Loading...
HomeMy WebLinkAbout3694-10Q MAIN LINE RCP OR REINFORCED MONOLITHIC ARCH, SEE NOTE 2 -' J c4 SEE NOTE IO H H I I , 80 mm (31 MIN.�� II (L LATERAL/ �'�-- CONNECTOR PIPE I w ' J ROUND I o~ (EDGE rn � � CD EDGE 75 rnm � ►- --I ui 1,_ = Z L I (3') R ---- W Z ~ z E I -- W O , W. w `f' Q w O I I G z w U) �> coi m I I I E t0 STA. POINT CONNECTOR PIP I ' SEE NOTE 3 I 80 mm STA. POINT LATERAL SEE NOTE 3 PLAN SPUR IOM a 450 mm (&3 OR w4 0 18-) OC TIE BAR REINFORCING STEEL I G BARS 15M a 150 mm (•4 4 6') OC I- 80 mm (3') MIN. SPRING I LINE I \ >= a 130 mm (5') rr o - _ m fI ( EDGES ELEV. R 1 E B ARS 15M 1.51 \ ELEV S / p 80 mm (3') OC G BARS �.�15M0150mm gyp(0 0 6') OC •, IOM0450mm (s3 OR •4 Cb 18') OC TIE BARS E AND F BARS 15M 0 75 mm (05 0 3') OC, SEE NOTE 8 E TABLE OF VALUES FOR T B I T 300 mm (12') 130 mm (5') 375 mm (151 130 mm (5') 450 mm (18') 130 mm (5'l 525 mm (21') 130 mm (51 600 mm (241) 140 mm (5 1/2'j 675 mm (27') 140 mm (5 1/2'1 750 mm (301 150 mm (6') 825 mm (331 170 mm (6 1/2') 900 mm (369 170 mm (6 1/2'3 975 mm (391 180 mm (71 El: - E N fTIE BARS o - v • F BARS 15M (•5) \ � _7 ' 0 75 rnm (31 OC UNDISTURBED CONCRETE CRADLE. EARTH H H 265-C-14 (450-C-2000]. SEE NOTE 9 ~ SECTION Z -Z SECTION M -M G BARS AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER PROMULGATED BY THE JUNCTION STRUCTURE - PIPE TO PIPE INLET STA PUBLIC WORKS STANDARDS INc., GREENBOOK COMMITTEE 3 ID > 600 mm (24) OR ODS > 1 /2 MAIN LINE ID METR CPLAN 331 - 2 1984 DIMENSIONS REV. 1996 SHEET 1 OF 2 USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION SEE PARKWAY DRAIN CONNECTION DETAIL ON SHEET 14 01 15M 0 300 mm(940120) EACH WAY 5 mm(1/4•)R AND COVER CATCH BAS IN MANHOLE FRAME AND COVER oc N Wa 0� oZ �- � c J7 a zF 0 I ao STEPS = t: o" 11� _ a II W k / N u I 100 mm r m Ir DOWEL (TYP.) v PLAN 100 mm (4')MIN. 300 mm 75 mm (120)MAX. I (30)R - SLOP E OPTIONAL SUBGRADE LCONNECTOR PIPE OR MONOLITHIC CATCH -BAS 1 N B CONNECTION SECTION A -A 200 mm(89 IOM(s4) 90° E M DOWEL DETAIL STRUCTURAL DATA JUNCTION STRUCTURE PIPE TO PIPE INLETMETRIC WALL AND SLAB DIMENSIONS AND SHEET 20F2 I1R - FOR DIMENSIONS FLOW LINE � F*eE- PLA4E MAX DOWEL t t REQUIRED IN (TYPJ W SCORING I N N LINE BOTTOM CURB LINE - 2 EXTRA 15M(«4) I STEPS ON 2 SIDES OF WALL SLAB WALL MANHOLE FRAME I t 150 mm(6') AND COVER CATCH BAS IN MANHOLE FRAME AND COVER oc N Wa 0� oZ �- � c J7 a zF 0 I ao STEPS = t: o" 11� _ a II W k / N u I 100 mm r m Ir DOWEL (TYP.) v PLAN 100 mm (4')MIN. 300 mm 75 mm (120)MAX. I (30)R - SLOP E OPTIONAL SUBGRADE LCONNECTOR PIPE OR MONOLITHIC CATCH -BAS 1 N B CONNECTION SECTION A -A 200 mm(89 IOM(s4) 90° E M DOWEL DETAIL NOTES I_ THIS JUNCTION STRUCTURE SHALL BE USED WHEN THE OUTSIDE DIAMETER OF THE LATERAL IS GREATER THAN 1/2 THE INSIDE DIAMETER D OF THE MAIN LINE; OR WHEN THE INSIDE DIAMETER B OF THE LATERAL IS GREATER THAN 600 mm (24'). B SHALL NOT EXCEED .75 D OR 975 mm (39'). 