HomeMy WebLinkAbout4345-610" VALVE BOX MARKED W1 2'
LETTERS READING Q.C. QUICK COUPLER VALVE
W1 LOCKING BOLT LID
--12" MIN, FROM HARIDSCAPE MATERIALS
FINISH GRADE
=4
1715t, —IIt:,: 1 _lF_9,1__111"aTl t
I I k� I P-9 1 E�l I F__�
6' MIN PEA GRAVEL
DATE OF LAST REVISION:
A. QUICK COUPLER DETAIL
MAIN SUPPLY, LATERAL
AND WIRING
A
-J
TAPE AND BUNDLE WIRING.AT
10'0.C. MRXIMUM TO MAINLAINE.
PROVIDE A 20"LOOP OF WIRE
IN ALL CHANGES OF DIRECTION
GREATER THAN 30 DEGREES REMOVE
TIES AFTER ALL CONNETIONS
HAVE BEEN MADE
E. PIPING AND WIRING
BOX TO BE: PLACED AT RIGHT ANGLE TO
HARDSCAPE EDGE wl VALVE #ETGHED IN I 11D
12"XI 8" PLASTIC BOX -AND COVER %MTH
LOCK TOP
CURL T YPE EXPANSION 'LOOP (MIN -24')
WATERPROOF WIRE CONNECTION 12"'OR
AS NO TIED F- HARDSCAPE
CHRISTY'S LD TAG 'ISTANDARD)
SECURE TO SOLENOID PIGTAIL
31
FINISH GRADE r- 314gf <
4
--IT
i p 1 1
12"MAX. TOP E911 1— 21'
SOLENOID
OF VALVE
PVC LINE PIPE
NON-PIRESSURE
18" MIN LINE FITTING
UNION CONNECTION
—PEA GRAVEL
(MIN.3 CU. FT�)
PVC LINE PIPE PVC SCH. 40 MALE ADAPTOR
PVC E-LBOW (TYP. 2 PLACES)
PVC LINE PIPE
COMMON WIRE PVC SUPPLY LINE FIT
CONTROL �MRE
t --y_
k:
L M
k A I
-3
IF) L A N v vv
.-J
4
TYP. CONCRETE -1 OIREST
AGAINST UNDISTURBED
SOIL
F L V A T lu_� IN
-Z
TYP. CONCRETE
THRUST BLOCKS
WATERPROOF ALL
WIRE CONNECTIONS
AS PER STD.
UF 14
WHITE WIRES
"COMMON)
v
BLUE
FLOW SENSOR
DIAMETER SAME SIZE
AS FLOW M"T ER SIZE
MINIMUM DISTANCE UPSTREAM
1 OX DIAMETER OF FLOW
METER SIZE
MASTER CONTROL
VALVE
MINIMUM DISTANCE DOWNSTREAM
5X DIAMETER OF FI -01M METER SIZE
CONC. WALK -,
2 EA. PVC STEET ELLS
NOTE -
INSTALL HI -POP IRR. HEAD 1 1/2" ABUk/E F.G.
e% � 4 42" BELUVAY1 HAIRDSCAPE
INSTALL CHECK VALVES FOR LOW HEAD DRAINAC-E
F
E77 7
BP,ASS
GATE VALVE
VALVE BOX WfLOCK
117INISH GRADE
11 PVC. MALE ADAPTOR
— 2' x 4` RAID BLOCK
I CU� FT. PEA GRAVEL
INSTALL A 6ROUND PLASTIC
BOX WITH LOCKING LID
SPLICE BLOCK
In
MJIN� 24" ABOVE GRADE
FINISH GRADE
_�- 2" x 4" RWD BLOCK
I CU � FT. PEA GRAVEL
NOTE:
REMOTE CONTROL BOX MAY BE USED IN LIEU OF SPLICE BOX.
DATE OF LAST REN4SION:
H. SPLICE BOX ASSEMBLY DETAIL
SCHEDULING
DATE OF LAST RMION:
DATE OF LAST REVISION.-
�vvEsslr, APPROVED BY:
CITY OF FONTANA
SIO/Z APPROVED BY:
Yf/
CITY OF FONTANA
c,
No� 251 CITY ENGWEER
ROBERT W. WEDDLE
DATE: -F T-
GA i t- VALVF
No. 25126 CITY ENGINEER DATE:
ROBERT W. WEDDLE
HI POP SHRUB HEAD
EXP_ 12/31/01 I
RECOMMENDED BY:
EXR 12/331pi
RECOMMENDED BY.�
OF C0
ETAIL NO. 519
OF DRAWN BY. 11MOTHY RASTEDT
STD. DETAIL NO. 524
Plan ning
310 N - joy Stneell
orona 928-19
CA 1
F Hl POP SHRUB HEAD
DETAIL
G. GATE VALVE
DETAIL
INSTALL A 6ROUND PLASTIC
BOX WITH LOCKING LID
SPLICE BLOCK
In
MJIN� 24" ABOVE GRADE
FINISH GRADE
_�- 2" x 4" RWD BLOCK
I CU � FT. PEA GRAVEL
NOTE:
REMOTE CONTROL BOX MAY BE USED IN LIEU OF SPLICE BOX.
