Loading...
HomeMy WebLinkAbout4163-1- OARRIER --M*- J uj Z 04 z z ul L L -1:7-S STANDARD D MASTARMS S T A _RM S �8&_OET­ PED PUSH BT. x LLJ NTIN G W C) - - -------- GENERAL NOTESsm PROPOSED PROPOSED 1. 2 2 2 9 TYP., 3 TOTAL. RAIL SIGNAL TRAFFIC SIGNAL, SIGNING AND STRIPING, AND LI(AiTING SHALL CONFORM TO THESE —CA �8 _LE 2 14, GATES HOUSE PLANS, THE SPECIAL PROVISIONS, THE CITY OF fONTANA STANDARD DETAILS, AND -7 2 1 28' (BY (BY THE STATE OF CALIFORNIA STANDARD SPECIFICA FIONS SECTION 86 AND STANDARD ED 9 ig: ZL _]::=3 C/L RAIL 2 OTHERS) OTHERS) PLANS (DATE MAY 2006). 6T 5� C-) tNL.L CONDUIT AND CONDUCTORS ARE NEW. T_ IM* 1 2. LOCATION OF ALL UNDERGROUND FACILITIES ARE APPROXIMATE. THE CONTRACTOR —PROPOSED CANTELEVIER (BY OTHERS) SHALL POTHOLE TO DETERMINE THE EXACT L.00A flONS AND VERIFY ALL. CONDITIONS PISJ C4) 04 ul ON THE JOB SITE. HAND DIG FOUNDATIONS UN11L CLEAR OF ANY OBSTRUCTIONS. 0 —2600, TWO (2) WORKING EX. R W 01 0, uj 8 EX. PHONE UNDERGROUND SERVICE ALERT AT (800) 227 4 4 DAYS BEFORE DIGGING. rm flow line CL C> % 4 1 1 of shoulder 0', 5T 3. At L PULLBOXES SHALL BE No. 6 AND CONDUIT' SHALL BE 2"' RIGID METAL UNLESS CL 0� -- -------------- ­k�- "A" ­ . OTHERWISE SHOWN, 02 X---- - ------ EX C/G 001-B CONTRACTOR SHALL MAKE APPLICATION FOR ELECTRIC SERVICE AND SCI- EDULING 4 07 . ...... . ... 08 1 / 0 '24�k WITH SOUTHERN CALIFORNIA EDISON COMPANY 4 WEEKS IN ADVANCE OF NEED. F _F� 7/// 12 Mimi 0 4 4 co 5. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE ENGINEER FOR EXACT P*A 0OL8 %_ N --too_ s EQUIPMENT LOCATIONS PRIOR TO FINAL PLACEMENT. SEE r"DLE PLACEMENT DE s TAIL s m —ARM o8 5 THIS SHEET. W W — 6. ALL REQUIRED CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF G FONTANA ENGINEERING DEPARTMENT PRIOR TO COMMENCEMENT OF WORK. G G . ...... G -------- G R -CR — '12-, ( `__ 7. CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS, AND 03 19 0OLA____ SIDEWALK AFFECTED BY THE CONSTRUCTION TO THE SATISFACTION OF THE ENGINEER. Z>, MAST—ARM MOUNTING 8. CONTROLLER CABINET SHALL NOT BE SUBJECTED TO WATER FROM SPRINKLERS. CLAMP FOR OPTICAL DETECTOR MODIFY SPRINKERS SYSTEMS IF NECESSARY. _Ij cr 9 THE ALIGNMENT OF INT'ERCONNEC'F DUCTS SHALL BE AS STRAIGHT AS POSSIBLE. 11q: N q 5 ------ W ------ W_ 'I,— HOWEVER, WHEN CHANCES IN ALIGNMENT ARE NECESSARY, SWEEPS SHALL HAVE W E.L. J___ Z: LEGEND., T MINIMUM RADIUS OF 10 FEET. 04 T T T IMAGE SENSOR UNIT. Lo 10. ALL VEHICLE INDICATIONS SHALL. BE 12" AND HAVE L.E.D. SIGNAL MODULES. ALL T PROPOSED RAIL---' Q18 PEDESTRIAN HEADS SHALL HAVE L.E.D. PEDESTRIAN MODULES EQUIPPED WITH GATES (BY OTHERS) 17, 17 16 — -I-- — of 17 COUNTDOWN TIMERS (SEE SPECIAL PROVISIONS). UNI—DIRECTiONAL, SINGLE CHANNEL OPTICAL DETECTOR. 4 7 16 (j , ------ ------ 400-1011W �.