','�zDTREET IMPROVEMENT PljANS
ASSF.1,SSOR'S PAIZCEI-, N'UMBER 0251---0251--50
GENERAL. NOTES
1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THIS PLAN AND THE SAN BERNARDINO
COUNTY STANDARDS AND SPECIFICATIONS.
2, BENCH MARK DATA — U.S.G. & G.S. OR OTHER DATUM ACCEPTABLE TO THE SAN BERNARDINO
COUNTY TRANSPORTATION/FLOOD CONTROL DEPARTMENT SHALL BE USED, THE BENCHMARK
USED, AS A BASIS SHALL BE IDENTIFIED.
3. STREET MARKERS PER SAN BERNARDINO COUNTY STANDARD NO, 303, 303A AND 303B SHALL
BE CONSTRUCTED AT EACH INTERSECTION,
4. STREET MARKERS SHALL BE CONSTRUCTED AT EACH INTERSECTION IN ACCORDANCE WITH
APPLICABLE SAN BERNARDINO COUNTY STANDARDS. ALL SIGNS SHALL BE INSTALLED IN
ACCORDANCE WITH COUNTY AND STATE SPI-CIFICATIONS,
A INDICATES STREET MARKER TO BE CONSTRUCT -ED (STANDARD 303, 303A & 303B)
5. A PERMIT WILL BE REQUIRED FROM THE SAN 13ERNAIRDINO COUNTY DEPT. OF PUBLIC WORKS
PRIOR TO ANY ENCROACHMENT OR CONSTRUCTION WITHIN THE COUNTYS EASEMENTS OR
RIGHTS—OF—WAY.
6. LEAVE 8" X 8" BLACKOUTS IN SIDEWALK'S FOR MAILBOXES, ETC., WHEN SIDEWALK IS PLACED
ADJACENT TO CURB,
7. IF ASPHALT CONCRETE IS TO BE PLACED DIRECTLY ON SUBGRADE OF ROAD OR DRAINAGE
FACILITIES, A SOIL STERILANT REGISTERED BY THE EPA. FOR USE UNDER A.C. AND P.C.C.
SHALL BE UNIFORMLY APPLIED AT THE MANUFACTURER'S RECOMMENDED RATE FOR THE FULL
PAVEMENT WIDTH PRIOR TO PAVING
S. AT THE COMPLETION OF ROUGH GRADING, A MATERIALS REPORT AND THE PROPOSED
STRUCTURAL SECTIONS SHALL BE SUBMITTED BY THE ENGINEER TO THE SAN BERNARDINO
COUNTY DEPARTMENT OF PUBLIC WORKS, FIELD ENGINEERING DIVISION, TRANSPORTATION
PERMITS SECTION, FOR REVIEW AND EVALUATION BY THE PAVEMENT MANAGEMENT SECTION. THE
SUBMITTAL SHALL INCLUDE A PLAT ANALYSIS AND SAND EQUIVALENT TEST RESULTS, A
STATEMENT OF RECOMMENDED STRUCTURAL SECTION AND TEST DATA SHEETS FOR ALL. R—VALUE
TESTS PERFORMED, INCLUDING EXPANSION PRESSURE READINGS. APPROVAL WILL BE' GIVEN
WHEN ALL STRUCTURAL SECTION REOUIRI-MENTS HAVE BEEN ME -7.
9. COMPACTION TESTS OF EMBANKMENT CONSTRUCTION, TRENCH BACKFILL, COMPACTING ORIGINAL
GROUND, ALL SUB—GRADES SHALL BE PERFORMED AT NO COST TO SAN BERNARDINO COUNTY,
A WRITTEN REPORT WITH THESE COMPACTION TESTS SHALL BE SUBMITTED TO THE SAN
BERNARDINO COUNTY DEPARTMENT OF PUBLIC WORKS, FIELD ENGINEERING DIVISION,
TRANSPORTATION PERMIT SECTION, FOR APPROVAL PRIOR TO PLACEMENT OF BASE MATERIALS
AND/OR SURFACING
10. AT THE COMPLETION OF PAVING. A MATERIALS REPORT SHALL BE SUBMITTED TO THE SAN
BERNARDINO COUNTY DEPARTMENT OF" PUBLIC WORKS, FIELD ENGINEERING DIVISION, PERMIT
SECTION, LISTING ALL TESTS OR DETERMINATIONS COMPLETED TO VERIFY:
A, R---VAL(.JE SIEVE ANALYSIS AND SAN[) EQUIVALENT OF AGGREGATE BASES.
