1. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF
FONTANA STANDARD PLANS, THE CONTRACT PROVISIONS AND THE
STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (`GREEN
BOOK"). ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL BE THE
LATEST EDITION UNLESS OTHERWISE NOTED.
2. WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT
DOCUMENTS THAT CAN NOT BE RESOLVED BY REFERENCE TO PRECEDENCE
PROVISIONS IN THE "GREEN BOOK". THE CONTRACTOR SHALL IMMEDIATELY
REPORT SAID CONFLICT THE CITY ENGINEER FOR RESOLUTION.
3. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE
CITY ENGINEER.
4. ADVANCE CONSTRUCTION SIGNING INDICATING DURATION OF PROJECT
SHALL BE IN PLACE ONE WEEK PRIOR TO IMPLEMENTING DETOURS.
5. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF
FONTANA COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION
PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL
BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF
ANY WORK IN PUBLIC RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL
(909) 350-7610.
6. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES,
METHODS AND PROCEDURES DESCRIBED IN THE STATE OF CALIFORNIA
MANUAL OF TRAFFIC CONTROLS, LATEST NON -METRIC EDITION UNLESS
OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER.
7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN
BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL
TIMES.
8. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION
OR TRENCH WORK FOR TRENCHES 5 FEET OR GREATER IN DEPTH FROM
THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY.
9. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5)
FEET IN DEPTH SHALL BE GUARDED BY SHORING, SLOPING OF THE
GROUND OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS
OF THE DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA.
TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN
THE POTENTIAL EXISTS FOR GROUND MOVEMENT.
10. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC
RIGHT OF WAY WITHOUT OBTAINING A SEPARATE PERMIT FOR THAT
PURPOSE
11. THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM
AVAILABLE INFORMATION, HOWEVER, IT SHALL BE THE RESPONSIBILITY OF
THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND
THE ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER
PRECAUTION TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL
CONTACT UNDERGROUND SERVICE ALERT AT 1-800-227-2600 TWO
WORKING DAYS BEFORE EXCAVATION.
12. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY
COMPANIES INCLUDING, BUT NOT LIMITED TO, GAS, TELEPHONE, ELECTRIC,
CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER,
RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRANS.
ALL UTILITY COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE
PRIOR TO WORK AROUND THEIR FACILITIES.
13. THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR
WATER MAIN VALVES WITHOUT APPROPRIATE AGENCY AUTHORIZATION.
CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY
FOR VALVE OPERATION AND WATER REQUIREMENTS.
14. STATIONING REFERS TO THE CENTERLINE OF STORM DRAIN EXCEPT
WHERE OTHERWISE NOTED.
15. ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE
ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK TO
THE PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE
PRESERVATION OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING
DURING CONSTRUCTION.
16. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS,
MONUMENT TIES OR BENCHMARKS WITHOUT PRIOR NOTIFICATION TO THE
CITY ENGINEER.
17. REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL., INCLUDING
SURVEY MONUMENTS, MONUMENT TIES AND BENCHMARKS, SHALL BE DONE
BY A REGISTERED CML ENGINEER OR LICENSED LAND SURVEYOR.
SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS
CONSTRUCTION SHALL BE REPLACED. THE CONTRACTOR SHALL NOTIFY
THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO
MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE
MONUMENT.
18. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS
AND BUSINESSES AT ALL TIMES, A MINIMUM 12 FOOT LANE SHALL BE
MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDENTS
AND EMERGENCY VEHICLES.
19. THE CONTRACTORS SHALL PROVIDE AND MAINTAIN AN EFFECTIVE
MEANS OF DUST CONTROL, INCLUDING ADEQUATE WATERING, AT ALL TIMES.
20. THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL., MUD,
SILT OR DEBRIS TO BE DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY
ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT PRIOR
WRITTEN APPROVAL.
21. NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL
OF THE CITY INSPECTOR.
