SIGNS SHALL BE MOUNTED ON GALVANIZED STEEL POSTS, UNLESS OTHERWISE SHOWN ON THE PLANS, PER CITY STANDARD DETAIL 139. 15. ALL FLASHING YELLOW WARNING LIGHTS SHALL BE TYPE 'A' PORTABLE, LENS DIRECTED, ENCLOSED AND MOUNTED AT A MINIMUM HEIGHT OF THREE FEET, MEASURED FROM THE BOTTOM OF THE LENS TO THE UNDERLYING SURFACE. 16. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES. A MINIMUM 12 FOOT LANE SHALL BE MAINTAINED AT ALL TIMES IN THE CLOSURE AREA FOR RESIDENTS AND EMERGENCY VEHICLES. 17. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL REMOVE TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER, ANS INSTALL SIGNING AND STRIPING PER THE SIGNING AND STRIPING PLAN. 18. CONTRACTOR TO CONTACT TIM RASTEDT AT (909) 350-6649 TWO WORKING DAYS PRIOR TO ANY SIGN INSTALLATION TO ALLOW CITY STAFF TO LOCATE EXISTING UNDERGROUND FACILITIES. NOTE STREET CLOSURE ONLY PERMITED ON WEEKEND AS APPROVED BY CITY ENGINEER. CONSTRUCTION TRAFFIC CONTROL PLAN INSTALLATION NOTES F-1 PAINT STRIPING, MARKING, OR LEGEND AS NOTED. F PLACE SIGN AS NOTED. LEGEND M FLASHING ARROW BOARD • DELINEATOR ++ TYPE If BARRICADE 4F TYPE III BARRICADE —� FLAG TREE LANE CLOSURE WORK AREA —Om- DIRECTION OF TRAFFIC FLOW � K -RAIL TEMPORARY CRASH CUSHION PER CALTRANS STD PLAN TIA-ARRAY TU14 0 A F Ll IN E 0 10 12 2 0211 ff!.A Mi 1 1 12" WHITE LIMIT LINEII S O • C2. CS (LT)[ 2 m LEE MOMM 0 � ..moi.. � • �I o ,/_i C2, TYPE N-51 I NOTE PEDESTRIAN TRAFFIC SHALL BE MAINTAINED DURING CONSTRUCTION AT ALL TIMES. NOTE LEFT TURN POCKETS AND PHASING SHALL BE RESTORED DURING THIS STAGE AFTER THE STORM DRAIN INSTALLATION. DETAIL 2111 HU'RIR31 C191 2 CI [fl— 05 (LT)[El FOOTKLL 50. C7�I DETOUR LEGEND F SIGN AND POST REM STREET CLOSURE BASELINE NOTE me FWY C5(LT) C5(BOTH) C5(BOTH) tn -v- q C5(RT) C5(RT) -�- tn C5(LT)low F DETOUR PLAN N.T.S. EXISTING TRAFFIC SIGNAL OPERATION SHALL BE MAINTAINED TO THE SATISFACTION OF THE CITY ENGINEER AT ALL TIMES. VEHICLE HEADS AND CAMERA PLACEMENT OR ALIGNMENT WITH RESPECT TO LANES. I I DETAIL 21 11 12" WHITE LIMIT LINE TYPE IV(R)ARROW (TEMP) I I TYPE IV(L)ARROW (TEMP) HID "1%%" DETAIL 38A (TEMP) —�' `sem '.� got' ✓� 40' TYP. INA OR" ago MATCH LINE- STA 98(50 SEE SHEET, 13 SIERRA AVE. C I KI ( C301 2 C19 4 Cl C5tLT ..L C5(RT) AV. STAGE 2 — SHEEN 15 — SCOPE OF WORK I. PUT INTO PLACE THE TRAFFIC CONTROL AND DETOUR SIGNING PER THIS SHEET. C 2. REMOVE ANY EXISTING CONFLICTING STRIPING AND INSTALL TEMPORARY STRIPING. 3. ENERGIZE PROPOSED TRAFFIC SIGNAL REMOVE EXISTING SIGNAL EQUIPMENT. 