2. IF THE MAIN LINE IS A REINFORCED MONOLITHIC ARCH STORM DRAIN. D SHALL REFER TO THE CLEAR SPAN OF THE ARCH_ REINFORCING STEEL SHALL BE CUT AND BENT INTO THE JUNCTION STRUCTURE IN THE SAME. MANNER AS FOR A PIPE. A CONCRETE CRADLE IS NOT REQUIRED FOR A REINFORCED MONOLITHIC ARCH. 3. STATIONS SHOWN ON THE PROJECT DRAWINGS FOR LATERALS APPLY AT THE INTERSECTION OF CENTER LINES OF MAIN LINE AND LATERAL. STATIONS SHOWN ON THE PROJECT DRAWINGS FOR CATCH BASIN CONNECTOR PIPES APPLY AT THE INTERSECTION OF THE INSIDE WALL OF THE MAIN LINE WITH THE CONNECTOR PIPE CENTER LINE. 4. VALUES FOR A, B. C AND D SHALL BE SHOWN ON THE PROJECT DRAWINGS. ELEVATION R AND ELEVATION S SHALL BE SHOWN ONLY WHEN REQUIRED PER NOTE 5. 5. a. ELEVATIONS R AND S NEED NOT BE SHOWN ON THE PROJECT DRAWINGS IF THE INLET PIPE IS TO ENTER THE MAIN LINE RADIALLY_ b. ELEVATION R SHALL BE SHOWN ON THE PROJECT DRAWINGS ONLY IF A STUB IS TO BE PROVIDED IN THE MAIN LINE FOR FUTURE CONNECTION OF AN INLET PIPE. c. ELEVATION S SHALL BE SHOWN ON THE PROJECT DRAWINGS IF AN INLET PIPE IS TO ENTER THE MAIN LINE OTHER THAN RADIALLY. INLET PIPE SHALL BE LAID ON A STRAIGHT GRADE FROM ELEVATION S TO THE CATCH BASIN OR GRADE BREAK IN LINE. 6. THE INLET PIPE SHALL ENTER THE MAIN LINE RADIALLY UNLESS OTHERWISE INDICATED. THE INLET PIPE MAY ENTER THE MAIN LINE OTHER THAN RADIALLY IF ANGLE A IS GREATER THAN 450. B 15 LESS THAN OR EQUAL TO 600 mm (24') AND THE OUTSIDE DIAMETER OF THE INLET PIPE IS LESS THAN .5 D: OTHERWISE, STANDARD PLAN 340 SHALL BE USED. 7. NO MORE THAN ONE OPENING SHALL BE MADE IN ANY ONE SECTION OF PIPE. S. THE OPENING FOR THE BREAKOUT SHALL BE RECTANGULAR AND CUT NORMAL, TO THE PIPE SURFACE WITHOUT DAMAGING THE REINFORCING STEEL. THE TRANSVERSE REINFORCEMENT OF THE MAIN LINE SHALL BE CUT AT THE CENTER OF THE OPENING AND BENT INTO THE TOP AND BOTTOM SLABS OF THE SPUR. 9. THE MAIN LINE SHALL BE REINFORCED WITH A CONCRETE CRADLE AND ENCASEMENT (AS APPLICABLE). A CONCRETE ENCASEMENT IS REQUIRED IF A JOINT IN THE MAIN LINE FALLS WITHIN THE LIMITS OF THE CRADLE. THE CONCRETE ENCASEMENT SHALL EXTEND 300 mm (12') ABOVE THE TOP OF THE MAIN LINE AND TO THE LIMITS OF THE CRADLE. IF CONNECTING TO AN EXISTING STORM DRAIN. PORTION OF CRADLE OPPOSITE INLET MAY BE OMITTED. 10. REINFORCING STEEL SHALL CONFORM TO ASTM A 615M. GRADE 300. (ASTM A 615. GRADE 40). AND BE PLACED 40 mm (1 1/2') CLEAR FROM CONCRETE SURFACES. UNLESS OTHERWISE SHOWN F BARS SHALL BE CARRIED TO A POINT NOT LESS THAN J DISTANCE FROM CENTER LINE WITH J=7D/12 + 150 mm (61. 