B. STABILITY, OIL CONTENT AND SIEVE ANALYSIS OF ASPHALT SURFACING,
ll. THE WATER MAINS AND THE GAS MAINS SHALL BE PLACED UNDERGROUND PRIOR TO PAVING
CONSTRUCTION, THE SERVICE LATERALS FOR THE WATER SYSTEM AND THE GAS SYSTEM SHALL.
BE" INSTALLED AT A LATER DATE. WHERE IT IS NECESSARY TO CROSS THE PAVEMENT, SERVICE
LATERALS SHALL BE BORED INTO PLACE.
'12. ALL LATERAL. CUTS IN COUNTY MAINTAINED ROADWAYS SHALL BE TESTED TO VERIFY
DENSIFICATION TO 90% RELATIVE COMPACTION (RC.) AT VARYING DEPTHS TO WITHIN 0,5' OF
GRADING PLANE THE TOP 0_5' SHALL, BE DENSIFIED TO 95%>
'13. ALL LONGITUDINAL CUTS SHALL BE TESTED IN ACCORDANCE WITH THE SPECIFIED LIMITS AND
FREQUENCY AS OUTLINED IN SECTION 6 OF THE SAN BERNARDINO COUNTY STANDARDS AND
SPECIFICATIONS.
14. IMMEDIATELY FOLLOWING REMOVAL OF EXISTING PAVEMENT OR DIKE OR CURB AND/OR GUTTER,
THE CONTRACTOR SHALL DILIGENTLY PURSUE THIS PORTION OF WORK UNTIL COMPLETION.
15, AN ENCROACHMENT PERMIT MUST FIRST BE OBTAINED FROM THE COUNTY DEPARTMENT OF
PUBLIC WORKS, FIELD ENGINEERING DIVISION, TRANSPORTATION PERMIT SECTION, PRIOR TO
MAKING APPLICATION AND ISSUANCE OF A GRADING PERMIT OR BUILDING PERMIT,
16. SAN BERNARDINO COUNTY DEPARTMENT OF PUBLIC WORKS APPROVAL DOES NOT INCLUDE
WATER OR SEWER SYSTEM OR ESTIMATE OF' QUANTITIES.
'17. A PERMIT SHALL BE OBTAINED FROM THE COUNTY DEPARTMENT OF PUBLIC WORKS PRIOR TO
ANY CONSTRUCTION ON THIS PROJECT,
VICINITY MAP
THOMAS BROS. GUIDE
REF. PAGE 604; F-1
A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT
GENERAL NOTES (CONT.)
18, EXPANSIVE SOILS- IN EXPANSIVE SOIL., AREAS, THE SUBGRADE UNDER CURBS, GUTTERS, AND
SIDEWALKS. AND DRIVEWAY APPROACHES SHALL BE SCARIFIED TO THE DEPTH OF AT LEAST
EIGHT (8) INCHES AND MOISTURE SHALL BE APPLIED TO MAINTAIN FREE WATER ON THE
SURFACE FOR AT LEAST 24 HOURS PRIOR TO PLACING CONCRETE AND THE SUBGRADE SHALL
THEN BE PREPARED WITHOUT COMFIACTIVE EFFORT.
'19, ALL PIPE LINES OR SUBSTRUCTURES OF ANY KIND, AND TELEPHONE OR POWER POLES, WATER
METERS, VALVES, HYDRANTS, ETC_ SHOWN OR NOT SHOWN ON THESE PLANS WITHIN THE LIMITS
OF THIS DEVELOPMENT OR IN ADJACENT AREAS WHERE IMPROVEMENT WORK IS TO BE DONE
SHALL BE REMOVED OR RELOCATED AT DEVELOPER'S EXPENSE, AND AT NO COST TO THE
COUNTY OF SAN BERNARDINO TRANSPORTATION/FLOOD CONTROL DEPARTMENT, IT SHALL BE THE
OWNER'S RESPONSIBILITY TO NOTIFY ALL AGENCIES CONCERNED.
20. ALL C.S.P. INSTALLATIONS AND CONNECTIONS SHALL BE MADE PER MANUFACTURERS SUGGESTED
METHOD UNLESS OTHERWISE SPECIFIED ON THE PLANS.
