HomeMy WebLinkAbout3730-1GENERAL NOTES
1. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF
FONTANA STANDARD PLANS, THE CONTRACT PROVISIONS AND THE
STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ("GREEN
BOOK"). ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL BE THE
LATEST EDITION UNLESS OTHERWISE NOTED.
2. WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT
DOCUMENTS THAT CAN NOT BE RESOLVED BY REFERENCE TO PRECEDENCE
PROVISIONS IN THE "GREEN BOOK" THE CONTRACTOR SHALL IMMEDIATELY
REPORT SAID CONFLICT THE CITY ENGINEER FOR RESOLUTION.
3. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE
CITY ENGINEER.
4. ADVANCE CONSTRUCTION SIGNING INDICATING DURATION OF PROJECT
SHALL BE IN PLACE ONE WEEK PRIOR TO IMPLEMENTING DETOURS.
5. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF
FONTANA COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION
PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL
BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF
ANY WORK IN PUBLIC RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL
(909) 350-7610.
6. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES,
METHODS AND PROCEDURES DESCRIBED IN THE STATE OF CALIFORNIA
MANUAL OF TRAFFIC CONTROLS, LATEST NON -METRIC EDITION UNLESS
OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER.
7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN
BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL
TIMES.
8. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION
OR TRENCH WORK FOR TRENCHES 5 FEET OR GREATER IN DEPTH FROM
THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY.
9. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5)
FEET IN DEPTH SHALL BE GUARDED BY SHORING, SLOPING OF THE
GROUND OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS
OF THE DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA.
TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED ' WHEN
THE POTENTIAL EXISTS FOR GROUND MOVEMENT.
10. NO MATERIAL. OR EQUIPMENT SHALL BE STORED IN THE PUBLIC
RIGHT OF WAY WITHOUT OBTAINING A SEPARATE PERMIT FOR THAT
PURPOSE.
11. THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM
AVAILABLE INFORMATION, HOWEVER, IT SHALL BE THE RESPONSIBILITY OF
THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND
THE ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER
PRECAUTION TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL
CONTACT UNDERGROUND SERVICE ALERT AT 1-800-227-2600 Two
WORKING DAYS BEFORE EXCAVATION.
12. THE CONTRACTOR SHALT. COORDINATE CONSTRUCTION WITH ALL UTILITY
COMPANIES INCLUDING, BUT NOT LIMITED TO, GAS, TELEPHONE, ELECTRIC,
CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER,
RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRANS.
ALL UTILITY COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE
PRIOR TO WORK AROUND THEIR FACILITIES.
13. THE CONTRACTOR SHAD. NOT OPERATE ANY FIRE HYDRANT OR
WATER MAIN VALVES WITHOUT APPROPRIATE AGENCY AUTHORIZATION.
CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY
FOR VALVE OPERATION AND WATER REQUIREMENTS.
14. STATIONING REFERS TO THE CENTERLINE OF STORM DRAIN EXCEPT
WHERE; OTHERWISE NOTED.
15. ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE
ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK TO
THE PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE
PRESERVATION OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING
DURING CONSTRUCTION.
16. THE CONTRACTOR SHALL. NOT DISTURB EXISTING SURVEY MONUMENTS,
MONUMENT TIES OR BENCHMARKS WITHOUT PRIOR NOTIFICATION TO THE
CITY ENGINEER.
17. REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING
SURVEY MONUMENTS, MONUMENT 71ES AND BENCHMARKS, SHALL BE DONE
BY A REGISTERED CML ENGINEER OR LICENSED LAND SURVEYOR.
SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS
CONS17RUCTION SHALL BE REPLACED. THE CONTRACTOR SHALL NOTIFY
THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO
MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE
MONUMENT.
18. THE CONTRACTOR SHALL. MAINTAIN ACCESS FOR LOCAL RESIDENTS AND
BUSINESSES AT ALL TIMES, A MINIMUM 12 FOOT LANE SHALL BE
MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDENTS
AND EMERGENCY VEHICLES.
19. THE CONTRACTORS SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS
OF DUST CONTROL, INCLUDING ADEQUATE WATERING, AT ALL TIMES.
20. THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD,
SILT OR DEBRIS TO BE DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY
ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT PRIOR
WRITTEN APPROVAL.
21. NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL
OF THE CITY INSPECTOR.
22. A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION.
FAILURE TO OBTAIN THE REQUIRED DENSITY SHALL REQUIRE RE -WORKING
OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED DENSITY IS
OBTAINED.
23. CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES
FROM UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF THE
SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY NON-ERODEABL.E
SWALES ENTERING OR LEAVING IMPROVEMENTS.
24. ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE,
COLOR AND FINISH TO MATCH EXISTING CONCRETE.
25. NO OPEN TRENCH SHALL BE ALLOWED AT THE END OF THE DAY
WITHOUT PRIOR APPROVAL OF THE CITY ENGINEER.
26. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL EXPOSE EXISTING
FACILITIES, AND VERIFY ELEVATION AND LOCATION OF CONNECTIONS. CITY
APPROVAL OF CONNECTIONS TO EXISTING FACILITIES DOES NOT IMPLY
CORRECTNESS OF ELEVATIONS OR LOCATIONS SHOWN ON THE PLANS.
27. IF EXISTING UTILITIES OR ANY OTHER FACILITIES CONFLICT WITH THE
PROPOSED IMPROVEMENTS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER
AND ALL AFFECTED AGENCIES IMMEDIATELY.
28. NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING
STEEL HAVE BEEN PLACED, INSPECTED AND APPROVED.
29. ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND
APPROVED PRIOR TO PAVING OF STREETS.
30. APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT
PAVEMENT PRIOR TO PLACEMENT.
31. ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL
BE RAISED TO FINISHED GRADE BY THE PAVING CONTRACTOR UPON
COMPLETION OF PAVING.
32. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL. RESTORE
ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC CONTROL
DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER.
33. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE
ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS TO
THE CITY ENGINEER.
34. MINIMUM D -LOAD FOR ALL RCP IS 1350.
CITY OF FONTANA. UTILITY NOTIFICATION LIST
CITY OF FONTANA
PACIFIC BELL CO.
8353 SIERRA AVENUE
3939 E. CORONADO STREET
FONTANA, CA 92335
ANAHEIM, CA 92807
ATTN: BRIAN WREN
SEWER MANHOLE
(909) 350-6632
(714) 666-5467
SO. CALIF. GAS COMPANY
COMCAST CABLE TV )
1981 W. LUGONIA AVENUE
1205 DUPONT AVE.
REDLANDS, CA 92374
ONTARIO, CA 91761
(909) 335-7547
(909) 390-4738
EMERGENCIES: (800) 427-2200
0
CRAWFORD CANYON MUTUAL WATER CO.
SO. CALIF. EDISON COMPANY
ATTN: BILL VANDERKIEFT, JR.
300 N. PEPPER AVENUE
(619) 868-6040
RIALTO, CA 92376
909 820-5598 - UNDERGROUND
GENERAL TELEPHONE COMPANY
909 875-5100 - TRANSMISSION
1400 E. PHILIPS BLVD.
213 637-1233 - PIPELINES
ONTARIO, CA 91766
909 357-6223 - DISTRIBUTION
FONTANA WATER COMPANY
8440 NUEVO AVENUE
FONTANA CA 92235
(909) 822-2201
FAX: (909) 823-5046
PRIVATE ENGINEER'S NOTICE TO CONTRACTOR:
THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES AND OR STRUCTURES
SHOWN ON THESE PLANS WERE OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS.
THESE LOCATIONS ARE APPROXIMATE AND SHALL BE CONFIRMED BY THE CONTRACTOR,
SO THAT ANY NECESSARY ADJUSTMENT CAN BE MADE IN ALIGNMENT AND/OR GRADE
OF THE PROPOSED IMPROVEMENT. THE CONTRACTOR IS REQUIRED TO TAKE DUE
PRECAUTIONARY MEASURES TO PROTECT ANY UTILITY LINES SHOWN AND ANY OTHER
LINES NOT ON RECORD OR NOT SHOWN ON THESE PLANS.
CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED
CONSTRUCTION PRACTICES, HE WILL BE REQUIRED TO ASSUME
SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE
OF CONSTRUCTION OF THE PROJECT, INCLUDING THE SAFETY OF ALL PERSONS AND
PROPERTY. THIS REQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLY AND
NOT BE LIMITED TO NORMAL WORKING HOURS. CONSTRUCTION CONTRACTOR FURTHER
AGREES TO DEFEND, INDEMNIFY AND HOLD DESIGN PROFESSIONAL HARMLESS FROM ANY
AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF
WORK ON THIS PROJECT, EXCEPTING LIABILITY ARISING FROM THE SOLE NEGLIGENCE
OF THE DESIGN PROFESSIONAL.
UNAUTHORIZED CHANGES AND USES:
THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR OR LIABLE
FOR, UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS. ALL CHANGES TO THE
PLANS MUST BE IN WRITING AND MUST BE APPROVED BY THE PREPARER OF THESE PLANS.
DOUBLE COURSE
4" X 8" BRICK
AND MORTAR PLUG
SECTION A -A.
BRICK AND
MORTAR PLUG
RCP
SECTION B -B,
DOUBLE BRICK AND MORTAR PLUG
TYPICAL FOR ALL DIAMETERS
N.T.S.
CITY OF FONTANA
TRACT NO,. 16563
STORM DRAIN PLAN
WALNUT STREET
APN 240-05-10
APN 240-05-11
APN 240-05-13
APN 240-05-14
APN 240--;-05 '19
16383
TTM W.
