Loading...
HomeMy WebLinkAbout4083-1-A Nlw'F"F D S CA F EA AOR TRACT NOm 1 6723 COMMUNITY FACILITIES DISTRICT FONTANA., CALIFORNIA HOMES r I .. ow— . — — F'V�� (R)JR, o !�, V7j (f DIM [rrJ, U/J P)I/i FA MTk F/ � L* PROJECT LOCATION WNNUf AVE ac BASELINE AVENUE VICINITY MAP. N7$ SITE LAYOUT PLAN (D N.T.S. INSPECTIONS: 1. IT IS THE LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE ENGINEERING DIVISION'S LANDSCAPE INSPECTOR 48 HOURS PRIOR TO DESIRED INSPECTION OF AN ITEM AT (909) 350-6633 2. PRIOR TO RELEASE OF UTILITIES OR MAINTENANCE PERIOD COMMENCEMENT THE FOLLOWING ARE REQUIRED: PRE -CONSTRUCTION INSPECTION INSPECTION OF IRRIGATION SYSTEM IN OPEN TRENCH CONDITION (PRIOR TO BACKFILL). MAINLINE PRESSURE TEST AT 150 PSI FOR A THREE (3) HOUR CONTINUOUS PERIOD. IRRIGATION COVERAGE TESTS INCLUDING INITIAL AND FINAL. FINISH GRADE PRIOR TO PLANTING PLANT MATERIALS PRIOR TO PLANTING AND SOIL PREPARATION. PLANTING, INCLUDING STREET TREES. CONTACT THE PARKS PLANNING AND LANDSCAPE DEVELOPMENT SECTION, ENGINEERING DIVISION, FOR SPECIES AND FINAL LOCATIONS. COMPLIANCE WITH APPROVED PLANS. FINAL INSPECTION. 3. THE OWNER'S REPRESENTATIVE AND LANDSCAPE CONTRACTOR SHALL BE PRESENT AT EACH INSPECTION. SHEET INDEX 1. TITLE SHEET 2, CONSTRUCTIDN LAYOUT PLAN 3, CONSTRUCTION LAYOUT PLAN 4, IRRIGATION PLAN 5, IRRIGATION PLAN 6. TREE PLANTING PLAN 7, TREE PLANTING PLAN 8, SHRUB PLANTING 9. SHRUB PLANTING 10. IRRIGATION CONSTRUCTION DETAILS 11. PLANTING CONSTRUCTIDN DETAILS & WATER CALCULATIONS