21. CURB AND GUTTER, CROSS GLITTER AND SPANDRELS SHALL BE SO CONSTRUCTED THAT A
MINIMUM OF' PONDING OCCURS; SECTIONS HAVING GRADIENTS OF 0.5% OR FLATTER SHALL BE
WATER TESTED IN THE PRESENCE OF THE INSPECTOR IMMEDIATELY PRIOR TO ACCEPTANCE,
SECTIONS WHICH HAVE WATER PONDING MORE THAN 6" WIDE OR MORE THAN 4' LONG SHALL
BE SAW --CUT AND REMOVED IN LENGTHS NOT LESS THAN 4' AND REPLACED TO REDUCE
PONDING TO THE MAXIMUM SPECIFIED.
22. IF DURING CONSTRUCTION, GROUND WATER IS ENCOUNTERED, A SYSTEM APPROVED BY THE SAN
BERNARDINO COUNTY DEPARTMENT OF PUBLIC WORKS SHALL BE INSTALLED TO DEWATER SAID
AREA AT THE DIRECTION OF THE SOILS ENGINEER,
:23. ALL 0.4.0% OR LESS CURB GRADE LINES SHALL,, BE STAKED AT 25' INTERVALS AND FORMS
CERTIFIED BY 'THE ENGINEER BEFORE POURING CONCRETE.
24. EXISTING COUNTY ROADS WHICH WILL. REQUIRE RECONSTRUCTION SHALL. REMAIN OPEN FOR
TRAFFIC AT ALL TIMES WITH ADEQUATE DETOURS DURING ACTUAL CONSTRUCTION.
25, THE PRIVATE ENGINEER IS RESPONSIBLE FOR ASSURING THE ACCURACY AND ACCEPTABILITY OF
THE WORK HEREON. IN THE EVENT OF DISCREPANCIES ARISING DURING CONSTRUCTION, THE
PRIVATE ENGINEER SHALL BE RESPONSIBLE FOR DETERMINING AN ACCEPTABLE SOLUTION AND
REVISE THE PLAN FOR APPROVAL BY THE COUNTY OF SAN BERNARDINO.
26, SHOULD ANY EXISTING STOP SIGN BE' LOCATED ON A DEVELOPED CORNER OF AN INTERSECTION,
IT MUST BE MAINTAINED IN PLACE NEXT TO THE EXISTING PAVEMENT UNTIL SUCH TIME AS THE
WIDENED ROADWAY IS OPEN FOR TRAFFIC. AT THAT TIME IT WILL BE RELOCATED THREE (3)
FEET BEHIND THE NEW CURB IN THE VICINITY OF TI --IE BEGINNING OF THE CURB RETURN OR AS
OTHERWISE DIRECTED BY THE ENGINEER.
CITY BM#525
P.K, NAIL IN POWER POLE
316521151- AT 'THE NORTHEAST
CORNER OF BEECH & VALLEY.
EL,EV.=: 1079.02'
0 -iWP" AWT 4
SCALE: NOT TO SCALE
FOCUS ENGINEERING, INC. Omwm F1 E L D_
CIVIL ENGINEERS LAND SURVEYORS KSS
25 MAUCHLY, SUITE -317 k,IN
IRVINE, CA 92618
TEI_ (949) 450-0590 No. 41497
FAX, (949) 450-- 0592 EXFl 12/31/03
. .................
CFIARLIE C. LIU DATE 2003-05-21 MARK
TRAFFIC CONTROL -GENERAL NOTES
1 ALE._ SIGNING, STRIPING AND PAVEMENT MARKINGS SHALL BE IN CONFORMANCE WITH THE CURRENT EDITION OF
THE TRAFFIC MANUAL, PUBLISHED BY THE STATE OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION.
2, ALL STRIPING AND PAVEMENT MARKINGS SHALL BE THERMOPLASTIC(ALKYD BASE TYPE).
3. ALL SIGNS AND ROADSIDE MARKERS SHALL BE OF HIGH INTENSITY (FHWA TYPE III) REFLECTIVE SHEETING,
EXCEPT STOP SIGNS SHALL BE' DIAMOND GRADE (FHWA TYPE IIIA) REFLECTIVE SHEETING.
4. SIGNS SHALL BE MOUNTED ON METAL POSTS SIMILAR TO COUNTY STANDARD 303(A) AND 303(B),
5, ALL CONFLICTING STRIPING AND PAVEMENT MARKINGS NOT SHOWN ON THE PLANS, SHALL BE REMOVED BY
CONTRACTOR. REMOVAL SHALL BE' ACCOMPLISHED BY SANDBLASTING, GRINDING, OR AS DIRECTED BY COUNT),
REPRESENTATIVE,
6, ALL CONFLICTING SIGNS SHALL BE EITHER REMOVED, RELOCATED OR COVERED BY THE CONTRACTOR,
RELOCATABLE SIGNS SHALL, BE INSTALLED AS SPECIFIED 01\1 THE PLANS OR AS DIRECTED BY COUNTY
REPRESENTATIVE.