11. FLOOR OF THE SPUR SHALL BE STEEL -TROWELED TO THE SPRING LINE OF THE SPUR. 12. DIMENSIONS SHOWN ON THIS PLAN FOR METRIC AND ENGLISH UNITS ARE NOT EXACT EQUAL VALUES. IF METRIC VALUES ARE USED. ALL VALUES USED FOR CONSTRUCTION SHALL BE METRIC VALUES, EXCEPT REINFORCING BARS S12ES IN ENGLISH UNITS MAY .BE SUBSTITUTED FOR METRIC BAR SIZES. IF ENGLISH UNITS ARE USED, ALL VALUES USED FOR CONSTRUCTION SHALL BE ENGLISH UNITS. AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER STRUCTURAL DATA JUNCTION STRUCTURE PIPE TO PIPE INLETMETRIC WALL AND SLAB DIMENSIONS AND SHEET 20F2 REINFORCEMENT REQUIREMENTS 340-1 FOR DIMENSIONS REV' less REINFORCEMENT USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION MAX MAX t t REQUIRED IN D2 W V F N FRONT REAR BOTTOM END WALL WALL SLAB WALL co 1.0 m(3.59) 2.4 m(81) 150 mm(6') 150 mm(6') , 1 1.0 m(3.5') 3.5 m(12') 200 mm(8') 200 mm(8') 2.0 m(7'] 1.8 m(61) 150 mm(60) 150 mm(6') 0. ff4 @0 12" D.C. 2.0 m(7'3 3.5 m(121) 200 mm(8') 200 mm►(8') o (mm) (INCHES) R E 4.0 m(14') 1.2 m(41) 150 mm(60) 150 mm(6•) 300 2.4 m(8') 150 mm(6') 200 mm(8') v c in 1 N F 4.0 m(141) 3.5 m(12') 200 mm(8') 250 mm(1109 o c =- E ra „ a 1.2 m(4') 150 mm(6') ISO mm(6') 975 39 180 7 O R R E C Q M U E E IN / T D 1.8 m(6' 1 150 mm(60) 200 mm(8') 2.4 m(89 200 mm(8') 200 mm(8') 3.0 m(1101) 200 mm(8I) 250 mm(l0') 3.5 fm(12') 200 mmt8') 250 mm(10•) 1500 60 250 9 1/2 FOR W > 9 "261). V > 3.5 m(I21) OR 8 > 1.2 m(41) SEE PROJECT PLANS -L DRAIN JUNCTION STRUCTURE- 22ARKWAY ) NOTES I_ THIS JUNCTION STRUCTURE SHALL BE USED WHEN THE OUTSIDE DIAMETER OF THE LATERAL IS GREATER THAN 1/2 THE INSIDE DIAMETER D OF THE MAIN LINE; OR WHEN THE INSIDE DIAMETER B OF THE LATERAL IS GREATER THAN 600 mm (24'). B SHALL NOT EXCEED .75 D OR 975 mm (39'). 2. IF THE MAIN LINE IS A REINFORCED MONOLITHIC ARCH STORM DRAIN. D SHALL REFER TO THE CLEAR SPAN OF THE ARCH_ REINFORCING STEEL SHALL BE CUT AND BENT INTO THE JUNCTION STRUCTURE IN THE SAME. MANNER AS FOR A PIPE. A CONCRETE CRADLE IS NOT REQUIRED FOR A REINFORCED MONOLITHIC ARCH. 3. STATIONS SHOWN ON THE PROJECT DRAWINGS FOR LATERALS APPLY AT THE INTERSECTION OF CENTER LINES OF MAIN LINE AND LATERAL. STATIONS SHOWN ON THE PROJECT DRAWINGS FOR CATCH BASIN CONNECTOR PIPES APPLY AT THE INTERSECTION OF THE INSIDE WALL OF THE MAIN LINE WITH THE CONNECTOR PIPE CENTER LINE. 4. VALUES FOR A, B. C AND D SHALL BE SHOWN ON THE PROJECT DRAWINGS. ELEVATION R AND ELEVATION S SHALL BE SHOWN ONLY WHEN REQUIRED PER NOTE 5. 