%� EX. C/G 11. ANY EXISTING TRAFFIC SIGNALS AND LIGH"I"ING SHALL REMAIN IN OPERATION UNTIL 04 REPLACED WITH NEW CONSTRUCTION. 03 r5fl 12 EX. R7W 06 4, F_ 12. CONTRACTOR TO FURNISH ALL EQUIPMENT, MATERIALS, AND HARDWARE TO P p 04 04 13 EX. R/W AS NOTED CITY FURNISHED OR LISTED AS CITY PROVIDED IN THE SPECIAL CONSTRUCT THE TRAFFIC SIGNAL AND LIGHTING AS SHOWN ON THE PLANS, EXCEPT 6T 15 PROVISIONS. SLOVER 3: "ENUE NORMAL PHASE OPERA_n0N RAILROAD PRE—EMPTION 0 WHEN PRE—EMP-nON STARTS, IF T14E SIGNAL IS SERVING PHASE 2/6 THEN THE ACTIVE PHASE BECOMES YELLOW, FOLLOWED BY RED FOR ALL PHASES. WHEN PRE—EMP71ON STARTS, IF THE SIGNAL IS SERVING PHASE 3/7 OR PHASE 4/8 THEN PHASE 4 & 7 CYCLES OUT WHILE PHASE 3 & 8 REMAINS GREEN. TRACK CLEARANCE PHASE (PHASE 8 & 3 OLB GREEN) BEGINS, FOLLOWED BY YELLOW FOR PHASE 8 & 3 01-B , WHILE ALL OTHER PHASES REMAIN SOLID RED. 40 LIMITED SERVICE BEGINS WITH PHASE 2, 6 AND CONTINUES AS LONG AS TRAIN 18 CROSSING. AT END OF PRE—EMPTION, A SOLID RED INTERVAL. FOR ALL PHASES FOLLOWED BY NORMAL. PHASE SEQUENCE BEGINNING WITH PHASE 4 AND 8. POLE SCHEDULE L L -1:7-S STANDARD D MASTARMS S T A _RM S LUMINAIRE PED PUSH BT. SIGN AL-VOU NTIN G S. N. S. 'PI-ACIMENT R E �,,ItA, K S 0 0 c _jT TYPE aM7A I Lum. H.P.S.V. TYPE PHASE QOAD VEHICLE POLE PEI). MESSAGE A B JfNGHT LUM' OIRE M.A. T 24,A-4-10 _35' _35' 15 250 W 2 -MAS Sv_1__T SP -1-T Live Oak Ave -5.5 5.5, 2 TYPE I --A 7 TP- 1 --- T 8 iff 24A-4-100 35' 30f 15f 250 W B 8 S MAS SV -1-T Slover Ave 11, 4' 4 27-4-100 17 40 -- B - 2 -MAS SV -1-T SP -1 -CS 12' 4' 5 TYPE I -A . .... .. . .. . ..... TV- I -- T 4 6 29A- 5-100 35 55' 15' 250 W B 4 N 2 -MAS SV- 1 - T SP -1-4 Live Oak Ave 15.5 4 F=20' 7 19A-4-100 35 30' 1,5, 250 W B 4 N MAS SV- 1 -T SP -1 -Cs Slover Ave 10.5, 71 STRAIGHT LUMINAIRE M.A. T I 1-A Y� 10 B W -2-T -1-CS 1�.L 5 ALL EQUIPMENT IS NEW. POTHOLING IS REQUIRED FOR ALL POLES BEFORE FINAL PLACEMENT INSTALL 18" LOUVERS FOR PHASE 3 & 8, GREEN INDICATIONS ON POLE 1. - - -------- GENERAL NOTESsm PROPOSED PROPOSED 1. 2 2 2 9 TYP., 3 TOTAL. RAIL SIGNAL TRAFFIC SIGNAL, SIGNING AND STRIPING, AND LI(AiTING SHALL CONFORM TO THESE —CA �8 _LE 2 14, GATES HOUSE PLANS, THE SPECIAL PROVISIONS, THE CITY OF fONTANA STANDARD DETAILS, AND -7 2 1 28' (BY (BY THE STATE OF CALIFORNIA STANDARD SPECIFICA FIONS SECTION 86 AND STANDARD ED 9 ig: ZL _]::=3 C/L RAIL 2 OTHERS) OTHERS) PLANS (DATE MAY 2006). 6T 5� C-) tNL.L CONDUIT AND CONDUCTORS ARE NEW. T_ IM* 1 2. LOCATION OF ALL UNDERGROUND FACILITIES ARE APPROXIMATE. THE CONTRACTOR —PROPOSED CANTELEVIER (BY OTHERS) SHALL POTHOLE TO DETERMINE THE EXACT L.00A flONS AND VERIFY ALL. CONDITIONS PISJ C4) 04 ul ON THE JOB SITE. HAND DIG FOUNDATIONS UN11L CLEAR OF ANY OBSTRUCTIONS. 