Loading...
HomeMy WebLinkAbout4429-971$-4" 20 IZ F�ELD VERIFY FIELD VERIFY lot I I 101 lot I 101 1-4 (x) ul 2 9 fit f __0 10 mn, I It i 1 11 / L A. I I it / I -I I t I Ljj 4c__ H_' Ru I'd 5 1 2 11 '10 FLOOR DEMOLITION 32 PLAN ------ FIELD VERIF)" I cy, LLJ _J Ld I Z' t �1 0, — 10" 5'- 8 21 _ 0 ­­ 012 ROOF DEMOLITION PLAN 11)/8 1� =_ i P_ol� It I I I L J — — — — — — — — — -- — — --- - - - - - - - - 12 12 1 --<D 0 REMOVE a KEYED -NOTES (DEMOLITION), 0 REMOVE GUTTER, DOWNSPOUTS, SCUPPERS, CONDUCT -OR HEADS AND/OR REMOVE CMU BLOCK WALL ASSEMBLY, ENTIRE ROOF ASSEMBLY �NCLLJDING METAL. DECK, �NSULATION, 10REMOVE 3 BUILIT--UP ROOFING, COPING, FLASHING AND ACCESSORIES TO THE EXTENT INDICATED, REMOVE WINDOW AND FRAME ASSEMBLY. 3 0 REMOVE FLOOR, ENTIRE BUILDING ENCLOSURE INCLUDING BUT NOT LIMITED TO WALLS, ROOF AND ALL ASSOCIATED COMPONENTS. 04 REMOVE CONCRETE STAIRS AND HANDRAIL. (D REMOVE CHAIN LINK FENCE, SUPPORT POSTS, CATES AND TURNSTILES. 0 REMOVE ROOF ACCESS LADDER SYSTEM C) REMOVE SOFFIT AND FASCIA OF ROOF OVERHANG 1-0 EXTENT �NDiCATED. REMOVE OVERHEAD COiLiNG DOOR ASSEMBLY. REMOVE PLUMBING FIXTURES AND ALL ASSOCIATED PIPING AND CAP WHERE �NDICATED ON CIVIL DRAWINGS. OLO REMOVE DOOR AND FRAME ASSEMBL)"'. It I I I L J — — — — — — — — — -- — — --- - - - - - - - - 12 12 1 --<D 0 REMOVE LOUVER AND FRAME ASSEMBLY. 0 REMOVE GUTTER, DOWNSPOUTS, SCUPPERS, CONDUCT -OR HEADS AND/OR ROOF DRAINAGE SYSTEM TO THE EXTENT INDiCATED, ENTIRE ROOF ASSEMBLY �NCLLJDING METAL. DECK, �NSULATION, 10REMOVE 3 BUILIT--UP ROOFING, COPING, FLASHING AND ACCESSORIES TO THE EXTENT INDICATED, nREMOVE METAL ROOF' DECK, INSULATION AND BUiL1-­LJP ROOF 14 SYSTEM TO EXTENT iNDICATED. PREPARE SURFACE TO RECEIVE NEW ROOF SYSTEM AND PARAPET WALL, r"OV w';; �44 F, Prepared Under The Supervision Of Co "12 J`Pr 11. 7P 0 m -1 1 - 44