DATE OF LAST REN4SION:
H. SPLICE BOX ASSEMBLY DETAIL
SCHEDULING
v
J IF 3p, J,:
AJP
_mATURE`_
Controller Identification: Controller 1
9�30/09
EXP . DATE
OF C0
BMLA, Inc.
------------------ -------------------------------------------------------------------------------------------------------------------------------
Station! Program A
Plan ning
310 N - joy Stneell
orona 928-19
CA 1
- - nA
None: 909 � 73
wvvw.BMLA,nef.
CITY OF FONTANA
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
--------------------------------------------------------------------------------------------------------------------------------------------------
Minutes Per Cycle (mmss): 14-55
11:24
14:12
15:03
14:27
17:22
14:02
17:60
lW56
14:34
933
130:30
Cycles Per Day: 1
2
2
2
3
3
4
3
3
22
2
'1
Days To Skip. 6
6
6
6
6
6
6
6
6
6
6
6
Precipitation Rate: 1.78
Description or Location: I
Total Flow of Valve (GPM'- 24-8
--------------------------------------------------------------------------------------------------------------------------------------------------
Stafion2' Pmogram. A
JAN
FEB
MAR
ADR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
--------------------------------------------------------------------------------------------------------------------------------------------------
Minutes Per Cycle (mmss): 14-55
11:24
14:12
15-0,31 '14:27
17:22
14:02
17:60
14:56
14:34
933
'113:310
Cycles Per Day: 1
2
2
2
3
3
4
3
3
2
2
1
Days To Skip: 6
6
6
6
6
6
6
6
6
6
6
6
Precipitadon Rele: l.' 8
De-saiption or Location: 2
Total Flow of Valve (GPM): 25A
--------------------------------------------------------------------------------------------------------------------------------------------------
Station 3 Program A
JAN
FEB
MAR APR 11I.I.AY JUN
JUL
AUG
SEP
OCT
NOV
DEC
--------------------------------------------------------------------------------------------------------------------------------------------------
Minutes, Per Cycle (mmss): 14:55
11:24
14-12
15-03
14-27
17:22
14:02
17:60
14:56
14:34
9:33
113:30
Cycles Per Day- -f
2
2
2
3
3
4
3
3
2
2
1
Days To Skip: 6
6
6
6
6
6
6
6
6
6
6
6
Precipitation Rate: 11.78
Description or Location: 3
Total Flow, of Valve (GPM): 25
--------------------------------------------------------------------------------------------------------------------------------------------------
Station 4 Program: A
JAN
FEB
MAR
APR
IVIAY
JUN
JUL
AUG
SEP
OCT
NOV DEC
--------------------------------------------------------------------------------------------------------------------------------------------------
MinutesPer Cycle (mmss): 14-55 11:24 14:12 15:03 14:27 '17:22 14:02
17:60 14:56 14:34
9-33 13-30
Cycles Per Day: 1
2
2
2
3
3
4
3
3
2
2
1
Days To Skip- 6
6
6
6
6
6
6
6
6
6
6
6
Precipitation Rate: 1.78
Desceiption or Location: 4
Total Flow of Valve (GPM): 24
--------------------------------------------------------------------------------------------------------------------------------------------------
Station 5 Program: A
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
-------------------------------------------------------------------------------------------------
Minutes Per Cycle (mm.