5. a. ELEVATIONS R AND S NEED NOT BE SHOWN ON THE PROJECT DRAWINGS IF THE INLET PIPE IS TO ENTER THE MAIN LINE RADIALLY_ b. ELEVATION R SHALL BE SHOWN ON THE PROJECT DRAWINGS ONLY IF A STUB IS TO BE PROVIDED IN THE MAIN LINE FOR FUTURE CONNECTION OF AN INLET PIPE. c. ELEVATION S SHALL BE SHOWN ON THE PROJECT DRAWINGS IF AN INLET PIPE IS TO ENTER THE MAIN LINE OTHER THAN RADIALLY. INLET PIPE SHALL BE LAID ON A STRAIGHT GRADE FROM ELEVATION S TO THE CATCH BASIN OR GRADE BREAK IN LINE. 6. THE INLET PIPE SHALL ENTER THE MAIN LINE RADIALLY UNLESS OTHERWISE INDICATED. THE INLET PIPE MAY ENTER THE MAIN LINE OTHER THAN RADIALLY IF ANGLE A IS GREATER THAN 450. B 15 LESS THAN OR EQUAL TO 600 mm (24') AND THE OUTSIDE DIAMETER OF THE INLET PIPE IS LESS THAN .5 D: OTHERWISE, STANDARD PLAN 340 SHALL BE USED. 7. NO MORE THAN ONE OPENING SHALL BE MADE IN ANY ONE SECTION OF PIPE. S. THE OPENING FOR THE BREAKOUT SHALL BE RECTANGULAR AND CUT NORMAL, TO THE PIPE SURFACE WITHOUT DAMAGING THE REINFORCING STEEL. THE TRANSVERSE REINFORCEMENT OF THE MAIN LINE SHALL BE CUT AT THE CENTER OF THE OPENING AND BENT INTO THE TOP AND BOTTOM SLABS OF THE SPUR. 9. THE MAIN LINE SHALL BE REINFORCED WITH A CONCRETE CRADLE AND ENCASEMENT (AS APPLICABLE). A CONCRETE ENCASEMENT IS REQUIRED IF A JOINT IN THE MAIN LINE FALLS WITHIN THE LIMITS OF THE CRADLE. THE CONCRETE ENCASEMENT SHALL EXTEND 300 mm (12') ABOVE THE TOP OF THE MAIN LINE AND TO THE LIMITS OF THE CRADLE. IF CONNECTING TO AN EXISTING STORM DRAIN. PORTION OF CRADLE OPPOSITE INLET MAY BE OMITTED. 10. REINFORCING STEEL SHALL CONFORM TO ASTM A 615M. GRADE 300. (ASTM A 615. GRADE 40). AND BE PLACED 40 mm (1 1/2') CLEAR FROM CONCRETE SURFACES. UNLESS OTHERWISE SHOWN F BARS SHALL BE CARRIED TO A POINT NOT LESS THAN J DISTANCE FROM CENTER LINE WITH J=7D/12 + 150 mm (61. 11. FLOOR OF THE SPUR SHALL BE STEEL -TROWELED TO THE SPRING LINE OF THE SPUR. 12. DIMENSIONS SHOWN ON THIS PLAN FOR METRIC AND ENGLISH UNITS ARE NOT EXACT EQUAL VALUES. IF METRIC VALUES ARE USED. ALL VALUES USED FOR CONSTRUCTION SHALL BE METRIC VALUES, EXCEPT REINFORCING BARS S12ES IN ENGLISH UNITS MAY .BE SUBSTITUTED FOR METRIC BAR SIZES. IF ENGLISH UNITS ARE USED, ALL VALUES USED FOR CONSTRUCTION SHALL BE ENGLISH UNITS. AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER STANDARD PLAN 3S� JUNCTION STRUCTURE PIPE TO PIPE INLETMETRIC ID > 600 mm 24" OR O/2 MAIN LINE ID ( � D> 1 SHEET 20F2 NOTES I. WHERE THE BASIN IS TO BE CONSTRUCTED WITHIN THE LIMITS OF EXISTING OR PROPOSED SIDEWALK OR IS CONTIGUOUS TO SUCH SIDEWALK. THE TOP SLAB OF THE BASIN MAY BE POURED EITHER MONOLITHIC WITH THE SIDEWALK OR SEPARATELY. USING THE SAME CLASS OF CONCRETE AS IN THE BASIN. WHEN POURED MONOLITHICALLY. THE SIDEWALK SHALL BE PROVIDED WITH A WEAKENED PLANE OR A 25 mm(I') DEEP SAWCUT CONTINUOUSLY AROUND THE EXTERNAL PERIMETER OF THE CATCH BASIN WALLS. INCLUDING ACROSS THE FULL WIDTH OF THE SIDEWALK. SURFACE OF ALL EXPOSED CONCRETE SHALL CONFORM IN SLOPE. GRADE. COLOR. FINISH, AND SCORING TO EXISTING OR PROPOSED CURB AND 'WALK ADJACENT TO THE BA$ IN. 2. ALL CURVED CONCRETE SURFACES SHALL BE FORMED BY CURVED FORMS. AND SHALL NOT BE SHAPED BY PLASTERING. 