22. A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION.
FAILURE TO OBTAIN THE REQUIRED DENSITY SHALL REQUIRE RE -WORKING
OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED DENSITY IS
OBTAINED.
23. CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES
FROM UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF THE
SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY NON-ERODEABLE
SWALES ENTERING OR LEAVING IMPROVEMENTS.
TOLL FREE 1-800-227-2600
A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT
24. ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE,
COLOR AND FINISH TO MATCH EXISTING CONCRETE
25. NO OPEN TRENCH SHALL BE ALLOWED AT THE END OF THE DAY
WITHOUT PRIOR APPROVAL OF THE CITY ENGINEER.
26. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL EXPOSE EXISTING
FACILITIES, AND VERIFY ELEVATION AND LOCATION OF CONNECTIONS. CITY
APPROVAL OF CONNECTIONS TO EXISTING FACILITIES DOES NOT IMPLY
CORRECTNESS OF ELEVATIONS OR LOCATIONS SHOWN ON THE PLANS.
27. IF EXISTING UTILITIES OR ANY OTHER FACILITIES CONFLICT WITH THE
PROPOSED IMPROVEMENTS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER
AND ALL AFFECTED AGENCIES IMMEDIATELY.
28. NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING
STEEL HAVE BEEN PLACED, INSPECTED AND APPROVED.
29. ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND
APPROVED PRIOR TO PAVING OF STREETS.
30. APPROVED SOIL STERILANT 1S REQUIRED UNDER ALL NEW ASPHALT
PAVEMENT PRIOR TO PLACEMENT.
31. ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL
BE RAISED TO FINISHED GRADE BY THE PAVING CONTRACTOR UPON
COMPLETION OF PAVING.
32. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE
ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC CONTROL
DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER.
33. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO
THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS TO
THE CITY ENGINEER.
34. MINIMUM D -LOAD FOR ALL RCP IS 1350.
CITY of FONTANA. UTILITY NOTIFICATION LIST
CITY OF FONTANA
S.B.C. INC.
8353 SIERRA AVENUE
3939 E. CORONADO STREET
FONTANA, CA 92335
ANAHEIM, CA 92807
(909) 350-6632
(714) 666-5500
SO. CALIF. GAS COMPANY
UNDERGROUND SERVICE ALERT
1981 W. LUGONIA AVENUE
(800) 422-4133
REDLANDS, CA 92374
12" MAX
(909) 335-7547
PACIFIC BELL CO.
EMERGENCIES: (800) 427-2200
3939 E. CORONADO STREET
P.U.E.
ANAHEIM, CA 92807
SO. CALIF. EDISON COMPANY
(714) 666-5467
300 N. PEPPER AVENUE
-- -_ . ; _V^ ::- - , ` o
RIALTO, CA 92376
VERIZON (TELEPHONE)
909 820-5598 - UNDERGROUND
1400 E PHILIPS BLVD.
909 875-5100 - TRANSMISSION
ONTARIO, CA 91766
213 637-1233 - PIPELINES
(800) 483-4000
909 357-6505 - DISTRIBUTION
TRACT BOUNDARY
FONTANA WATER COMPANY
ADELPHIA
8440 NUEVO AVENUE
1500 S. AUTO CENTER DRIVE
FONTANA CA 92235
ONTARIO, CA 91761
(909) 822-2201
(714) 481-1115
FAX: (909) 823-5046
CITY OF FONTANA
WALNUT AVENUE C.I.P.
PHASE IIA
STORM DRAIN IMPROVEMENT PLANS
g
U
BASELINE AV
Y
8
FONTANA
VICINITY MAP
auWwcarAwsn NTSA IR►n Ir
HAIN WAY WALNUT AVENUE AIAMIA WALNUT AVENUE TAHOE WAY
AVENUE
TOP OF STRUCTURAL
PAVEMENT SUBGRADE
PRIVATE ENgNEOtS NOTICE TO CONTRACTOR.-
THE
ONTRACTOR:THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES AND OR STRUCTURES
SHOWN ON THESE PLANS WERE OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS.
