Loading...
HomeMy WebLinkAbout4877-54N,0 CY)_ -� Z oZ X o m �o (D 0 To V 0 X 0 It0 M O I 0 I Z 0 X I v N I 0 a f CONSTRUCTION SCHEDULE 1 Existing Street Light 2 Existing Fire Hydrant 3 Existing concrete sidewalk 4 Existing 42" dia. water line per San Gabriel Valley Water District 5 Existing palms 6 Temporary 5' high tubular steel fence by Aineristar or equal. Fence to be black and located 6" inside property lime until which time the perimeter fence/ wall final design and layout can be 703 9 plotting. Final perimeter fencing shall be in compliance with mitted as a separate "Fence & Wall Plan" FOR CONSTRUCTION NOTES & LEGEND SEE SHEET L8 H.O.A. entry plans prepared by Sitescapes. a; color to be 'Sierra'. is of "stacked" brick border, color to be Terra cotta. ible stacked brick" # 18-1-202. ;et Print" (888) 581-2299. . plans. medium broom finish e Tan" by L.M. Scofield with Topcast #3 sandblast finish. Apply per n" #GARBELLA26 by Garden Art International (800) 500-8004. Parkhouse Drive Entry. statural concrete color Topcast #5 "Sandblast" finish by Grace Decorative Plans S ;Fractured) 'Apache Brown' decorative rock from Southwest Boulder & Stone :d over native soil. Provide 5 1/2" 'Permaloc' aluminum headerboard (Black) on all ✓Ifg. Specs. - See Detail 4, Sheet L8. arate package by Sitescapes. .13, Sheet L-8 natural Concrete" with T-2 light sandblast finish, unless otherwise indicated. color to be #300 'Harvest' by Angelus Block (909) 328-9115. Provide natural tive at citrus grove. See sheet L-15 for spec. SCALE 1"_10� N0. REVISION Q 10- I4-10 - PLAN CHECK 114 CHK W JOB # OS -019 L4 OF 25 ZU W �' o 1-- z 0 O H� Z �Z W � z� U W �. OO S C A,p P pl H,f 2782 o: iATURE DANro �Q oa,.a�'``OQ``' �F CA�-�� DVM CHK DATE 9/7/10 JOB # OS -019 L4 OF 25 I t