HomeMy WebLinkAbout4429-28_UENT LNE
AlHtks
WG. C-2
0
T. F/M-6
CMCamp Dtesw & McKee Incl.
�m
� E-1 �T
t=
2. NOT ALL ITEMS IN EQUIPMENT LIST ABOVE MAY BE SHOWN
ON THIS DRAWING.
3. BACKGROUND PIPE SUPPORTS NOT SHOWN FOR CLARITY.
I
a
I
0
I
............ . ...... .. . .............
CITY OF FONTANA, CALIFORNIA
BIL.CO MODEL KD3 ACCESS HATCH OR APPROVED EQUAL
12 to 0 ODOR CONTROL DUCT W/ BLIND FLANGE— SEE DWG M-1
PUMP MOTOR AND 16" VTSH DISCHARGE HEAD
N
BERNARDINO AVENUE LIFT STATION
I. Cn ,
16" DI PIPE SPOOL
MECHANICAL
A E E-�, $
SCALE—- t$=V
C L3/8 1,
24" DI PIPE SPOOL
NED BY:
ROSSoASECTION III
48" WIDE SLIDE GATE— SEE DWG M-1
CL
CA
6" AIR/VACUUM VALVE— APCO MODEL 406 OR APPROVED
FE13RUARY 2007
EQUAL PER DET. B/M-6
ED BY:
APPRQVED By�-__,
4- AIR/VACUUM— APCO MODEL 4.04 OR APPROVED EQUAL
EN03023
PER DET. B/M-6
M-5
SEAL WATER SYSTEM PER DET. G/M-6
SECTION
CAST IN PLACE WATER TIGHT WALL PENETRATION
CITY EN R R.C.E. 51152 DATE:
wall mmm"mmumm
W/ SEEP RING PER DET. A/M-6
SCALE: 3/8" V-0" M-2
HOSE REEL AND 3/4" HOSE BIB PER DET. B/C-4
REMSION DESCRIPIN
DATE
ENGR.
elly DATE
SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT
Prepared Under The Supervision Of
ESSIO
COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL
SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER,
THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO
(La No
cr� 13
DES
BRING THEM INTO CONFORMANCE WITH CONDITIONS AND
(4,x
..... ....... .
a 1,
CHECI
OF 4L.
,ate
STANDARDS IN EFFECT.
2. NOT ALL ITEMS IN EQUIPMENT LIST ABOVE MAY BE SHOWN
ON THIS DRAWING.
3. BACKGROUND PIPE SUPPORTS NOT SHOWN FOR CLARITY.
I
a
I
0
I
............ . ...... .. . .............
CITY OF FONTANA, CALIFORNIA
SAN
N
BERNARDINO AVENUE LIFT STATION
I. Cn ,
BY:
CEB
MECHANICAL
A E E-�, $
SCALE—- t$=V
C L3/8 1,
0 1
NED BY:
ROSSoASECTION III
nAlr.
DATE:
CL
CA
FE13RUARY 2007
ED BY:
APPRQVED By�-__,
DRAWNG NO.:
EN03023
M-5
LRL
CITY EN R R.C.E. 51152 DATE:
wall mmm"mmumm
riv .4125