Loading...
HomeMy WebLinkAbout4834-11. 2. 3. :qI 5. 6. 7. 9. 10. 11. 12. 13. 14. 15. 16. ARE HEREBY MADEA PART HEREOF. REVISION DESCRIPTION PRIOR TO THE START OF GRADING, ALL EXISTING VEGETATION AND DEBRIS, BY CITY DATE INCLUDING EXI57INGSTRUC7URES, FOOTINGS, FOUNDATIONS, RUBBLE, TREES, REVISED PER CFTY PLAN CHECK COMMENTS AND ROOT SYSTEMS, SHALL BE REMOVED FROM 7HESITE TO THE 9/11/09 SA775FACTIONOFTHE SOILS ENGINEER. IMPORTANT NOTICE: AFTER STRIPPING EXISTING DEBRIS, ANY DfIST7NGLOOSE FILL OR DISTURBED SECTION 4216/4217 OF THE GOVERNMENT CODE REQUIRES A DIG ALERT IDENTIFICATION NUMBER TO NATURAL SOILS SHALL BE00AVATED TO THE SA77SFAC77ONOFTHE SOILS BE ISSUED BEFORE A PERMIT TO EXCAVATE WILL BE VALID. FOR YOUR DIG ALERT ID NUMBER CALL ENGINEER. UNDERGROUND SERVICE ALERT. THE TOLL FREE NUMBER IS (800) 422-4133 TWO WORKING DAYS BEFORE YOU DIG. THE EXPOSED SOILS SHALL THEN BE INSPECTED BY THE SOILS ENGINEER, ANDANYADDITIONAL OVER -EXCAVATION SHALL 7HENBEMADEIN THE CITY OF FONTANA LANDSCAPE TECHNICIAN WILL CONDUCT A FINAL LANDSCAPE INSPECTION ACCORDANCE WITHTHE SOILS ENGINEERS RECOMMENDA77ONAND AS UPON RECEIPT OF THE LANDSCAPE ARCHITECT'S CERTIFICATION AND INSPECTION FORM. (48 HOUR CONTAINED IN THE SOILS REPORT NOTIFICATION REQUIRED). CALL (909) 350-6649 THEEXPOSED SOILS SHOULD THEN BESCA RIFIED TO A MINIMUM DEPTH OF 6INCHES, BROUGHT TO PROPER MOISTURECONTENTAND COMPACTED TO ATLE45T90 % OF THE MWMUMDENSITY OBTAINABLE BYTHE A.S.T..M. INSPECTIONS: 0-1557-70 METHOD OF COMPAC 17ON TO ATTAINA DENSEAND UNYIELDING COND1770N. THE CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT 48 HOURS IN ADVANCE OF ALL COMPA C77ON SHALL BE OBTAINED B Y METHODS A PPRO VED B Y THE SOILS REQUIRED SITE REVIEWS AS FOLLOWS: ENGINEER. 1. PRE -CONSTRUCTION MEETING 2. IRRIGATION SYSTEM REVIEW PRIOR TO BACK FILL IFANYUNKNOWNSUBSURFACE 57RUCTURESARE ENCOUNTERED 3. SOIL PREPARATION DURINGCONSTRUC770N, THEYSHALL BEIMMEDIATEL YBROUGHT TO THE 4. PLANT MATERIAL PRIOR TO INSTALLATION A77EN770N OF THE SOILS ENGINEER PRIOR 70 PROCEEDING. S. IRRIGATION COVERAGE TEST 6. COMPLIANCE WITH PLANS DUSTSHALL BE CONTROLLED BY WATERING THROUGHOUT THE GRADINGAND FAILURE TO NOTIFY THE LANDSCAPE ARCHITECT AND OBTAIN APPROVAL WILL HOLD THE BUILDING CONS7RUC7IONOPERA 77ONS. CONTRACTOR LIABLE FOR ANY CHANGES REQUIRED. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE THE WORK SO THE ENTIRE PHASE IS READY FOR EACH OF THE LISTED REVIEWS AT ONE PRO7EC7IVE MEASURES SHALL BE TAKEN BY THE CONTRACTOR TO PROTECT' SITE VISIT. ADJACENT PROPERTYATALL 77MES DURING 0007RUCTION. PR07EC MIE MEASURES SHALL BE TAKEN BY THE COh 7RACTOR SO AS NOT TO GA USE ANYMUD, SILT OR DEBRIS ONTO PUBLIC OR ADJACENTPROPERTY. ANY MUD ORDEBRIS ONPUBL.ICPROPERTYSHALLBE CITY REQUIRED NOTES REMOVED IMMEDIATELY. INSPECTIONS: ALL GRADINGAND FILLING OPERA77ONSSHALL BE OBSERVED, INSPECTED 1. IT IS THE LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE ENGINEERING AND TESTED BYA LICENSED SOILS ENGINEER DIVISION'S LANDSCAPE INSPECTOR 48 HOURS PRIOR TO THE DESIRED INSPECTION OF AN ITEM APPROVED BY THE OWNER, AND COMPACTION REPORTS PROVIDED FOR CITY AT (909) 350-6632, APPROVAL, 2. PRIOR TO RELEASE OF UTILITIES OR MAINTENANCE PERIOD COMMENCEMENT OF THE FOLLOWING PRIOR TO THE START OFANYBUILDINGCONS7RUCTION, THECONTRACTOR INSPECTIONS ARE REQUIRED. 2.1. PRE -CONSTRUCTION INSPECTION SHALL FURNISH THE ARCHIT , OWNER AND THE CTTY WITH THE CIVIL 2.2• INSPECTION OF IRRIGATION SYSTEM IN AN OPEN TRENCH CONDITION (PRIOR TO BACKFILL). ENGINEERS WRITTEN OPINION THATAPPROVED PLANSAND COMPACTION MAINLINE PRESSURE TEST AT 150 PSI FOR A THREE (3) HOUR CONTINUOUS PERIOD. REPORTS FROM THE SOILS ENGINEER THAT THE PROPER COMPACTIONAND PREPARA770N HAS BEEN 2.3. IRRIGATION COVERAGE TESTS INCLUDING INITIAL AND FINAL TESTS. OBTAINED. 2.4. FINISH GRADE PRIOR TO PLANTING. 2,5. PLANT MATERIALS PRIOR TO PLANTING AND SOIL PREPARATION. NO GRADING SHALL COMMENCE WITHOUT OBTAINING GRADING PERMITAND 2,6. PLANTING, INCLUDING STREET TREES, CONTACT THE PARKS PLANNING AND LANDSCAPE N077FYING GRADING INSPECTOR 24 HOURS PRIOR TO DEVELOPMENT SECTION, ENGINEERING DMSION, FOR THE SPECIES AND FINAL LOCATIONS. THE START OF WORK. 2.7. COMPLIANCE WITH APPROVED PLANS. 2.8. FINAL INSPECTION. PRIOR TO 7NECOMPLETION OF THIS CONTRACT; 7HECON RACTORSHALL 3. THE OWNER'S REPRESENTATIVE AND LANDSCAPE CONTRACTOR SHALL BE PRESENT AT EACH OBTAINCOMPACTIONREPORTSFROM THE SOILS ENGINEER 7HA T 77YE PROPER INSPECTION. SUBGRADE COMPACTION HAS BEEN OBTAINED AND SHALL FURNISH SAID . REPORTS TO THE OWNER FOR APPROVAL. 