THESE LOCATIONS ARE APPROXIMATE AND SHALL BE CONFIRMED BY THE CONTRACTOR,
SO THAT ANY NECESSARY ADJUSTMENT CAN BE MADE IN ALIGNMENT AND/OR GRADE
OF THE PROPOSED IMPROVEMENT. THE CONTRACTOR IS REQUIRED TO TAKE DUE
PRECAUTIONARY MEASURES TO PROTECT ANY UTILITY LINES SHOWN AND ANY OTHER
LINES NOT ON RECORD OR NOT SHOWN ON THESE PLANS.
CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED
CONSTRUCTION PRACTICES, HE WILL BE REQUIRED TO ASSUME
SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE
OF CONSTRUCTION OF THE PROJECT, INCLUDING THE SAFETY OF ALL PERSONS AND
PROPERTY. THIS REQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLY AND
NOT BE LIMITED TO NORMAL WORKING HOURS. CONSTRUCTION CONTRACTOR FURTHER
AGREES TO DEFEND, INDEMNIFY AND HOLD DESIGN PROFESSIONAL HARMLESS FROM ANY
AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF
WORK ON THIS PROJECT, EXCEPTING LIABILITY ARISING FROM THE SOLE NEGLIGENCE
OF THE DESIGN PROFESSIONAL.
UNAUTHORIZED CHANGES AND USES:
THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR OR LIABLE
FOR, UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS. ALL CHANGES TO THE
PLANS MUST BE IN WRITING AND MUST BE APPROVED BY THE PREPARER OF THESE PLANS.
MIN EMIMMMIMMIM
MIN
HIM
MMMM
MIN MIN
MIN
MIN EMINSIMMINSIN
MIN I MIN MINSIN
Z 3
STORM DRAIN
PIPE .- m m
TRENCH DETAIL
NIS
NOTES:
1. TRENCH WIDTH SHALL BE CONTROLLED
TO TOP OF PIPE ZONE
2. TRENCH DEPTHS OF GREATER THAN 5'
SHALL HAVE ADEQUATE SHORING
3. CLASS It AGGREGATE BASE ALL TRENCHES
LESS THAN 100 FEET IN LENGTH
SHOULD CONSTRUCTION OF REQUIRED
IMPROVEMENTS NOT COMMENCE WITHIN
TWO YEARS OF THE DATE OF APPROVAL
SHOWN HEREON AND CARRIED FORTH IN A
DILIGENT MANNER, THE CITY EN(INEER MAY
REQUIRE REVISIONS TO THE PLANS TO
BRING THEM INTO CONFORMANCE WITH
CONDITIONS AND STANDARDS IN EFFECT
3" MAX. SIZE
NATIVE SOIL
COMPACTED 95%
TABLE: 200-1.2(A)
SIEVE SIZE
\ N
1 112
-=
1"
- 90% COMPACTED
3/4"
NATIVE BACKFILL =
PROVIDE ADEQUATE SHORING
6 MAX SIZE
3/8"
6" MIN
NO.4
12" MAX
GRANULAR BEDDING FROM SELECTED
0-5
TRENCH SIDE MATERIAL (1" MAX SIZE)
B
P.U.E.
�z
GRANULAR BEDDING FROM SELECTED
:;, ^
TRENCH SIDE MATERIAL FOR PIPE 10
-- -_ . ; _V^ ::- - , ` o
OR GREATER IN DEPTH USE 1/2
LINEAL FEET
CRUSHED STONE BEDDING
-
CENTERLINE
■ ■
TRACT BOUNDARY
PRIVATE ENgNEOtS NOTICE TO CONTRACTOR.-
THE
ONTRACTOR:THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES AND OR STRUCTURES
SHOWN ON THESE PLANS WERE OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS.
