HomeMy WebLinkAbout4834-11.
2.
3.
:qI
5.
6.
7.
9.
10.
11.
12.
13.
14.
15.
16.
ARE HEREBY MADEA PART HEREOF.
REVISION DESCRIPTION
PRIOR TO THE START OF GRADING, ALL EXISTING VEGETATION AND DEBRIS,
BY CITY DATE
INCLUDING EXI57INGSTRUC7URES, FOOTINGS, FOUNDATIONS, RUBBLE, TREES,
REVISED PER CFTY PLAN CHECK COMMENTS
AND ROOT SYSTEMS, SHALL BE REMOVED FROM 7HESITE TO THE
9/11/09
SA775FACTIONOFTHE SOILS ENGINEER.
IMPORTANT NOTICE:
AFTER STRIPPING EXISTING DEBRIS, ANY DfIST7NGLOOSE FILL OR DISTURBED
SECTION 4216/4217 OF THE GOVERNMENT CODE REQUIRES A DIG ALERT IDENTIFICATION NUMBER TO
NATURAL SOILS SHALL BE00AVATED TO THE SA77SFAC77ONOFTHE SOILS
BE ISSUED BEFORE A PERMIT TO EXCAVATE WILL BE VALID. FOR YOUR DIG ALERT ID NUMBER CALL
ENGINEER.
UNDERGROUND SERVICE ALERT. THE TOLL FREE NUMBER IS (800) 422-4133 TWO WORKING DAYS
BEFORE YOU DIG.
THE EXPOSED SOILS SHALL THEN BE INSPECTED BY THE SOILS ENGINEER,
ANDANYADDITIONAL OVER -EXCAVATION SHALL 7HENBEMADEIN
THE CITY OF FONTANA LANDSCAPE TECHNICIAN WILL CONDUCT A FINAL LANDSCAPE INSPECTION
ACCORDANCE WITHTHE SOILS ENGINEERS RECOMMENDA77ONAND AS
UPON RECEIPT OF THE LANDSCAPE ARCHITECT'S CERTIFICATION AND INSPECTION FORM. (48 HOUR
CONTAINED IN THE SOILS REPORT
NOTIFICATION REQUIRED). CALL (909) 350-6649
THEEXPOSED SOILS SHOULD THEN BESCA RIFIED TO A MINIMUM DEPTH OF
6INCHES, BROUGHT TO PROPER MOISTURECONTENTAND COMPACTED TO
ATLE45T90 % OF THE MWMUMDENSITY OBTAINABLE BYTHE A.S.T..M.
INSPECTIONS:
0-1557-70 METHOD OF COMPAC 17ON TO ATTAINA DENSEAND UNYIELDING
COND1770N.
THE CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT 48 HOURS IN ADVANCE OF ALL
COMPA C77ON SHALL BE OBTAINED B Y METHODS A PPRO VED B Y THE SOILS
REQUIRED SITE REVIEWS AS FOLLOWS:
ENGINEER.
1. PRE -CONSTRUCTION MEETING
2. IRRIGATION SYSTEM REVIEW PRIOR TO BACK FILL
IFANYUNKNOWNSUBSURFACE 57RUCTURESARE ENCOUNTERED
3. SOIL PREPARATION
DURINGCONSTRUC770N, THEYSHALL BEIMMEDIATEL YBROUGHT TO THE
4. PLANT MATERIAL PRIOR TO INSTALLATION
A77EN770N OF THE SOILS ENGINEER PRIOR 70 PROCEEDING.
S. IRRIGATION COVERAGE TEST
6. COMPLIANCE WITH PLANS
DUSTSHALL BE CONTROLLED BY WATERING THROUGHOUT THE GRADINGAND
FAILURE TO NOTIFY THE LANDSCAPE ARCHITECT AND OBTAIN APPROVAL WILL HOLD THE
BUILDING CONS7RUC7IONOPERA 77ONS.
CONTRACTOR LIABLE FOR ANY CHANGES REQUIRED. IT IS THE CONTRACTOR'S RESPONSIBILITY TO
COORDINATE THE WORK SO THE ENTIRE PHASE IS READY FOR EACH OF THE LISTED REVIEWS AT ONE
PRO7EC7IVE MEASURES SHALL BE TAKEN BY THE CONTRACTOR TO PROTECT'
SITE VISIT.
