FLOOR DEMOLITION
32
PLAN ------
FIELD VERIF)"
I
cy,
LLJ
_J
Ld
I Z'
t
�1 0, — 10" 5'- 8 21 _ 0
012
ROOF DEMOLITION
PLAN
11)/8 1� =_ i P_ol�
It I I I
L J
— — — — — — — — — -- — —
--- - - - - - - - -
12 12
1
--<D
0
REMOVE
a
KEYED -NOTES (DEMOLITION),
0
REMOVE
GUTTER, DOWNSPOUTS, SCUPPERS,
CONDUCT -OR HEADS AND/OR
REMOVE
CMU BLOCK WALL ASSEMBLY,
ENTIRE ROOF ASSEMBLY �NCLLJDING
METAL. DECK, �NSULATION,
10REMOVE
3
BUILIT--UP ROOFING, COPING, FLASHING AND
ACCESSORIES TO THE
EXTENT
INDICATED,
REMOVE
WINDOW AND FRAME ASSEMBLY.
3
0 REMOVE
FLOOR,
ENTIRE BUILDING ENCLOSURE INCLUDING BUT NOT LIMITED TO
WALLS, ROOF AND ALL ASSOCIATED COMPONENTS.
04 REMOVE
CONCRETE STAIRS AND HANDRAIL.
(D REMOVE
CHAIN LINK FENCE, SUPPORT POSTS, CATES AND TURNSTILES.
0 REMOVE
ROOF ACCESS LADDER SYSTEM
C) REMOVE
SOFFIT AND FASCIA OF ROOF OVERHANG 1-0 EXTENT �NDiCATED.
REMOVE
OVERHEAD COiLiNG DOOR ASSEMBLY.
REMOVE
PLUMBING FIXTURES AND ALL ASSOCIATED PIPING AND CAP
WHERE
�NDICATED ON CIVIL DRAWINGS.
OLO REMOVE
DOOR AND FRAME ASSEMBL)"'.
It I I I
L J
— — — — — — — — — -- — —
--- - - - - - - - -
12 12
1
--<D
0
REMOVE
LOUVER AND FRAME ASSEMBLY.
0
REMOVE
GUTTER, DOWNSPOUTS, SCUPPERS,
CONDUCT -OR HEADS AND/OR
ROOF DRAINAGE
SYSTEM TO THE EXTENT INDiCATED,
ENTIRE ROOF ASSEMBLY �NCLLJDING
METAL. DECK, �NSULATION,
10REMOVE
3
BUILIT--UP ROOFING, COPING, FLASHING AND
ACCESSORIES TO THE
EXTENT
INDICATED,
nREMOVE METAL ROOF' DECK, INSULATION AND BUiL1-LJP ROOF
14
SYSTEM TO EXTENT iNDICATED. PREPARE SURFACE TO RECEIVE
NEW ROOF SYSTEM AND PARAPET WALL,