THESE LOCATIONS ARE APPROXIMATE AND SHALL BE CONFIRMED BY THE CONTRACTOR,
SO THAT ANY NECESSARY ADJUSTMENT CAN BE MADE IN ALIGNMENT AND/OR GRADE
OF THE PROPOSED IMPROVEMENT. THE CONTRACTOR IS REQUIRED TO TAKE DUE
PRECAUTIONARY MEASURES TO PROTECT ANY UTILITY LINES SHOWN AND ANY OTHER
LINES NOT ON RECORD OR NOT SHOWN ON THESE PLANS.
CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED
CONSTRUCTION PRACTICES, HE WILL BE REQUIRED TO ASSUME
SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE
OF CONSTRUCTION OF THE PROJECT, INCLUDING THE SAFETY OF ALL PERSONS AND
PROPERTY. THIS REQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLY AND
NOT BE LIMITED TO NORMAL WORKING HOURS. CONSTRUCTION CONTRACTOR FURTHER
AGREES TO DEFEND, INDEMNIFY AND HOLD DESIGN PROFESSIONAL HARMLESS FROM ANY
AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF
WORK ON THIS PROJECT, EXCEPTING LIABILITY ARISING FROM THE SOLE NEGLIGENCE
OF THE DESIGN PROFESSIONAL.
UNAUTHORIZED CHANGES AND USES:
THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR OR LIABLE
FOR, UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS. ALL CHANGES TO THE
PLANS MUST BE IN WRITING AND MUST BE APPROVED BY THE PREPARER OF THESE PLANS.
MIN EMIMMMIMMIM
MIN
HIM
MMMM
MIN MIN
MIN
MIN EMINSIMMINSIN
MIN I MIN MINSIN
Z 3
STORM DRAIN
PIPE .- m m
TRENCH DETAIL
NIS
NOTES:
1. TRENCH WIDTH SHALL BE CONTROLLED
TO TOP OF PIPE ZONE
2. TRENCH DEPTHS OF GREATER THAN 5'
SHALL HAVE ADEQUATE SHORING
3. CLASS It AGGREGATE BASE ALL TRENCHES
LESS THAN 100 FEET IN LENGTH
SHOULD CONSTRUCTION OF REQUIRED
IMPROVEMENTS NOT COMMENCE WITHIN
TWO YEARS OF THE DATE OF APPROVAL
SHOWN HEREON AND CARRIED FORTH IN A
DILIGENT MANNER, THE CITY EN(INEER MAY
REQUIRE REVISIONS TO THE PLANS TO
BRING THEM INTO CONFORMANCE WITH
CONDITIONS AND STANDARDS IN EFFECT
3" MAX. SIZE
NATIVE SOIL
COMPACTED 95%
TABLE: 200-1.2(A)
SIEVE SIZE
PERCENTAGE
PASSING SIEVES
1 112
-
1"
-
3/4"
100
1 2
90-100
3/8"
20-60
NO.4
0-15
NO.8
0-5
ASTM C 131
TEST GRADIN
B
NOTE:
COMPACTION SHALL BE 90% IN ALL ZONES
UNLESS OTHERWISE SPECIFIED. TRENCH STABILITY
SHALL CONFORM TO CAL -OSHA REQUIREMENTS
BASIS of BEARINGS:
THE NORTH LINE OF THE SOUTHEAST QUARTER OF SECTION 36,
T1N, R6W, S.B.M. AS SHOWN ON TRACT 16568,
MB 300/59-62, BEING N 89'59'12"E
TRENCH REPAIR NOTES:
1. ALL EXCAVATION WITHIN THE CITY OF FONTANA RIGHT OF WAY
REQUIRES AN EXCAVATION PERMIT FROM THE PUBLIC WORKS
DEPARTMENT.
2. UNDERGROUND SERVICE ALERT SHALL BE NOTIFIED 2 WORKING DAYS
PRIOR TO START OF WORK. (800) 227-2600.