Q- INSTALL 24" RCP (D-1400)
o- INSTALL 36" RCP (0-1400)
O- CONSTRUCT MANHOLE PER A.P.W.A SID PLAN 322-1
O4-
CONSTRUCT JUNCTION STRUCTURE PER A,P.W.A STD PLAN 340-1
(D -INSTALL BRICK AND MORTAR PLUG PER DETAIL SHOWN
O7 -CONSTRUCT 6' HIGH CHAIN LINK FENCE PER APWA STD PLAN 600-1
O8 -CONSTRUCT 2-8' WIDE CHAIN LINK FENCE PER APWA STD PLAN 600-1
O9 -CONSTRUCT CONCRETE SPILLWAY (SEE SHEEP 5)
f0 - INSTALL CSP FLARED INLET PER APWA PLATE j 351-1, CASE 2
11 -CONSTRUCT 12" PVC SDR 35 DISCHARGE PIPE
12 - CONSTRUCT PARKWAY DRAIN PER APWA 151-1 (SEE SHEEP 5)
13 - CONSTRUCT MANHOLE PER APWA STD PLAN 320-1
14 -REMOVE 8" CURB & GUTTER FOR PARKWAY DRAIN
@ - REMOVE &REPLACE RESIDENTIAL DRNEWAY APPROACH
@-PROTECT IN PLACE
17 - REMOVE AND REPLACE WATER METER CURBSIDE
18 -PROVIDE ACCESS TO PROPERTY OWNERS AT ALL TIMES
amomaacaaaaaaa�mmaaaaaasaa�a --
APN 240-05-21
50 LF
238 LF
1 EA
1 EA
2 EA
475 LF
2 EA
1 EA
1 EA
200 LF
1 EA
1 EA
7 LF
2 EA
2 EA
1 EA
N.A.P.
Ifni!
t
IL
ii p I
15 16 17
iln
YpIla
STREET
I I u A-
22 23 24 a v
u
iia 1
29 30 i►
n
31
Tin
5� �' x• �'.�c ice, 2'.vc.
r3c;,c 6
1623
110 W.
-10
APN
TTM N�
i , 1
III I
I
(i
GRAPHIC SCALE
0 100 150 200 . 300
1 inch = 100 ft.
W �� �; e; .1'J �'i;t• t
EXP
s�• ctvi� �� �
FCA1.1F0�`
GRANULAR BEDDING FROM
SELECTED TRENCH SIDE
MATERIAL (I'v MAX. SIZE)
_j I HIGHLAND AVE IL
L
Q
Co
U
W
Q
W
,a
71 BASELINE AVE IF
VI C I N TTY MAP
NTS
TOP OF STRUCTURAL PVM'T
SUBGRADE
R 3" MAX SIZE
NATIVE SOIL -J
COMPACTED 95%
1:1 SLOPE OR FLATTER
OR ADEQUATE SHORING
0% COMPACTED
NATIVE BACKFILL
6" MAX. SIZE
sk
STORM DRAIN PIPE
6" MIN.
8" MAX , I
GRANULAR BEDDING FROM SELECTED TRENCH SIDE
MATERIAL FOR PIPE 10' OR GREATER IN DEPTH USE
Y2 CRUSHED STONE BEDDING
RCP TRENCH DETAIL
TRENCH DETAIL,
KS
WALNUT
STREET
DIRECTION OF FLOW
#--
SITE
o
SEWER MANHOLE
[ ]
INDICATES FUTURE ELEVATION
Q a
HYDRAULIC GRADE UNE
o
PROJECT
W
w W
ULTIMATE
z
LOCATION
w °-
EL z
0
W
Q
W
,a
71 BASELINE AVE IF
VI C I N TTY MAP
NTS
TOP OF STRUCTURAL PVM'T
SUBGRADE
R 3" MAX SIZE
NATIVE SOIL -J
COMPACTED 95%
1:1 SLOPE OR FLATTER
OR ADEQUATE SHORING
0% COMPACTED
NATIVE BACKFILL
6" MAX. SIZE
sk
STORM DRAIN PIPE
6" MIN.
8" MAX , I
GRANULAR BEDDING FROM SELECTED TRENCH SIDE
MATERIAL FOR PIPE 10' OR GREATER IN DEPTH USE
Y2 CRUSHED STONE BEDDING
RCP TRENCH DETAIL
TRENCH DETAIL,
KS
BASIS OF BEARING
� OF OLEANDER AVENUE SHOWS AS N 00'00'08 W PER P.M.
3428 PM8 30/97 ROTATED TO N 03'03'14 b W
LEGEND.
-�
DIRECTION OF FLOW
#--
STREET LIGHT
o
SEWER MANHOLE
[ ]
INDICATES FUTURE ELEVATION
HGL
HYDRAULIC GRADE UNE
INT
INTERIM
ULT
ULTIMATE
BASIS OF BEARING
� OF OLEANDER AVENUE SHOWS AS N 00'00'08 W PER P.M.
3428 PM8 30/97 ROTATED TO N 03'03'14 b W