HomeMy WebLinkAbout4083-1-A Nlw'F"F D S CA F EA
AOR
TRACT NOm 1 6723
COMMUNITY FACILITIES DISTRICT
FONTANA.,
CALIFORNIA
HOMES
r I .. ow— . — — F'V��
(R)JR, o !�, V7j (f DIM [rrJ, U/J P)I/i FA MTk F/ � L*
PROJECT
LOCATION
WNNUf AVE
ac
BASELINE AVENUE
VICINITY MAP.
N7$
SITE LAYOUT PLAN
(D
N.T.S.
INSPECTIONS:
1. IT IS THE LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO CONTACT
THE ENGINEERING DIVISION'S LANDSCAPE INSPECTOR 48 HOURS
PRIOR TO DESIRED INSPECTION OF AN ITEM AT (909) 350-6633
2. PRIOR TO RELEASE OF UTILITIES OR MAINTENANCE PERIOD
COMMENCEMENT THE FOLLOWING ARE REQUIRED:
PRE -CONSTRUCTION INSPECTION
INSPECTION OF IRRIGATION SYSTEM IN OPEN TRENCH CONDITION
(PRIOR TO BACKFILL). MAINLINE PRESSURE TEST AT 150 PSI FOR A
THREE (3) HOUR CONTINUOUS PERIOD.
IRRIGATION COVERAGE TESTS INCLUDING INITIAL AND FINAL.
FINISH GRADE PRIOR TO PLANTING
PLANT MATERIALS PRIOR TO PLANTING AND SOIL PREPARATION.
PLANTING, INCLUDING STREET TREES. CONTACT THE PARKS PLANNING
AND LANDSCAPE DEVELOPMENT SECTION, ENGINEERING DIVISION, FOR
SPECIES AND FINAL LOCATIONS.
COMPLIANCE WITH APPROVED PLANS.
FINAL INSPECTION.
3. THE OWNER'S REPRESENTATIVE AND LANDSCAPE CONTRACTOR SHALL BE
PRESENT AT EACH INSPECTION.
SHEET INDEX
1. TITLE SHEET
2, CONSTRUCTIDN LAYOUT PLAN
3, CONSTRUCTION LAYOUT PLAN
4, IRRIGATION PLAN
5, IRRIGATION PLAN
6. TREE PLANTING PLAN
7, TREE PLANTING PLAN
8, SHRUB PLANTING
9. SHRUB PLANTING
10. IRRIGATION CONSTRUCTION DETAILS
11. PLANTING CONSTRUCTIDN DETAILS
& WATER CALCULATIONS