3. ALL EXCAVATIONS SHALL BE MADE, PROTECTED AND SUPPORTED AS
REQUIRED FOR SAFETY AND IN THE MANNER APPROVED BY THE
CALIFORNIA DIVISION OF INDUSTRIAL SAFETY.
4. COMPACTION OF BACKFILL SHALL BE CERTIFIED BY THE
GEOTECHNICAL TECHNICIAN ON SITE AND APPROVED BY THE PUBLIC
WORKS INSPECTOR PRIOR TO PLACEMENT OF THE PAVEMENT.
5. PERMANENT PAVEMENT SHALL BE PLACED WITHIN 5 DAYS OF
EXCAVATION. A MINIMUM OF TWO (2' INCHES OF TEMPORARY
ASPHALT SHALL BE PLACED WITHIN THE TRENCH AREA UNTIL
PERMANENT REPAIR IS COMPLETED. THE TEMPORARY PAVEMENT
SHALL BE PLACED AND COMPACTED IN SUCH A MANNER AS TO
PROVIDE A SAFE AND SMOOTH TRAVELED SURFACE. THE
CONTRACTOR SHALL MAINTAIN THE TEMPORARY PAVEMENT IN A SAFE
AND SMOOTH CONDITION UNTIL PERMANENT PAVING IS IN PLACE.
6. PRIOR TO PLACING PERMANENT PAVING, EXISTING PAVEMENT SHALL
BE SAWCUT IN A CLEAN STRAIGHT LINE. PAVEMENT ADJACENT TO
THE TRENCH THAT IS CRACKED SHALL BE REMOVED AND REPLACED.
7. ALL EDGES OF EXISTING PAVEMENT BEING JOINED OR OVERLAYED
SHALL RECEIVE TACK COAT OF ASPHALT EMULSION.
8. TRENCHES OF 300 FEET OR MORE SHALL BE PAVED WITH A SELF
PROPELLED PAVING MACHINE.
9. ANY STREET PAVED OR RESURFACED IN THE PREVIOUS 36 MONTHS
WHERE THE TRENCH EXTENDS FROM THE CURB MORE THAN 7 FEET
OR IS IN A TRAVELED LANE WILL REQUIRE AN OVERLAY 25 FEET IN
BOTH DIRECTIONS FROM THE CENTERLINE OF THE TRENCH.
10. IF TRENCH FAILURE SHOULD OCCUR, THE CONTRACTOR WILL BE
NOTIFIED OF SUCH DEFICIENCIES AND REQUIRED TO REMOVE,
REPLACE OR REMEDY THE FAILURE. UPON FAILURE OF THE
CONTRACTOR TO PROMPTLY COMPLY AND UNDER ORDER OF THE CITY
ENGINEER, TRENCH FAILURES MAY BE REPAIRED AT THE
CONTRACTOR'S EXPENSE.
11. BEDDING MATERIAL SHALL BE SAND, GRAVEL, CRUSHED AGGREGATE,
OR SELECT NATIVE MATERIAL HAVING A SAND EQUIVALENT OF NOT
LESS THAN 30 AND A PERCENT COMPOSITION BY WEIGHT
CONFORMING TO TABLE 200-1.2 (A)
ORIGINAL BENCHMARK
PREPARED FOR: CITY OF FONTANA BM -361
R.R. SPIKE IN PP NO. 1536697E AT THE SW CORNER
CITY OF FONTANA OF BASELINE AVENUE AND SULTANA AVENUE.
8353 SIERRA AVENUE ELEVATION: 1365.01, SINCE DESTROYED
FONTANA, CA 92335 SITE BENCHMARK
(909) 350-7610 SW CORNER, SEC. 31, TAN., R.5W., S.BM.-2" I.P.
FAX (909) 350-6618 WITH BRASS CAP, C.S.M. AT THE INTERSECTION OF
BASELINE AVENUE AND CITRUS AVENUE.
