HomeMy WebLinkAbout4256-1C>
W Cu
a a)
+1
E3
CD
CD
N L
r, L
ICU +1
X
L UJ
a.",
W <
UJ _J
X
NU I I U t:M_ttU C3
13'-6"
I 11! TI
3,, 0
LWAS,
I'a OF
IRMO,
PC CONCRETE PAVING, SEE LANDSCA
CONSTRUCTION PLAN FOR LOCATION
AND TYPE
PROVIDE 12", #4 REBAR'SPEEDY-DOW
24'O.C. AT ALL EXPANSION JOINTS
+'ASPHALTIC EXPANSION FELT WITH
POLYURETHANE SURFACE SEAL
I M nom
A. EXPANSION JOINTS SHA
IN ENLARGEMENT A. SEI
PLAN FOR LOCATIONS.
AGAINST PREVIOUSLY C
AND BETWEEN VARYIN(
B. WEAKENED PLAN JOINI
SHOWN IN ENLARGEME
CONSTRUCTION PLAN F
PC CONCRETE PAVING, SEE LANDSC/
CONSTRUCTION PLAN FOR LOCATION
AND TYPE
.... . .... ...
IM71M "I WM *111219 1 [0] WAQV R4 Ke
_Jrjefflff I
SCALE- 3/4 11=11-01, I LANDSCAPE CONST, LEGEND
- � 111 il�'ll'i'� 11 ig
III , 6. in; N4 -
Eff I
I JIM
311
iq�pr Pill fil
IN
NOT TO SCALE
A
CONCRETE WALK PER DETAIL A, THIS SHEET
-------------- EXPANSION JOINT PER DETAIL A, THIS SHEET
CONCRETE ACCENT PAVING PER DETAIL A, THIS SHEET
24" BOX SYAGRUS ROMANZOFFIANUM (QUEEN PALM)
I I OV GFI WEATHER -RESISTANT RECEPTACLE (TYP.), SEE
ELECTRICAL DRAWINGS
NOTE: *
I CONTRACTOR SHALL CONDUCT IN -FIELD REVIEW OF EXISTING SITE
CONDITIONS WITH AN OWNER AUTHORIZED REPRESENTATIVE PRIOR
TO COMMENCING CONSTRUCTION TO DETERMINE THE FINAL LIMIT
OF EXISTING FLATWORK TO BE REMOVED
rz
0
10
-0
SCALE 1 10
'Ile
ww
A. Contractor shall be responsible to verify the existing site conditions and to nofify the City
Engineer and Landscape Architect of any differences between the actual conditions and
those shown on the plans.
B. The Contractor shall review the drawings prior to construction and fabrication and notify the City
Engineer and Landscape Architect of any discrepancies before proceeding with the work.
C. Only "approved" drawings shall be used for the construction of this project. No changes of,
modifications to the plans shall be made without the prior approval of the City Engineer and
Landscape Architect.
D. All numeric and written dimensions shall have precedence over all scale dimensions.
E. Details and notes on the drawings take precedence over typical details and general notes.
F� All construction shall conform to the approved plans, and the most current U.B.C. Chapter 33
unless otherwise indicated. In the absence of a specified standard or specification, work shall
conform to the latest edition of the Standard Specifications for Public Works Construction.
G. No trees, other than those shown, shall be removed without prior approval of the City.
H. Areas to receive reconstructive fill shall be cleared of vegetation as directed per plans. Major
roots shall be left intact where possible, as recommended by the Landscape Architect.
1. Other areas to be cleared for construction shall be carefully cleared to the minimum area
required for competent construction.
J. All areas disturbed by construction, or by erosion prior to or during construction, shall be
revegetated and protected in accordance with the erosion control section of these plans.
K. Contractor shall take all care to prevent disruption of project site in areas outside construction
zone.
L. The contractor shall notify the City Engineer at least 48 hours before commencing construction.
M. The contractor shall employ all labor, equipment, and methods required to prevent his
operations from producing dust in amounts damaging to property, cultivated or native
vegetation, and domestic and non-dornestic animals or causing a nuisance to persons
occupying buildings in the vicinity of the job site. The contractor shall be responsible for any
damage caused by dust resulting from his operations.
N. Construction line and grade stakes shall be set by a licensed Civil Engineer or Surveyor in the
State of California.
