HomeMy WebLinkAbout4877-54N,0
CY)_
-� Z
oZ X
o m
�o
(D 0
To
V
0
X
0
It0
M
O
I
0
I
Z
0
X
I
v
N
I
0
a
f
CONSTRUCTION SCHEDULE
1 Existing Street Light
2 Existing Fire Hydrant
3 Existing concrete sidewalk
4 Existing 42" dia. water line per San Gabriel Valley Water District
5 Existing palms
6 Temporary 5' high tubular steel fence by Aineristar or equal. Fence to be black and located 6"
inside property lime until which time the perimeter fence/ wall final design and layout can be
703 9 plotting. Final perimeter fencing shall be in compliance with
mitted as a separate "Fence & Wall Plan"
FOR CONSTRUCTION NOTES & LEGEND SEE SHEET L8
H.O.A. entry plans prepared by Sitescapes.
a; color to be 'Sierra'.
is of "stacked" brick border, color to be Terra cotta.
ible stacked brick" # 18-1-202.
;et Print" (888) 581-2299.
. plans.
medium broom finish
e Tan" by L.M. Scofield with Topcast #3 sandblast finish. Apply per
n" #GARBELLA26 by Garden Art International (800) 500-8004.
Parkhouse Drive Entry.
statural concrete color Topcast #5 "Sandblast" finish by Grace Decorative
Plans
S
;Fractured) 'Apache Brown' decorative rock from Southwest Boulder & Stone
:d over native soil. Provide 5 1/2" 'Permaloc' aluminum headerboard (Black) on all
✓Ifg. Specs. - See Detail 4, Sheet L8.
arate package by Sitescapes.
.13, Sheet L-8
natural Concrete" with T-2 light sandblast finish, unless otherwise indicated.
color to be #300 'Harvest' by Angelus Block (909) 328-9115. Provide natural
tive at citrus grove. See sheet L-15 for spec.
SCALE
1"_10�
N0. REVISION
Q 10- I4-10 - PLAN CHECK
114
CHK
W
JOB #
OS -019
L4
OF 25
ZU
W
�'
o
1--
z
0
O
H�
Z
�Z
W
�
z�
U
W
�. OO S C A,p
P pl H,f
2782
o:
iATURE
DANro �Q
oa,.a�'``OQ``'
�F CA�-��
DVM
CHK
DATE 9/7/10
JOB #
OS -019
L4
OF 25
I t