HWAliM 1395,16
w
Ea
Q
3
Vi
EXISTING AC
1" MIN
6" MAX. SIZE SELECT
NATIVE BEDDING
COMPACTED TO 907.
Prepared By:
ALLARD ENGINEERING
Civil Engineering - Land Surveying - Land Planning
8253 Sierra Avenue
Fontana, California 92335
() 356-1615 Fax (909) 356-1795
L_David S. Hammer, A. . . 43976 Date
(expires 6/30/2007)
IS,
ME[1=1
N
AR 4000 C1
AR 4000 02
3" MAX. SIZE SELECT
NATIVE BEDDING
COMPACTED TO 95%
r N 0-0
Z 0"0.
•-- ' 8
a
w
Q
3
EXISTING AC
1 " MIN
COMPACTED NATIVE
OR BASE
MAX. SIZE SELECT
Q_c
NATIVE BEDDING
COMPACTED TO 90%.
'��
6! MIN. O.D. 6' ANN.
12' MAX. 12MAX.
TRENCH REPAIR DETAIL
Ms
L awD:
AV
AV
-�-
EXISTING STREET LIGHT
W
WATER MAIN
Ja
FIRE HYDRANT
S
SEWER MAIN
PROPOSED STREET LIGHT
SAWCUT, REMOVE & REPLACE AC PAVEMENT
EA
EACH
P.U.E.
PUBLIC UTILITY EASEMENT
SF
SQUARE FEET
L.M.E.
LANDSCAPE MAINTENANCE EASEMENT
LF
LINEAL FEET
-
CENTERLINE
■ ■
TRACT BOUNDARY
SD
STORM DRAIN
STORM DRAIN CONSTRUCTION NOTES
HIGHLAND
Z a > HIGH D AV
g a >
o g
01
i I
a
z
WNNUt AV
PROJECT
LOCATION
AV
1 REMOVE PORTION OF EXISTING RCP AND JOIN EXISTING RCP 16 LF
2 INSTALL 42' RCP (1500-D) 102 LF
3 INSTALL 360 RCP (1350-D) 770 LF
4 INSTALL 24" RCP (1350-D) » LF
5 CONSTRUCT MANHOLE PER A.P.W.A. STANDARD PLAN 320-1, SEE DETAILS ON SHEET 5 5 EA
6 CONSTRUCT MANHOLE PER AP.W.A STANDARD PLAN 322-1, SEE DETAILS ON SHEEP 7 1 E4
7 CONSTRUCT JUNCTION STRUCTURE PER AP.W.A. STANDARD PLAN 331-2, SEE DETAILS ON SHEEP 8 2 EA
8 REMOVE EXISTING CMP RISER 1 EA
9 CONSTRUCT CMP RISER PER DETAIL ON SHEEP 4 2 EA
SHEET INDEX
1. TITLE SHEET
2. STORM DRAIN UNE i1"
3. STORM DRAIN LATERALS A-1 70 A-3, AND LATERAL B
4. APWA STANDARD PLANS AND CMP RISER DETAIL
5-7. APWA STANDARD PLANS
QQRpFs SH'4
/0� CITY OF FONTANA CALIFORNIA
oPd�� AX1. CAPITAL IMPROVEMENT PROJECT PHASE IIA
� Z
1 77DRAWN BY.AE STORM DRAIN IMPROVEMENT PLANS SCALE:
a Exp. 6/30/076
0/07 � DESIGNED BY: - WALNVTAVENUE DATE:
No. 4397 m
T AS NOTED
* *
EW�E S EET MARCH, 2 6
00
�Tvr C i y i L ���P CHECKED BY: DRAWING NO.: I
FOFCAI\F� DSH -Li �J -lZ'OG 3700
CITY ENGINEER R.C.E. 51152 7
FILENAME: M:\dwg\14908\FINAL DESIGN\STORM DRAIN\P�iASEIIA�WAft4flTAVESD1.dwg