ADJACENT PROPERTYATALL 77MES DURING 0007RUCTION. PR07EC MIE
MEASURES SHALL BE TAKEN BY THE COh 7RACTOR SO AS NOT TO GA USE
ANYMUD, SILT OR DEBRIS ONTO PUBLIC OR
ADJACENTPROPERTY. ANY MUD ORDEBRIS ONPUBL.ICPROPERTYSHALLBE
CITY REQUIRED NOTES
REMOVED IMMEDIATELY.
INSPECTIONS:
ALL GRADINGAND FILLING OPERA77ONSSHALL BE OBSERVED, INSPECTED
1. IT IS THE LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE ENGINEERING
AND TESTED BYA LICENSED SOILS ENGINEER
DIVISION'S LANDSCAPE INSPECTOR 48 HOURS PRIOR TO THE DESIRED INSPECTION OF AN ITEM
APPROVED BY THE OWNER, AND COMPACTION REPORTS PROVIDED FOR CITY
AT (909) 350-6632,
APPROVAL,
2. PRIOR TO RELEASE OF UTILITIES OR MAINTENANCE PERIOD COMMENCEMENT OF THE FOLLOWING
PRIOR TO THE START OFANYBUILDINGCONS7RUCTION, THECONTRACTOR
INSPECTIONS ARE REQUIRED.
2.1. PRE -CONSTRUCTION INSPECTION
SHALL FURNISH THE ARCHIT , OWNER AND THE CTTY WITH THE CIVIL
2.2• INSPECTION OF IRRIGATION SYSTEM IN AN OPEN TRENCH CONDITION (PRIOR TO BACKFILL).
ENGINEERS WRITTEN OPINION THATAPPROVED PLANSAND COMPACTION
MAINLINE PRESSURE TEST AT 150 PSI FOR A THREE (3) HOUR CONTINUOUS PERIOD.
REPORTS FROM THE SOILS
ENGINEER THAT THE PROPER COMPACTIONAND PREPARA770N HAS BEEN
2.3. IRRIGATION COVERAGE TESTS INCLUDING INITIAL AND FINAL TESTS.
OBTAINED.
2.4. FINISH GRADE PRIOR TO PLANTING.
2,5. PLANT MATERIALS PRIOR TO PLANTING AND SOIL PREPARATION.
NO GRADING SHALL COMMENCE WITHOUT OBTAINING GRADING PERMITAND
2,6. PLANTING, INCLUDING STREET TREES, CONTACT THE PARKS PLANNING AND LANDSCAPE
N077FYING GRADING INSPECTOR 24 HOURS PRIOR TO
DEVELOPMENT SECTION, ENGINEERING DMSION, FOR THE SPECIES AND FINAL LOCATIONS.
THE START OF WORK.
2.7. COMPLIANCE WITH APPROVED PLANS.
2.8. FINAL INSPECTION.
PRIOR TO 7NECOMPLETION OF THIS CONTRACT; 7HECON RACTORSHALL
3. THE OWNER'S REPRESENTATIVE AND LANDSCAPE CONTRACTOR SHALL BE PRESENT AT EACH
OBTAINCOMPACTIONREPORTSFROM THE SOILS ENGINEER 7HA T 77YE PROPER
INSPECTION.
SUBGRADE COMPACTION HAS BEEN OBTAINED AND SHALL FURNISH SAID .
REPORTS TO THE OWNER FOR APPROVAL.
771E CONTRACTOR SHALL BE RESPONSIBLE TO REPORT DISCREPANCIES IN
PLANSAND/OR FIELD CONOTUONSIMMEDIAW Y TO THE DESIGN ENGINEER
FOR RESOLUTIONS PRIOR TO CONSMUC770N, AND SHALL BE RESPONSIBLE
FOR DISCREPANCIES NOT SO REPOR7FD AND RESOLVED.