3. FLOOR OF BASIN SHALL BE GIVEN A STEEL TROWEL FINISH AND SHALL HAVE A LONGITUDINAL AND LATERAL SLOPE OF 1= 12 MINIMUM AND I: 3 MAXIMUM, EXCEPT WHERE THE GUTTER GRADE EXCEEDS 8 PERCENT. IN WHICH CASE THE LONGITUDINAL SLOPE OF THE FLOOR SHALL BE THE SAME AS THE GUTTER GRADE. SLOPE FLOOR FROM ALL DIRECTIONS TO THE OUTLET. 4. DIMENSIONS= B = 970 mm(3' -2' ) V = THE DIFFERENCE IN ELEVATION BETWEEN THE TOP OF THE CURB AND T;HE INVERT OF THE CATCH BASIN AT THE OUTLET = 1.35 m(4.51). VU = THE DIFFERENCE IN ELEVATION BETWEEN THE TOP OF THE CURB AND THE INVERT AT THE UPSTREAM END OF THE BASIN. AND SHALL BE DETERMINED BY THE REQUIREMENTS OF NOTE 3. BUT SHALL NOT BE LESS THAN CURB FACE PLUS 300 mm(120). vi = THE DIFFERENCE IN ELEVATION BETWEEN THE TOP OF THE CURB AND THE INVERT OF THE INLET. NOTED ON THE PROJECT PLANS. H = NOTED ON THE PROJECT PLANS. W = NOTED ON THE PROJECT PLANS. A = THE ANGLE, IN DEGREES. INTERCEPTED BY THE CENTERLINE OF THE CONNECTOR PIPE AND THE CATCH BASIN WALL TO WHICH THE CONNECTOR PIPE IS ATTACHED. 5. PLACE CONNECTOR PIPES AS INDICATED ON THE PROJECT PLANS. UNLESS OTHERWISE SPECI- FIED. THE CONNECTOR PIPE SHALL BE LOCATED AT THE DOWNSTREAM END OF THE BASIN. WHERE THE CONNECTOR PIPE IS SHOWN AT A CORNER. THE CENTERLINE OF THE PIPE SHALL INTERSECT THE INSIDE CORNER OF THE BASIN. THE PIPE MAY BE CUT AND TRIMMED AT A SKEW NECESSARY TO INSURE MINIMUM 80 mm(3') PIPE EMBEDMENT. ALL AROUND. WITHIN THE CATCH BASIN WALL, AND 75 mm(3') RADIUS OF ROUNDING OF STRUCTURE CONCRETE. ALL AROUND. ADJACENT TO PIPE ENDS. A MONOLITHIC CATCH BASIN CONNECTION SHALL BE USED TO JOIN THE CONNECTOR PIPE TO THE CATCH BASIN WHENEVER ANGLE 'A' IS LESS THAN 70 DEGREES OR GREATER THAN 110 DEGREES. OR WHENEVER THE CONNECTOR PIPE IS LOCATED IN A CORNER. THE OPTIONAL USE OF A MONOLITHIC CATCH BASIN CONNECTION IN ANY CASE IS PERMITTED. MONOLITHIC CATCH BASIN CONNECTIONS MAY BE CONSTRUCTED TO AVOID CUT- TING STANDARD LENGTHS OF PIPE. 6. STEPS SHALL BE LOCATED AS SHOWN, IF THE CONNECTOR PIPE INTERFERES WITH THE STEPS. THEY SHALL BE LOCATED AT THE CENTERLINE OF THE DOWNSTREAM END WALL. STEPS SHALL BE SPACED 300 mm(12") APART. THE TOP STEP SHALL BE 175 mm(7') BELOW THE TOP TO THE MANHOLE AND PROJECT 65 mm(2-1/2'). ALL OTHER STEPS SHALL PROJECT 134 mm(50). 