0. All protective devices to be installed by the contractor, shall be in place at the end of each
work day.
P. Contractor shall refer to materials specifications throughout the approved plan set. Any
substitutions of the materials specified in these drawings shall require written approval from the
City Engineer.
Q. The Contractor shall notify the City Engineer, a minimum of 48 hours in advance of the start of
work. There will be inspection of this project to ensure strict adherence to these drawings and
specifications. During the course of work, the Contractor shall be responsible for calling the City
Engineer for testing and inspection 24 hours in advance. Work not properly tested and
inspected will be subject to rejection.
R. Work in and along public streets, once begun, shall proceed to completion without delay so as
to provide minimum inconvenience to adjacent property owner and to the traveling public.
S. The Contractor shall take all necessary precautions to protect adjacent properties from storm
water runoff and or deposition of debris resulting from construction of this project.
T. All existing trees to remain shall be protected from damage throughout construction. No
materials or equipment shall be stored within the canopy of the dripline of the tree.
U. Contractor shall be responsible for the verification of location of all existing utilities in the field
prior to construction. All utilities shall be protected and repaired by the Contractor if damaged.
V. The Contractor shall be responsible for notification of all utility companies 48 hours prior to the
beginning of work. Underground Service Alert, U.S.A. (800) 642-2444'.
W. Entrance to the site shall be from the parking lot during construction.
X. Contractor shall clear and grub all areas within the limit of work as determined by the contract
base bid and any bid alternates awarded.
SITE ELEMENTS
EXISTING BUILDING WALL, SEE ARCHITECTURAL PLANS
4" THICK PC CONCRETE WALK, COLOR & FINISH
TYPE SHALL MATCH NEW CONSTRUCTION AT
EXISTING BUILDING COLUMN TO BE REMOVED, SEE
WEST SIDE OF SIERRA AVENUE. CONTRACTOR
[11
ARCHITECTURAL PLANS
SHALL PROVIDE 2'X2'SAMPLE OF FINISH FOR
APPROVAL PRIOR TO CONSTUCTION
EXISTING BUILDING OVERHANG TO BE REMOVED, SEE
ARCHITECTURAL PLANS
EXISTING PUBLIC PHONE STAND TO BE REMOVED
1/2" RADIUS, TYPICAL AT EDGES
EEXISTING
TREE, STUMP, AND ROOTS TO BE REMOVED
#4 BARS AT 24" O.C. BOTH WAYS. PLACE BARS
ON CHAIRS, TYP.
EXISTING CONCRETE WALK FROM BACK OF EXISTING
CURB TO EXISTING BUILDING TO BE REMOVED
4" THICK COLORED, STAMPED CONCRETE
COLOR & STAMP TYPE SHALL MATCH WEST SIDE
L 7J
PROTECT IN PLACE EXISTING CURB
OF SIERRA AVENUE. CONTRACTOR SHALL
PROVIDE 2'X2'SAMPLE OF FINISH FOR APPROVAL
El
PROTECT IN PLACE EXISTING UTILITY BOX
PRIOR TO CONSTUCTION
PROTECT IN PLACE EXISTING STREET LIGHT AND
CONCRETE PEDESTAL
PROTECT IN PLACE EXISTING TREE
PROTECT IN PLACE EXISTING CONCRETE
CONSTRUCTION LEGEND
0
CONSTRUCT CONCRETE WALK PER DETAIL A, THIS SHEET
PROTECT IN PLACE EXISTING CONCRETE CURB
AND GUTTER
(D
CONSTRUCT CONCRETE ACCENT PAVING PER DETAIL A,
THIS SHEET
UNDISTURBED SOIL, OR IF DISTURBED, 90%
PROVIDE AND INSTALL 24" BOX SYAGRUS
RELATIVE COMPACTION, TYP.
ROMANZOFFIANUM (QUEEN PALM)
CLASS 11 AGGREGATE BASE Oa 90% RELATIVE
PROVIDE 5SQ. PLANTER AREA. PROVIDE 3" OF STRINGY
COMPACTION, TYP.