ALL MANUFACTURED SLOPESARE2(H): 1(V) UNLF-55 07HERWISENOTED ON
7HE PLANS. NO SLOPES SHALL BE CONSTRUCTED STEEPER THAN 2(H):
1(v),
1z SEE THE DIMENSION CONTROL PLAN FOR PREC7SEHORIZONTAL CONTROL
DATA.-CURVEDATA, BEARINGS, DISTANCES. ETC.
18. PRIOR TO THE COMPLE7I0N OF T 75 CONTRACT, THE CONTRACTOR SHALL
OBTAIN THE CIVIL ENGINEER S WRITTEN OPINION THA THE PROPER
SUBGRADE ELEVA77ONS HAVE BEEN OBTAINED AND SHALL FURNISH SAID
WRITTEN OPINION TO THE OWNER FOR APPROVAL,
19. MINIMUM GRADES SHALL BE.,
(A) CONCRETE STRUCTURES, "V"GUTTFRS. CURB AND GUTTER, ETC = a50%
(B) ASPHALT, TURF. GRADED SOIL ETC. =1.0%
20. CONTRACTOR SHALL IMPLEMENT SAND BAG EROSION CONTROL MF4SURES AS
NECESSARY TO PROTECT THE GRADING OPERA 77ONS A ND ADJACENT PROPERTY.
EROSION CON7ROL MEASURES TO BEIMPLEMENTED IN ACCORDANCE WITH
CHAPTER 33 OF THE CALIFORNIA BUILDING CODE, 2001 EDITION.
21. ALL TRENCH BACKFILL TO BE CER7TFIED BYSOILS ENGINEER,
22. CITY OF FONTANA UTILITY N077FICA77ON LIST
CITY OF FONTANA PAC7FIC BELL CO. CRAWFORD CANYON MUTUAL WA7FR CO.
AT7N: CARLOS NAVARR0 A7TN: NORMA GUILLOT AT77V.• BASIL J, FABRI270
8353 SIERRA AVENUE 1265N. VAN BUREN STREET (909) 463-9580
FONTANA, CA 92335 SUITE 180
(909) 350-6632 ANAHEIM, G4 92807 UNDERGROUND SERVICEALERT
(714)666-5401 (800) 422-4133
SO. CALIFORNIA GAS COMPANY COMC45T (CABLE T V) WEST SAN BERNARDINO WATER CO.
ATTN• GREG GASPAR A777V.• JACK HAYES 1205 AT7N,• LON 75M
16231 VALLEYBLVD. DUPONTAVENUEONTARIO, CA. 91761 855 W. WELINE ROAD
FONTANA, G4.92335 (909) 390-4736 RML70, CA 92377
(909) 428-8411
EMERGENCIES- (600) 427-2200 VERIZON
ATTN. 57EVE HOCK
50, CALIFORNIA EDISON COMPANY 1400 F PHILLIPS BLVD.
7951 REDWOOD AVE. POMONA, 04.91766
FONTANA, C4 92335 (909) 469-6327
(909) 820-5598 - UNDERGROUND
(909) 875-5100 - 77Z40MISSIONS FONTANA WA7FR COMPANY
(213) 637-1233 - PIPELINES ATTN.'MICHAEL J. MCGRAW
(909) 357-6233 - D2S-WBM0N 8440 NUEVO AVENUE
FONTAIK CA 92335 (909)
822-2201 FAX- (909)
823-5046
23. ALL GRADING SHALL CEASE DURING PERIODS OF WINDS IN EXCESS OF 25 MPH.
SITESHALL BE KEPT CON77NUDUSLY WA7FRED DURING PERIODS OF HIGH WINDS
TO PREVENT AIRBORNE EROSION.
TOLL FREE 1-800-227-2600
A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT
112
AM
CFD
{# 1, 7.L%>'��, 7 '
D 0
C U M E N T%wp
NO N 1424�y.
ffia n
IlNj TH�EUITY
C [=uNTAl\jA
i'
1.
CA. -
DATE: TRACT:
LOTS:
DESIGN REVIEW:
THIS FORM IS TO CERTIFY THAT THE LANDSCAPE WORK HAS BEEN COMPLETED IN
ACCORDANCE WITH THE APPROVED PLANS AND SPECIFICATIONS.