771E CONTRACTOR SHALL BE RESPONSIBLE TO REPORT DISCREPANCIES IN PLANSAND/OR FIELD CONOTUONSIMMEDIAW Y TO THE DESIGN ENGINEER FOR RESOLUTIONS PRIOR TO CONSMUC770N, AND SHALL BE RESPONSIBLE FOR DISCREPANCIES NOT SO REPOR7FD AND RESOLVED. ALL MANUFACTURED SLOPESARE2(H): 1(V) UNLF-55 07HERWISENOTED ON 7HE PLANS. NO SLOPES SHALL BE CONSTRUCTED STEEPER THAN 2(H): 1(v), 1z SEE THE DIMENSION CONTROL PLAN FOR PREC7SEHORIZONTAL CONTROL DATA.-CURVEDATA, BEARINGS, DISTANCES. ETC. 18. PRIOR TO THE COMPLE7I0N OF T 75 CONTRACT, THE CONTRACTOR SHALL OBTAIN THE CIVIL ENGINEER S WRITTEN OPINION THA THE PROPER SUBGRADE ELEVA77ONS HAVE BEEN OBTAINED AND SHALL FURNISH SAID WRITTEN OPINION TO THE OWNER FOR APPROVAL, 19. MINIMUM GRADES SHALL BE., (A) CONCRETE STRUCTURES, "V"GUTTFRS. CURB AND GUTTER, ETC = a50% (B) ASPHALT, TURF. GRADED SOIL ETC. =1.0% 20. CONTRACTOR SHALL IMPLEMENT SAND BAG EROSION CONTROL MF4SURES AS NECESSARY TO PROTECT THE GRADING OPERA 77ONS A ND ADJACENT PROPERTY. EROSION CON7ROL MEASURES TO BEIMPLEMENTED IN ACCORDANCE WITH CHAPTER 33 OF THE CALIFORNIA BUILDING CODE, 2001 EDITION. 21. ALL TRENCH BACKFILL TO BE CER7TFIED BYSOILS ENGINEER, 22. CITY OF FONTANA UTILITY N077FICA77ON LIST CITY OF FONTANA PAC7FIC BELL CO. CRAWFORD CANYON MUTUAL WA7FR CO. AT7N: CARLOS NAVARR0 A7TN: NORMA GUILLOT AT77V.• BASIL J, FABRI270 8353 SIERRA AVENUE 1265N. VAN BUREN STREET (909) 463-9580 FONTANA, CA 92335 SUITE 180 (909) 350-6632 ANAHEIM, G4 92807 UNDERGROUND SERVICEALERT (714)666-5401 (800) 422-4133 SO. CALIFORNIA GAS COMPANY COMC45T (CABLE T V) WEST SAN BERNARDINO WATER CO. ATTN• GREG GASPAR A777V.• JACK HAYES 1205 AT7N,• LON 75M 16231 VALLEYBLVD. DUPONTAVENUEONTARIO, CA. 91761 855 W. WELINE ROAD FONTANA, G4.92335 (909) 390-4736 RML70, CA 92377 (909) 428-8411 EMERGENCIES- (600) 427-2200 VERIZON ATTN. 57EVE HOCK 50, CALIFORNIA EDISON COMPANY 1400 F PHILLIPS BLVD. 7951 REDWOOD AVE. POMONA, 04.91766 FONTANA, C4 92335 (909) 469-6327 (909) 820-5598 - UNDERGROUND (909) 875-5100 - 77Z40MISSIONS FONTANA WA7FR COMPANY (213) 637-1233 - PIPELINES ATTN.'MICHAEL J. MCGRAW (909) 357-6233 - D2S-WBM0N 8440 NUEVO AVENUE FONTAIK CA 92335 (909) 822-2201 FAX- (909) 823-5046 23. ALL GRADING SHALL CEASE DURING PERIODS OF WINDS IN EXCESS OF 25 MPH. SITESHALL BE KEPT CON77NUDUSLY WA7FRED DURING PERIODS OF HIGH WINDS TO PREVENT AIRBORNE EROSION. TOLL FREE 1-800-227-2600 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT 112 AM CFD {# 1, 7.L%>'��, 7 ' D 0 C U M E N T%wp NO N 1424�y. ffia n IlNj TH�EUITY C [=uNTAl\jA i' 1. CA. - DATE: TRACT: LOTS: DESIGN REVIEW: THIS FORM IS TO CERTIFY THAT THE LANDSCAPE WORK HAS BEEN COMPLETED IN ACCORDANCE WITH THE APPROVED PLANS AND SPECIFICATIONS. DATE INSPECTION 1. IRRIGATION CONSTRUCTION PRIOR TO BACKFILL 2. PLANT MATERIAL PRIOR TO INSTALLATION 3. FINISH GRADE PRIOR TO SEEDING 4. IRRIGATION COVERAGE TEST 5. COMPLIANCE WITH APPROVED PLANS THE CITY OF FONTANA LANDSCAPE TECHNICIAN WILL CONDUCT THE FINAL LANDSCAPE INSPECTION AFTER RECEIPT OF THIS CERTIFICATION. (NOTIFICATION OF 48 HOURS IS REQUIRED.) REV. REVISION DESCRIPTION DATE BY CITY DATE 1 REVISED PER CFTY PLAN CHECK COMMENTS 9/11/09 xn h �a �ry a ry o ti A\, ti • rmeasa h h � � a 3 KE MAP SCALE = N.T.S. w > w > ¢ w M U ¢ w o Q �- til w !Z U U JURUPA AVE VILLAGE DR. rj Q 04 _j ,q j� - ALPINE DRIVE WILL NEAP SCALE N.T.S. �� •i:zt VICINITY SHOULD CONSTRUC TION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDI TIONS AND STANDARDS IN EFFECT. MADOLE1455 AUTO CENTER DRIVE SUITE 200 ONTARIO, CA 91761 t 909.937.9151 Engineering Communities for Life www.madolainc.com A�OSCAP Lo1vl�q��y w B �O •,�► n -J E!t RE ~1 09130110 EXP. DATE `rte 12 09 09 'tib DATE F DE CAL�FO PREPARED FOR: KB HOME COASTAL, Inc. - RIVERSIDE DIVISION 36310 INLAND VALLEY DRIVE WILDOMAR, CA. 92595 PHONE / FAX: (951) 691-5257 / (951) 677-2190 CONTACT: ERIC SCHECK PREPARED BY: WETLAND &ASSOCIATES INC. 8075 BLUE LAKE DRIVE SAN DIEGO, CA 92113 PHONE / FAX: (619) 742-0209 / (619) 303-6831 CONTACT: JOHN ONALLEY CIVIL ENGINEER OF RECORD: MADOLE &ASSOCIATES INC, 1455 AUTO CENTER DRIVE, SUITE 200 ONTARIO, CA 91761 PHONE / FAX: (909) 937-9151 / (909) 937-9152 CONTACT: LEO PACIS SHEET INDEX: TITLE SHEET IRRIGATION PLAN IRRIGATION DETAILS IRRIGATION NOTES PLANTING PLAN PLANTING DETAILS PLANTING NOTES �� 'ter �.•`f Iv1\DSCAPE AItCkI'PFECTi' i` CQ�STRUCTION AU NAGE3IENT 8073 BLUE LAKE DRIVE 'SAZ,DIEGO, CA 92119 PHONE; (619) 742-0209 FAX: (619) 303-6831 E-31AIL: ODAJOHNQCOX.N ET CORPORATE OFFICE 291 SIERRA WAVE SWALL 31EADOWS, CA 93314 PHONE: (760) 214-1870 FAX; (858) 486.4939 LT -01 LI-Ol LI -02 - LI -03 LI -04 LP -01 LP -02 LP -03 LANDSCAPE CONSTRUCTION PLANS FON TANA, CA DRAWN KY. s�LE: BONITA CANYON - TRACT 14244 SEE PLA N DESIGNED BY. CFD SLOPE AREA DATE: JO 09/11/09 CHECKED BY: DRAWING NO. J0 0 - - - - ----- C(4 -7e Odead ee i2 7 -ca. S85Z 8 08/12/09, 09/11/09,12/09/09