4. INSTALL STORM DRAIN PER PLAN. / S 5. INSTALL CURB AND GUTTER 6. INSTALL REMAINING CONDUIT AND WIRE FOR PROPOSED TRAFFIC SIGNAL PLAN. 7. SAWCUT EXISTING AC PAVING PER STREET IMPROVEMENT PLAN. � NOTE a TRAFFIC CONTROL ON THESE PLANS ARE FOR CONCEPT ONLY, LANE LOCATIONS MAY HAVE TO BE MODIFIED PER CONTRACTORS SCHEDULE AND CONSTRUCTION METHODS. CONTRACTOR SHALL SUBMIT DETAILED TRAFFIC CONTROL PLANS FOR APPROVAL OF THE CITY TRAFFIC ENGINEER TEN(10) WORKING DAYS -IN ADVANCE OF ANY PROPOSED MODIFICATION OF THESE PLANS OR CONSTRUCTION STAGING. 4" SOLID WHITE (TEMP) I I J TYPE IV(R)ARROW (TEMP) TYPE IV(L)ARROW (TEMP) C30I 2 C301 2 lool i � f rr' � AOOO 61 00 4' SOLID WHITE (TEMP) F-114" SOLI D WHITE (TEMP) SFFy lGy� a i � �e� FSTq I Q PERMIT NO, 08 -03 -N -MC -0483 C13 M Cl C5(RT)O C19 C5(LT) a a W aW w a • a � > a W LOS CEDROS AVE. W a V DETOUR LEGEND F SIGN AND POST REM STREET CLOSURE BASELINE NOTE me FWY C5(LT) C5(BOTH) C5(BOTH) tn -v- q C5(RT) C5(RT) -�- tn C5(LT)low F DETOUR PLAN N.T.S. EXISTING TRAFFIC SIGNAL OPERATION SHALL BE MAINTAINED TO THE SATISFACTION OF THE CITY ENGINEER AT ALL TIMES. VEHICLE HEADS AND CAMERA PLACEMENT OR ALIGNMENT WITH RESPECT TO LANES. I I DETAIL 21 11 12" WHITE LIMIT LINE TYPE IV(R)ARROW (TEMP) I I TYPE IV(L)ARROW (TEMP) HID "1%%" DETAIL 38A (TEMP) —�' `sem '.� got' ✓� 40' TYP. INA OR" ago MATCH LINE- STA 98(50 SEE SHEET, 13 SIERRA AVE. C I KI ( C301 2 C19 4 Cl C5tLT ..L C5(RT) AV. STAGE 2 — SHEEN 15 — SCOPE OF WORK I. PUT INTO PLACE THE TRAFFIC CONTROL AND DETOUR SIGNING PER THIS SHEET. C 2. REMOVE ANY EXISTING CONFLICTING STRIPING AND INSTALL TEMPORARY STRIPING. 3. ENERGIZE PROPOSED TRAFFIC SIGNAL REMOVE EXISTING SIGNAL EQUIPMENT. 4. INSTALL STORM DRAIN PER PLAN. / S 5. INSTALL CURB AND GUTTER 6. INSTALL REMAINING CONDUIT AND WIRE FOR PROPOSED TRAFFIC SIGNAL PLAN. 7. SAWCUT EXISTING AC PAVING PER STREET IMPROVEMENT PLAN. � NOTE a TRAFFIC CONTROL ON THESE PLANS ARE FOR CONCEPT ONLY, LANE LOCATIONS MAY HAVE TO BE MODIFIED PER CONTRACTORS SCHEDULE AND CONSTRUCTION METHODS. CONTRACTOR SHALL SUBMIT DETAILED TRAFFIC CONTROL PLANS FOR APPROVAL OF THE CITY TRAFFIC ENGINEER TEN(10) WORKING DAYS -IN ADVANCE OF ANY PROPOSED MODIFICATION OF THESE PLANS OR CONSTRUCTION STAGING. 4" SOLID WHITE (TEMP) I I J TYPE IV(R)ARROW (TEMP) TYPE IV(L)ARROW (TEMP) C30I 2 C301 2 lool i � f rr' � AOOO 61 00 4' SOLID WHITE (TEMP) F-114" SOLI D WHITE (TEMP) SFFy lGy� a i � �e� FSTq I Q PERMIT NO, 08 -03 -N -MC -0483 C13