7. DOWELS ARE REQUIRED AT EACH CORNER AND AT 2 m(7') ON CENTER (MAXIMUM) ALONG THE B ACKWALL. 8. THE FOLLOWING STANDARD PLANS ARE INCORPORATED HEREIN= 308 MONOLITHIC CATCH BASIN CONNECTION 309 CATCH BASIN REINFORCEMENT 310 CATCH BASIN FACE PLATE ASSEMBLY AND PROTECTION BAR 312 CATCH BASIN MANHOLE FRAME AND COVER 635 STEEL STEP 636 POLYPROPYLENE PLASTIC STEP 9. DIMENSIONS SHOWN ON THIS PLAN FOR METRIC AND ENGLISH UNITS ARE NOT EXACT EQUAL VALUES. IF METRIC VALUES ARE USED. ALL VALUES USED FOR CONSTRUCTION SHALL BE METRIC VALUES. EXCEPT REINFORCING BARS SIZES IN ENGLISH UNITS MAY BE SUBSTITUTED FOR METRIC BAR SIZES. IF ENGLISH UNITS ARE USED, ALL VALUES USED FOR CONSTRUCTION SHALL BE ENGLISH UNITS. E LATERAL / CONNECTOR PIPE _N IOM0450 mm y (•3 OR 940(8') OC B/ ROUND EDGES TO RADIUS G OF APPROXIMATE ID OF LATERAL. MAXIMUM �5 900 mm (361) � 9 A a B BARS 150 m (6') OUND EDGES TO 75 min (3') R Iso mm w L6 P (L MAIN LINESEE I P NOTE 8 I c- - - - - - - - c - U. vm .♦ STATION STATION N' M IOM (•3 OR •4). STATION PT. D BARS SEE NOTE 4 P_ D BARS IOM (03 OR •4) (I ELEV. ELEV. I I I STA. STA. II I 114 ,-- 15M0450 mm (•40189 OC. BOTH WAYS. TO BE USED WHEN D2 IS 1500 mm (60') OR MORE LONGITUDINAL SECTION D BARS w OM (03 A BARS �� R 04) ~ F BARS IO IOM0450 mm --1 m I m X- Z (03 OR 04 B BARS 0 I88) oc I ELEV. R ELEV. S I 151010450 mm (•40181) OC. w- BOTH WAYS. TO BE USED WHEN B IS 1500 mm (60') dOR MORE CL MAIN LINE SECTION No -No -Wo PROJECTED ON M -M -No AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER PROMULGATED BY T- STANDARD PLAN METRIC PUBLIC WORKS STANDARDS INC., GREENBOOK COMMITTEE PIPE TO PIPE 340-1 FOR DIMENSIONS REV' less SHEET 1 OF 2 USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION AND BAR SIZES D2 F N y cr OR OR co m m L_ tr B T a o o 0. a o (mm) (INCHES) (mm) (INCHES) 300 12 110 4 v c in o a o O - 375 13 110 41/4 450 18 120 4 1/2 525 21 130 5 E ,� O 600 24 140 51/4 675 27 140 51/2 750 30 160 6 825 33 160 61/4 900 36 170 61/2 975 39 180 7 1050 42 190 71/2 v 0 a t E v 0 in E E N 'n E E ,) N 1125 45 200 7 3/4 1200 48 210 8 1275 51 220 81/2 1350 54 230 9 1425 57 240 9 1/4 1500 60 250 9 1/2 1575 63 260 10 1650 66 266 10 1/4 r- x W 1725 69 280 10 3/4 1800 72 280 11 1950 78 300 II 3/4 2100 84 320 121/2 2250 90 340 131/4 0 O c 2400 96 360 14 2550 102 400 15 1/2 2700 108 410 16 .. 2850 114 420 161/2 3000 120 440 17 E to E 0 a c `v E o o a 3150 126 440 17 3300 132 430 17 1/2 d a 3450 138 450 171/2 3600 144 460 18 U. vm .