0 —2600, TWO (2) WORKING EX. R W 01 0, uj 8 EX. PHONE UNDERGROUND SERVICE ALERT AT (800) 227 4 4 DAYS BEFORE DIGGING. rm flow line CL C> % 4 1 1 of shoulder 0', 5T 3. At L PULLBOXES SHALL BE No. 6 AND CONDUIT' SHALL BE 2"' RIGID METAL UNLESS CL 0� -- -------------- ­k�- "A" ­ . OTHERWISE SHOWN, 02 X---- - ------ EX C/G 001-B CONTRACTOR SHALL MAKE APPLICATION FOR ELECTRIC SERVICE AND SCI- EDULING 4 07 . ...... . ... 08 1 / 0 '24�k WITH SOUTHERN CALIFORNIA EDISON COMPANY 4 WEEKS IN ADVANCE OF NEED. F _F� 7/// 12 Mimi 0 4 4 co 5. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE ENGINEER FOR EXACT P*A 0OL8 %_ N --too_ s EQUIPMENT LOCATIONS PRIOR TO FINAL PLACEMENT. SEE r"DLE PLACEMENT DE s TAIL s m —ARM o8 5 THIS SHEET. W W — 6. ALL REQUIRED CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF G FONTANA ENGINEERING DEPARTMENT PRIOR TO COMMENCEMENT OF WORK. G G . ...... G -------- G R -CR — '12-, ( `__ 7. CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS, AND 03 19 0OLA____ SIDEWALK AFFECTED BY THE CONSTRUCTION TO THE SATISFACTION OF THE ENGINEER. Z>, MAST—ARM MOUNTING 8. CONTROLLER CABINET SHALL NOT BE SUBJECTED TO WATER FROM SPRINKLERS. CLAMP FOR OPTICAL DETECTOR MODIFY SPRINKERS SYSTEMS IF NECESSARY. _Ij cr 9 THE ALIGNMENT OF INT'ERCONNEC'F DUCTS SHALL BE AS STRAIGHT AS POSSIBLE. 11q: N q 5 ------ W ------ W_ 'I,— HOWEVER, WHEN CHANCES IN ALIGNMENT ARE NECESSARY, SWEEPS SHALL HAVE W E.L. J___ Z: LEGEND., T MINIMUM RADIUS OF 10 FEET. 04 T T T IMAGE SENSOR UNIT. Lo 10. ALL VEHICLE INDICATIONS SHALL. BE 12" AND HAVE L.E.D. SIGNAL MODULES. ALL T PROPOSED RAIL---' Q18 PEDESTRIAN HEADS SHALL HAVE L.E.D. PEDESTRIAN MODULES EQUIPPED WITH GATES (BY OTHERS) 17, 17 16 — -I-- — of 17 COUNTDOWN TIMERS (SEE SPECIAL PROVISIONS). UNI—DIRECTiONAL, SINGLE CHANNEL OPTICAL DETECTOR. 4 7 16 (j , ------ ------ 400-1011W �.%� EX. C/G 11. ANY EXISTING TRAFFIC SIGNALS AND LIGH"I"ING SHALL REMAIN IN OPERATION UNTIL 04 REPLACED WITH NEW CONSTRUCTION. 03 r5fl 12 EX. R7W 06 4, F_ 12. CONTRACTOR TO FURNISH ALL EQUIPMENT, MATERIALS, AND HARDWARE TO P p 04 04 13 EX. R/W AS NOTED CITY FURNISHED OR LISTED AS CITY PROVIDED IN THE SPECIAL CONSTRUCT THE TRAFFIC SIGNAL AND LIGHTING AS SHOWN ON THE PLANS, EXCEPT 6T 15 PROVISIONS. SLOVER 3: "ENUE NORMAL PHASE OPERA_n0N RAILROAD PRE—EMPTION 0 WHEN PRE—EMP-nON STARTS, IF T14E SIGNAL IS SERVING PHASE 2/6 THEN THE ACTIVE PHASE BECOMES YELLOW, FOLLOWED BY RED FOR ALL PHASES. WHEN PRE—EMP71ON STARTS, IF THE SIGNAL IS SERVING PHASE 3/7 OR PHASE 4/8 THEN PHASE 4 & 7 CYCLES OUT WHILE PHASE 3 & 8 REMAINS GREEN. TRACK CLEARANCE PHASE (PHASE 8 & 3 OLB GREEN) BEGINS, FOLLOWED BY YELLOW FOR PHASE 8 & 3 01-B , WHILE ALL OTHER PHASES REMAIN SOLID RED. 40 LIMITED SERVICE BEGINS WITH PHASE 2, 6 AND CONTINUES AS LONG AS TRAIN 18 CROSSING. AT END OF PRE—EMPTION, A SOLID RED INTERVAL. FOR ALL PHASES FOLLOWED BY NORMAL. PHASE SEQUENCE BEGINNING WITH PHASE 4 AND 8.