Loading...
HomeMy WebLinkAbout4214-1A X XTd"hr'11170 9 NO MATERLA.I., OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT OBTAINING A SEPARATE PERMIT FOR THAT PURPOSE. SITE LOCATION' '10 THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION, HOWEVER, rr -04 " 1, a Lg SRALL BE THE RESPONSIBILITY OFTHE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND miff' ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTION TO AVOID DAMAGE THERETO. FS -TALL CONTACT UNDE RGROUND SERVICE ALERT AT 1-800-227-2600 TWO WORKING DAYS KA THE CONTRACTOR S1 —Tv -T BEFORE EXCAVATION. LAKES m ix ITY COMPANIES INCLUDING, BUT NOT I THE CONTRACTOR SHALL COORDINATE, CONSTRUCTION WITH ALL UTIL TOCIN, TANDqrAPTNr, LANDRCAPF IRRIGATT N. Al TY-N&TIM'"'Pi A Q 'rVT VDITAMP VT VC"IT'D rr r A UT X TRISV 0 - I , 1 4 ", I_, : � � I 20 ALI, GRADING OPERATIONS SHALL BE DISCONTINUED WHEN SUSTAINED WIND VELOCITIES EXCEED 25 MILES PER HOUR. I PROPFRTY I INF 26 ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH EXISTING W CONCRETE. ®r 'IS" 190 9 A 106 ............ , oat I ®r as 27 THE SEWER CONTRjkCTOR SHALL STAMP AN IN THE FACE OF THE CURB AT THE LOCATIONOFTHE SEWER LATERAL. 107 97 06 06 28 NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED, 1NsPEcTED AND APPROVED. OF 1 0 87 29 ALI, UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF STREETS. fly ot (j) top 06 04 30 APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIORTO PI'ACEMENT. QD #to .94 ®R 31 PAVEMENT STRUCTURAL SECTIONS SHOV�rN ARE MINIMUM AND SUBJECTTO REVISION AND APPROVAL OF THE crrY ENGINEER AS DETERMINED BY SOILS TESTS TAKEN AFTER COMPLETION OF ROUGff GRADING. its (D so 32 ACTUAL THICKNESS OF A.C. PAVEMENTANDIOR BASE COURSE MATERIAL FOR STRUCTURAL STREET SECTIONS SHALL BE RECOMMENDED BY A GEOTECHNICAL REPORT AND SUBMITTED TO THE CITY OF FONTANA FOR 114 APPROVAL UPON COMPLETION OF ROUGH GRADING. 355 to '99 33 ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL, BE RAISED TO FINISHED GRADE BY THE 1 f3 PAVING CON,rRACTOR UPON COMPLETION OF PAVING. 34 UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES, PLOT MAP AND OTHER TRAFFIC CONTROL DEVICES TO THE sAxiSFACTION OF THE CITY TRAFFIC ENGINEER. 35 CON,rRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS AND SIDEWALKS AFFECTED BY THE CONSTRUCTION TO THE SATISFACTION OF THE CITY ENGINEER.