DATE INSPECTION
1. IRRIGATION CONSTRUCTION PRIOR TO BACKFILL
2. PLANT MATERIAL PRIOR TO INSTALLATION
3. FINISH GRADE PRIOR TO SEEDING
4. IRRIGATION COVERAGE TEST
5. COMPLIANCE WITH APPROVED PLANS
THE CITY OF FONTANA LANDSCAPE TECHNICIAN WILL CONDUCT THE FINAL
LANDSCAPE INSPECTION AFTER RECEIPT OF THIS CERTIFICATION. (NOTIFICATION
OF 48 HOURS IS REQUIRED.)
REV.
REVISION DESCRIPTION
DATE
BY CITY DATE
1
REVISED PER CFTY PLAN CHECK COMMENTS
9/11/09
xn
h
�a
�ry
a
ry
o ti
A\,
ti •
rmeasa h h � �
a
3
KE MAP SCALE = N.T.S.
w
>
w > ¢
w
M
U ¢
w o Q �-
til w !Z U U
JURUPA AVE
VILLAGE DR.
rj
Q
04 _j
,q
j� - ALPINE DRIVE WILL
NEAP SCALE N.T.S.
�� •i:zt
VICINITY
SHOULD CONSTRUC TION OF THE REQUIRED IMPROVEMENTS NOT
COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL
SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER,
THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO
BRING THEM INTO CONFORMANCE WITH CONDI TIONS AND
STANDARDS IN EFFECT.
MADOLE1455 AUTO CENTER DRIVE
SUITE 200
ONTARIO, CA 91761
t
909.937.9151
Engineering Communities for Life www.madolainc.com
A�OSCAP
Lo1vl�q��y
w B �O •,�►
n
-J E!t RE ~1
09130110
EXP. DATE
`rte 12 09 09 'tib
DATE
F DE
CAL�FO
PREPARED FOR:
KB HOME COASTAL, Inc. - RIVERSIDE DIVISION
36310 INLAND VALLEY DRIVE
WILDOMAR, CA. 92595
PHONE / FAX: (951) 691-5257 / (951) 677-2190
CONTACT: ERIC SCHECK
PREPARED BY:
WETLAND &ASSOCIATES INC.
8075 BLUE LAKE DRIVE
SAN DIEGO, CA 92113
PHONE / FAX: (619) 742-0209 / (619) 303-6831
CONTACT: JOHN ONALLEY
CIVIL ENGINEER OF RECORD:
MADOLE &ASSOCIATES INC,
1455 AUTO CENTER DRIVE, SUITE 200
ONTARIO, CA 91761
PHONE / FAX: (909) 937-9151 / (909) 937-9152
CONTACT: LEO PACIS
SHEET INDEX:
TITLE SHEET
IRRIGATION PLAN
IRRIGATION DETAILS
IRRIGATION NOTES
PLANTING PLAN
PLANTING DETAILS
PLANTING NOTES
�� 'ter �.•`f
Iv1\DSCAPE AItCkI'PFECTi' i` CQ�STRUCTION AU NAGE3IENT
8073 BLUE LAKE DRIVE 'SAZ,DIEGO, CA 92119
PHONE; (619) 742-0209 FAX: (619) 303-6831
E-31AIL: ODAJOHNQCOX.N ET
CORPORATE OFFICE
291 SIERRA WAVE SWALL 31EADOWS, CA 93314
PHONE: (760) 214-1870 FAX; (858) 486.4939
LT -01
LI-Ol
LI -02 - LI -03
LI -04
LP -01
LP -02
LP -03
LANDSCAPE CONSTRUCTION PLANS
FON TANA, CA
DRAWN KY. s�LE:
BONITA CANYON - TRACT 14244 SEE PLA N
DESIGNED BY. CFD SLOPE AREA DATE:
JO 09/11/09
CHECKED BY: DRAWING NO.
J0 0
- - - - ----- C(4 -7e Odead ee i2 7 -ca. S85Z 8
08/12/09, 09/11/09,12/09/09