♦ STATION STATION N' M IOM (•3 OR •4). STATION PT. D BARS SEE NOTE 4 P_ D BARS IOM (03 OR •4) (I ELEV. ELEV. I I I STA. STA. II I 114 ,-- 15M0450 mm (•40189 OC. BOTH WAYS. TO BE USED WHEN D2 IS 1500 mm (60') OR MORE LONGITUDINAL SECTION D BARS w OM (03 A BARS �� R 04) ~ F BARS IO IOM0450 mm --1 m I m X- Z (03 OR 04 B BARS 0 I88) oc I ELEV. R ELEV. S I 151010450 mm (•40181) OC. w- BOTH WAYS. TO BE USED WHEN B IS 1500 mm (60') dOR MORE CL MAIN LINE SECTION No -No -Wo PROJECTED ON M -M -No AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER PROMULGATED BY TRANSITION STRUCTURE STANDARD PLAN METRIC PUBLIC WORKS STANDARDS INC., GREENBOOK COMMITTEE PIPE TO PIPE 340-1 1992 REV' less SHEET 1 OF 2 USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION 80 r S CURB & 11 00 PLAN VIEW PARKWAY DRAIN JUNCTION STRUCTURE SEE SHEET 10 NOTES I. THE HORIZONTAL ANGLE OF CONVERGENCE OR DIVERGENCE. A, SHALL NOT EXCEED 5045. 2. VALUES FOR A. B. C. DI AND D2 ARE SHOWN ON THE PROJECT DRAWINGS. ELEVATION R AND ELEVATION S ARE SHOWN WHEN REQUIRED BY NOTE 10. 3. FLOOR OF STRUCTURE SHALL BE STEEL TROWELED TO SPRING LINE. 4. REINFORCEMENT STEEL SHALL CONFORM TO ASTM A 615 M (A 615). GRADE 300(40), AND SHALL TERMINATE 40 mm (1 1/2') CLEAR OF CONCRETE SURFACES UNLESS OTHERWISE SHOWN. LONGITUDINAL BARS SHALL BE IOM 0 450 mm (#3 OR •4 0 188) OC OR LESS. 5. ELEVATION S APPLIES AT INSIDE WALL OF STRUCTURE. 6. TRANSITION STRUCTURE SHALL BE POURED IN ONE CONTINUOUS OPERATION, EXCEPT THAT THE CONTRACTOR SHALL HAVE THE OPTION OF PLACING AT THE SPRING LINE A CONSTRUCTION JOINT LONGITUDINAL KEYWAY. 7. THE LENGTH OF THE STRUCTURE MAY BE INCREASED AT THE OPTION OF THE CONTRACTOR TO MEET RCP ENDS, USING D BARS. LONGITUDINAL AND BOTTOM REINFORCEMENT IN EXTENDED PORTION OF SAME DIAMETER AND SPACING AS SPECIFIED IN THE TABLE. BUT ANY CHANGE IN THE LOCATION OF SPUR MUST BE APPROVED BY THE ENGINEER. B. EMBEDMENT P SHALL BE AS SPECIFIED IN THE TABLE. UNLESS OTHERWISE SHOWN ON THE PROJECT DRAWINGS. 9. WHEN THERE IS NO SPUR REQUIRED, A & B BARS SHALL BE OMITTED. 10. WHEN ELEVATION R AND ELEVATION S ARE NOT SHOWN ON PROJECT DRAWINGS, INLET PIPE SHALL ENTER MAIN LINE RADIALLY. WHEN INLET PIPE ENTERS MAIN LINE OTHER THAN RADIALLY, ELEVATION S SHALL BE SHOWN ON PROJECT DRAWINGS, AND INLET PIPE SHALL BE LAID ON A STRAIGHT GRADE FROM ELEVATION S TO CATCH BASIN OR GRADE BREAK IN INLET LINE. ELEVATION R SHALL BE SHOWN ON PROJECT DRAWINGS ONLY WHEN STUB IS TO BE PROVIDED IN MAIN LINE FOR FUTURE CONSTRUCTION OF INLET PIPE. 11. THE MAXIMUM COVER ABOVE THIS STRUCTURE SHALL BE 7.5 m (25'). IF THE COVER EXCEEDS 7.5 m (259 A SPECIAL STRUCTURE SHALL BE DESIGNED FOR THE COVER AND DETAILED ON THE PROJECT DRAWINGS. 