:ss)� 14-55
11:24
14-12
15�03
14:27
17:22
------------------------------------------------
14:02
17:60 14:56
14-34
9:33
13-30
Cydes Per Day: 1
2
2
2
3
3
4
3
0
2
2
1
Days To Skip: 6
6
6
6
6
6
6
6
6
6
6
6
Precipitation Rate: 1.78
Description or Locafion: 5
Total Flow of Valve (GPM): 24
---------------------------------------------------------------------------------------------------------------------------------------------
Station 6 Program: A
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - -
Minutes Per Cycle (mmss): 14-55
- - - - - - - - - - - - - - - - - - -
'19111:24 14-12
- - - - 7 - - - -
15:03
- - - - - - - - -
14:27
- - - - - - - - -
17:22
- - - - - - - - -
14:02
- - - - - - - - - -
17-60
- - - - - - - - - - - - - - - - -
14:56 1434
- - - - - - - - -
9-303
- - - -
13-30
Cydes Per Day� 1
"1
If-
2
2
3
3
4
3
3
2
2
1
Days To Skip.- 6
6
6
6
6
6
6
6
6
6
6
6
Predpitation Rate: 11.78
Descripbon or Location: 6
Total Flow of Valve (GPM): 28
-------------------------------------------------------------------------------------------------------------------------------------------------
Station 7 Program- A
JAN
F=B
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DECk
--------------------------------------------------------------------------------------------------------------------------------------------------
Minutes Per Cycle (mm:ss)- 14-55
11:24
14-12
15:03
14:271
17-22
14-02
17:60
14:56
'14:34
9:33
13:30
Cycles Per Day: 1
2
2
2
3
3
4
3
3
2
2
1
Days To Skip: 6
6
6
6
6
6
6
6
6
6
6
6
Precipitation Rate: 1.78
Description or Location: 7
Total Flow of Valve (GPM): 28
-------------------------------------------------------------------------------------------------------------------------------------------------
Stefion 8 Program A
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OGTT
NOV
DEC
-----------------------------------------------------------------------------------
Minutes Per Cyde (mm -ss): 14-55
11,24
14-12
-------------------------------------------------------
15:03 14:27 17-22
14-02 '17:60
14:56
14:34
-
9-33
-----
13:30
Cycles Per Day:
2
2
2
3
3
4
3
3
2
2
1
Days To Skip- 6
6
6
6
6
6
6
6
6
6
6
6
Precipitation Rate: 1 �78
Desanptlon or Location: 8
T-*-1 -1, 2`8
..I Flow off Valve (GPM): 2
I -
-------------------------------------------------------------------------------------------------------------------------------------------------
Station 9 Program A
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
----------- ---------------------------------------------------------------
Minutes Per Cycle (mmss): 14:55
11:24
14:12
------------------------------------------------------------------
15-03
14:27
17:22
14.-02
1IT-60
11W-56
14-34
9-3-3
__
113:30
Cycles Per Datl,. 1
4
2
2
3
3
4
3
3
2
2
1
Days To Skip�- 0
6
6
6
6
6
6
6
6
6
6
6
Precipitabon Rate: 1.78
Dess-ceiption or Location: 9
I otal Flow of Valve (GPM): 28
1 f
------------------------------------------------------------------------------------------------------------------------------------------------
Station 10 Program A
jAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
----------------------------------------------------------------------------------------------
Minutes Per Cycle (mmss): 14-555
11:24
14-12
ll&03
14:27
= -----------------------------------------
17:22
14:012 17:6-0
114-56
114:31-4
- - -
9:33
- --
13:30
4
Cya-es Per Day- 1
2
2
2
3
3
4
3
2
2
4
1
Days To Skip: 6
6
6
6
0
6
6
6
6
6
6
Precipitation Rate-, 1.78
Desaiption or Location: 10
Total Flow ol"Valve (GPM): 28
--------------------------------------------------------------------------------------------------------------------------------------------------
-Stabon 144 Program: A
JAN
FEB
MAIR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
------------------------ -------------------------------------------------------------------------------------------------------------------------
Minutes Pel- (_'ycle (.rnm:ss): 14�55
11�24
1412
15:03
14:27
17-22
14�02
17:60
14�56
14:34
9-33
!,3:30
Cycles Per Day: i
2
2
2
3
3
4
3
3
2
2
1
Dars To Skip: 6
6
6
6
6
6
6
6
6
6
6
6
Precipitation Rate: 1 �78
Description or Location- 11
I otal Flow of Valve (GPM): 30�9,
NOTE- THIS IRRIGATION SCHEDULE IS MEANT
TO BE USED AS A
GUIDELINE ONLY,
AND DOES NOT TAKE THE PLACE OF PROPER, ONGOING SYS11-EM MANAGEMENT.
DIFFERING SITE AND CLIMATIC CONDITIONS MAY REQUIRE ADJUSTMENTS
NOT REFLECT ED IN THIS SCHEDULE
I
v
J IF 3p, J,:
AJP
_mATURE`_
9�30/09
EXP . DATE
OF C0
BMLA, Inc.
itecture & Site
Lands�_ 'JI
cope Arch,
Plan ning
310 N - joy Stneell
orona 928-19
CA 1
- - nA
None: 909 � 73
wvvw.BMLA,nef.
CITY OF FONTANA
DIRIAWN BY:
SPK AC PROJECT NAME
VILLAGE OF HERITAGE
DIESIGNED BY:
SPK, MU
08-28-07
CHECKED SY: APPIR01VED: DWIG NO�
BAX
1 10
CITY ENGINEER 51152 R�C�E.
OF 7