7, ALL EXISTING SIGNING, STRIPING AND PAVEMENT MARKINGS NOT SHOWN ON PLANS, IF' REMOVED/OBLITERATED,
SHALL BE REPLACED/RESTORED OF SAME KIND, AND IN CONFORMANCE WITH THE CURRENT EDITION OF 'THE
TRAFFIC MANUAL PUBLISHED BY THE STATE OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION.
8, THE CONTRACTOR SHALL NOTIFY COUNTY REPRESENTATIVE TO SCHEDULE WITH TRAFFIC DIVISION PERSONNEL FOR
A FINAL REVIEW (WALK THROUGH) AND APPROVAL OF TRAFFIC CONTROL DEVICES PRIOR TO PROJECT
ACCEPTANCE.
9. ALL CONSTRUCTION SIGNS SHALL BE BLACK ON ORANGE BACKGROUND WITH HIGH INTENSITY (FHWA TYPE 111)
REFLECTIVE- SHEETING.
10,, ALL CONSTRUCTION SIGNING SHALL BE IN CONFORMANCE WITH THE CURRENT EDITION OF THE MANUAL. OF
TRAFFIC CONTROLS FOR CONSTRUCTION AND MAINTENANCE WORK ZONES, PUBLISHED BY THE STATE OF
CALIFORNIA, DEPARTMENT OF TRANSPORTATION.
11, ALL SCHOOL. WARNING SIGNS SHALL BE DIAMOND GRADE FLUORESCENT REFLECTIVE SHEETING YELLOW --GREEN..
CONSTRUCTION CONTRACTOR AGREES TI --IAT IN ACCORDANCE WITH GENERALLY ACCEPTED
CONSTRUCTION PRACTICES, CONSTRUCTION CONTRACTOR WILL BE REQUIRED To ASSUME SOLE,
AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING -THE COURSE OF
CONSTRUCTION OF THE PROJECT. INCLUDING SAFE"I`Y OF ALL PR$ONS AND PROPERTY; THAT
THIS REQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL
WORKING HOURS, AND CONSTRUCTION CONTRACTOR FURTHER AGREE, TO DEFEND, INDEMNIFY
AND HOLD DESIGN PROFESSIONAL HARMLESS FROM ANY AND ALL LIABILITY, REAL OR
ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK IN THIS PROJECT, EXPECTING
LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF DESIGN PROFESSIONAL.
ALL UNDERGROUND UTILITIES OR STRUCTURES, REPORTED OR FOUND ON PUBLIC RECORDS,
ARE INDICATED WITH THEIR APPROXIMATE LOCATION AND EXTENT. THE OWNER BY ACCEPTING
THESE PLANS OR PROCEEDING WITH THE IMPROVEMENTS HEREON, AGREES TO ASSUME
LIABILITY AND HOLD THE ENGINEER HARMLESS F70R ANY DAMAGES RESULTING FROM THE
EXISTENCE OF UNDERGROUND UTILITIES OR STRUCTURES NOT REPORTED OR INDICATED
ON PUBLIC RECORDS, OR 'THOSE CONSTRUCTED AT VARIANCE WITH REPORTED OR RECORDED
LOCATIONS. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO
PROJECT THE UTILITIES OR STRUCTURES SHOWN AND ANY OTHER FOUND AT THE SITE. IT
SHALL. 13E THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE OWNER OR ALL UTILITIES
OR STRUCTURES CONCERNED BEFORE STARTING WORK.
THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR
UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS, ALL CHANGES TO -THE PLANS
MUST BE IN WRITING AND MUST BE APPROVED BY THE PREPARER OF THESE PLANS.
QUANTITIES SHOWN ARE FOR BONDING PURPOSES ONLY. CONTRACTOR IS RESPONSIBLE
FOR VERFYING ALL QUANTITIES PRIOR TO BIDDING AND CONSTRUCTION,
DIRECTOR OF PUBLIC WORKS DATE
SUBMITTED BY C,D.E, I
- - - - - - - -_m - -
+--l----jE�jjk __Jo r
REVISIONS DATE F DA�El DIRECTOR OF PUBLIC WORKS DATE
J4
STREET IMPROVEMENT PLANSI W,O, NO