12. DIMENSIONS SHOWN ON THIS PLAN FOR METRIC AND ENGLISH UNITS ARE NOT EXACT EQUAL VALUES. IF METRIC VALUES ARE USED. ALL VALUES USED FOR CONSTRUCTION SHALL BE METRIC VALUES EXCEPT REINFORCING BAR SIZES IN ENGLISH UNITS MAY BE SUBSTITUTED FOR METRIC BAR SIZES. IF ENGLISH UNITS ARE USED, ALL VALUES USED FOR CONSTRUCTION SHALL BE ENGLISH UNITS. AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER STANDARD PLAN 340 - 1 TRANSITION STRUCTUREmmIU PIPE TO PIPE SHEET 2 OF 2 EXTEND DdSTTNG REWS INTO REMOVE INTERFERING 216 CONT. 2 T�OJUNCTION PaRTTONs OF EXISTING � MIN. PARKWAY DRAIN -.- 2#6 CONT. I os STORM DRAIN CN z Z SEE SHEETS 5 AND 7. g BEND EXISTING N PROFESS/0 USTRUCTURELL ��JS JUNCTION JUNCTION STRUCTURE ac No. 43976 REINFORCING PER * E"p- 6/30/07 6 *DgSTING PARKWAY DETAIL ON SHEET 10 DRAIN. CONTRACTOR SHALL Nom' DE (ERMINE LOCATION AND W19TH PRIOR TO L-Iff °" SECTION AA PARKWAY DRAIN JUNCTION STRUCTURE DETAt�10) RECORD DOCUMENT These record Documents have been prepared based on information provided by others. The Design Professional has not verified the accuracy and/or completeness of this information and shall not be responsible for any errors or omissions > y be ' ncorporated herein as a res It • 2 Ob A E REV. REVISION DESCRIPTION DATE ENGR. CITY DATE ORIGINAL BENCHMARK ---------------- - Prepared B�: CITY QF FONTANA CALIFORNIA Q Q SHOULD CONSTRUCTION OF RE UIRED oFEss Ksc o?•s7 vq-AW 1 N 6 S i �z8 IMPROVEIIr RM NOT COMMENCE WITHIN PREPARED FOR: CITY OF FONTANA BM -361 ALLARD ENGINEERING �<Q p s. NqC l Lo R.R. SPIKE IN PP NO. 1536697E AT THE SW CORNER �� �J 'y�� F� CAPITAL IMPROVEMENT PROJECT PHASE I TWO YEARS OF THE DATE OF APPROVAL CITY OF FONTANA OF BASELINE AVENUE AND SULTANA AVENUE. Civil Engineering - Land Surveying - Land Planning O M rl 11,o SHOWN HEREON AND CARRIED FORTH INA 8353 SIERRA AVENUE ELEVATION: 1365.01, SINCE DESTROYED -= 8253 Sierra Avenue co DRAwNCM-MAG STORM DRAIN IMPROVEMENT PLANS SCALE: No. 43976 m AS NOTED � DIAL DILIGENT MANNER, THE CITY ENGINEER MAY FONTANA CA -92335 Fontana, California 92335 � � DATE: 1 TWO WORKING Exp. 6/30/05 DESIGNED BY: APWA D AILS BEFORE �� DAYS BEFORE. REQUIRE REVISIONS TO THE PLANS TO _ SITE BENCHMARK (909) 356-1815 Fax (909) 356-1795 * * EW w Y ❑ U DIG YOU DIG (909) 350 7610 SW CORNER, SEC. 31, T.1 N., R.5W., S.8M.-2" I.P. s Q. __ MARCH, 2005 Q BRING THEM INTO CONFORMANCE WITH FAX (909) 350-6618 WITH BRASS CAP, C.S.M. AT THE INTERSECTION OF - ` �' d 9� C I V t.k- �'� CHECKED BY: APPR B • 7/. _DRAWING NO.: 10 TGLL FREE 1-800-227-2600 CONDITIONS AND STANDARDS IN EFFECT BASELINE AVENUE AND CITRUS AVENUE. David S. Hammer, A.C.E. 43976 Date FOF"CAL\ DSH o. A PUBLIC.SERVICE BY UNDERGROUND SERVICE ALERT DSH HEVATIOM 139516 (expires 6/30/2005) 11 CITY -ENNItR R.C.E. 51152 3694 14 rILtNAMt: M:\0Wg\IlftfU0\rINAL Ut-3IbN \0IUKM UKAIN \rMAJt I \VVALNU IAVtSU I U.OW9