CEDAR BARK MULCH
PROVIDE 11 OV GFI WEATHER -RESISTANT RECEPTACLE
(TYP.), SEE ELECTRICAL DRAWINGS
- � 111 il�'ll'i'� 11 ig
III , 6. in; N4 -
Eff I
I JIM
311
iq�pr Pill fil
IN
NOT TO SCALE
A
CONCRETE WALK PER DETAIL A, THIS SHEET
-------------- EXPANSION JOINT PER DETAIL A, THIS SHEET
CONCRETE ACCENT PAVING PER DETAIL A, THIS SHEET
24" BOX SYAGRUS ROMANZOFFIANUM (QUEEN PALM)
I I OV GFI WEATHER -RESISTANT RECEPTACLE (TYP.), SEE
ELECTRICAL DRAWINGS
NOTE: *
I CONTRACTOR SHALL CONDUCT IN -FIELD REVIEW OF EXISTING SITE
CONDITIONS WITH AN OWNER AUTHORIZED REPRESENTATIVE PRIOR
TO COMMENCING CONSTRUCTION TO DETERMINE THE FINAL LIMIT
OF EXISTING FLATWORK TO BE REMOVED
rz
0
10
-0
SCALE 1 10
'Ile
ww
A. Contractor shall be responsible to verify the existing site conditions and to nofify the City
Engineer and Landscape Architect of any differences between the actual conditions and
those shown on the plans.
B. The Contractor shall review the drawings prior to construction and fabrication and notify the City
Engineer and Landscape Architect of any discrepancies before proceeding with the work.
C. Only "approved" drawings shall be used for the construction of this project. No changes of,
modifications to the plans shall be made without the prior approval of the City Engineer and
Landscape Architect.
D. All numeric and written dimensions shall have precedence over all scale dimensions.
E. Details and notes on the drawings take precedence over typical details and general notes.
F� All construction shall conform to the approved plans, and the most current U.B.C. Chapter 33
unless otherwise indicated. In the absence of a specified standard or specification, work shall
conform to the latest edition of the Standard Specifications for Public Works Construction.
G. No trees, other than those shown, shall be removed without prior approval of the City.
H. Areas to receive reconstructive fill shall be cleared of vegetation as directed per plans. Major
roots shall be left intact where possible, as recommended by the Landscape Architect.
1. Other areas to be cleared for construction shall be carefully cleared to the minimum area
required for competent construction.
J. All areas disturbed by construction, or by erosion prior to or during construction, shall be
revegetated and protected in accordance with the erosion control section of these plans.
K. Contractor shall take all care to prevent disruption of project site in areas outside construction
zone.
L. The contractor shall notify the City Engineer at least 48 hours before commencing construction.
M. The contractor shall employ all labor, equipment, and methods required to prevent his
operations from producing dust in amounts damaging to property, cultivated or native
vegetation, and domestic and non-dornestic animals or causing a nuisance to persons
occupying buildings in the vicinity of the job site. The contractor shall be responsible for any
damage caused by dust resulting from his operations.
N. Construction line and grade stakes shall be set by a licensed Civil Engineer or Surveyor in the
State of California.
0. All protective devices to be installed by the contractor, shall be in place at the end of each
work day.
P. Contractor shall refer to materials specifications throughout the approved plan set. Any
substitutions of the materials specified in these drawings shall require written approval from the
City Engineer.
Q. The Contractor shall notify the City Engineer, a minimum of 48 hours in advance of the start of
work. There will be inspection of this project to ensure strict adherence to these drawings and
specifications. During the course of work, the Contractor shall be responsible for calling the City
Engineer for testing and inspection 24 hours in advance. Work not properly tested and
inspected will be subject to rejection.
R. Work in and along public streets, once begun, shall proceed to completion without delay so as
to provide minimum inconvenience to adjacent property owner and to the traveling public.
S. The Contractor shall take all necessary precautions to protect adjacent properties from storm
water runoff and or deposition of debris resulting from construction of this project.
T. All existing trees to remain shall be protected from damage throughout construction. No
materials or equipment shall be stored within the canopy of the dripline of the tree.
U. Contractor shall be responsible for the verification of location of all existing utilities in the field
prior to construction. All utilities shall be protected and repaired by the Contractor if damaged.
V. The Contractor shall be responsible for notification of all utility companies 48 hours prior to the
beginning of work. Underground Service Alert, U.S.A. (800) 642-2444'.
W. Entrance to the site shall be from the parking lot during construction.
X. Contractor shall clear and grub all areas within the limit of work as determined by the contract
base bid and any bid alternates awarded.