HomeMy WebLinkAbout4245-1:V ilLf I T t,/AZwtMLN I Znk tAIZ� I NCA I IV frl r— ZI M'r—C., i Ml %,In. I —&Jr —,VV M, T , Mr- LPAUE:.f-%MU_ �af"IPNLL� fLTMV#U-4fl%4L_ %J 1 t-4-4 J-t4�jt%Jl_ fil" L.,Wf
THE EASEMENT.
0- N B IQ R: a �l T �YF�BL 3.A.F F
FROM UTILYTY
VERIZON
(D
CONSTRUCT
8 VCP EXTRA STRENGTH SEWER
769 LF
-AS
32.THE SEWER CONTRACTOR SHALL STAMP AN "S" IN THE FACE OF THE CURB AT THE LOCA110N OF THE SEWER LATERAL.
ATTN. STEVE HOCK
SUBMiTTING A BID FOR THIS WORK, THE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND
1400 E. PHILLIPS BLVD.
Q
CONSTRUCT
48" SEWER MANHOLE PER CITY STD PLAN 2001
4- EA
COMPLETE RESPONSIBtLITY FOR JOBL SITE CONDI'nONS DURING THE COURSE OF CONSTRUCTION OF THIS
33.1F EXISTING UTILfilrS OR ANY OTHER FACIOTIES CONFLICT WfTH THE PROPOSED IMPROVEMENTS, THE CONTRACTOR SHALL N071'FY'THE
POMONA, CA. 91766
W/ FRAME
& COVER PER CITY STD PL -AN. 2000
PROJECT, INCLUDfNG, SAFE�TY OF ALL PLRSONS AN,D4 P'ROPERTY, THAT THIS REQU-1-REMENT SHALL APPLY
ENGINEER AND ALL AFFECTED AGENCIES IMMEDIATELY.
(909) 469-6327
CONTINUOUSLY AND NOT -BE LIMITED TO NORMAL WORKING HOURS, AND THAT THrE CONTRACTOR SHALL
03
CONSTRUCT
4"' SEWER LATERAL PER CITY STD PLAN. 2005
19 EA/ 633 LF
_FiE OWNER, T E ENGINEER AND THE CITY OF FONTANA HARMLESS FROM
DEFEND, INDEMNIFY AND HOLD T 17
34.NO CONCRrTE' SHALL BE PLACED UNTit.- niE' FORMS AND REINFORCING STEEL HAVE. BEEN PLACED, INSPECTED AND APPROVED.
FONTANA WATER COMPANY
ANY AND ALL LIABILITY, REAL OR ALLEGED, [N CONNECTION WITH 'THE PERFORMANCE OF WORK ON THIS
ATTN: MICHAEL. J. McGRAW
CONSTRUCT
8"' END PLUG
1 EA
PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOL.E. NEGLIGENCE OF THE OWNER, THE ENGINEER,
35.ALL UNDERGROUND UTILI'nES SHALL, BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF STREETS.
8840 NUEVO AVENUE
OR THE CITY OF FONTANA.
36.APPROVED, SOIL STE -T LIS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT.
-Rj4LAN
FONTANA, CA. 92335
(909) 822-2201
'RS AND VALVE BOXES SHALL, BE RAISED TO FINISHED GRADE BY THE PAVING CONTRACTOR UPON
37.ALL MANHOLES, CLEANOUT FRAMES, COVE
FAX (909) 823-504.6,
QUANTITY EST[MATES AREA PROVIDED FOR THE INFORMATION
AND CONVENIENCE OF THE DEVELOPER
COMPLETION OF PAVING.
CRAWORD CANYON,M� TUAL WATER �CO.
ONLY. THE
CONTRACTOR IS RESPONSIBLE FOR ACCURATELY
ESTIMATING QUANTITIES OF ALL
38.UPON COMPLETION OF CONSTRUCTION " CONTRACTOR SHALL RESTORE AU_ SIGNING, STRIPINGf BARRICADES, AND OTHER TRAFFfC CONTROL
ATTN: BASIL J. FABRIZ10
CONSTRUCTION ITEMS AND MATERIALS REQUIRED FOR THE COMPLETION OF THE PROJEur.
THE EXISTENCE AND- LOCATION OF ANY UNDERGROUND UTILITY PIPES OR SSTRUCTURES SHOWN ON THESE
DEVICES TO THE SATISFAC-nON OF THE. C[TY TRAFFIC ENGINEER.
(909) 463-958:0
�PLANS ARE OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS. TO THE BEST 'OF 'OUR KNOWLEDGE,,
THERE ARE NO EXISTING U11LITIES EXCEPT SHOWN ON THIS MAP. THE CONTRACTOR IS REQUIRED TO
'j 9 —BUILT DRAWNGS SHALL BE, PROMDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, VMO SHALL PROWDE RECORD DRAWING TO
AS
WEST SAN BERNANDINO WATER CO.
TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITY UNES AS SHOWN AND, ANY OTHER
THE CITY E'NGINEER.
UNES NOT OF RECORD OR NOT SHOWN ON THIS DRAWIN-G. PRIOR TO EXCAVATION, THE CONTRACTOR
ATTN: LON TSAI
SHALL CALL TOLL FREE, 1--800--422-4133 TO VERIFY THE UNDERGROUND LOCATION OF GAS AND
855 W. BASELINE ROAD
'rEf...t:,PH-'0NE LINES AT LEAST 48 HOU:RS PRIOR TO Tl-tE START OF EXCAVATION.
MAI TO� rA. 99377
us