Loading...
HomeMy WebLinkAbout4159-6SHRUB LEGEND _fw SYMBOL NAME QTY. SIZE REMARKS LIGUSTRUM JAPONICUM 'TEXANUM' 5 GAL 2'—o" O.C. TEXAS WAX—LEAF PRIVET ----------- TEMPORARY DETENTION BASIN PLANTING LEGEND SPABOL NAKE QTY. REMARKS SEED MI AVAILABLE THROUGH: T HYDRO SEED MIX 16olOO S.F. S&SSEED ALYSSUM SAXATILE, "CARPET OF SNOW" P.O. BOX 1275 OCCONERS LEGUME ESCHSCHOLIZA CALIFORNICA CARPINTERIA, CA. 93014-1275 —0436 (805) 684 MAINTENANCE ENTRY TEMPORARY D i (0 GATE BY OTHERS 1. WEED ERADICATION: A. WEED ERADICATION PROCEDURES: ALL IRRIGATED PLANTING AREAS SHALL RECEIVE THE FOLLOWING NNEED ERADICATION PROCEDURES AFTER THE IRRIGATION SYSTEM HAS BEEN INSTALLED AND ACCEPTED AND AFTER ALL BOXED AND 15 GALLON TREES HAVE BEEN INSTALLED AND ACCEPTED BUT PRIOR TO THE INSTALLATION OF SMALLER TREES, SHRUBS, GROUND COVER FROM FQTS (OR HYDROMULCH MIXES. B. MANUALLY REMOVE ALL EXISTING VEGETATION AND [DISPOSE OF IT OFF SITE. C. FERTILIZE ALL PLANTING AREAS WITH A COMMERCIAL FERTILIZER AT THE RATE OF THREE HUNDRED POUNDS (300) PER ACRE AND BEGIN WATERING PROCESS. D. WATER ALL PLANTING AREAS THOROUGHLY AND CONTINUOUSLY FOR A PERIOD OF THREE (3) WEEKS. THE LANDSCAPE ARCHITECT SHALL APPROVE A SPECIFIC WATERING DURATION AND FREQUENCY PROGRAM DESIGNED TO GERMINATE ALL RESIDUAL WEED SEEDS. E. DISCONTINUE WATERING PROCESS FOR TWO (2) DAYS AND THEN APPLY A CONTACT WEED 13LLEFZ AT MAXIMUM LABEL RATES. THE CONTRACTOR SHALL APPLY THE ABOVE AGENT TO A 7- PLANTING AREA OF APPROXIMATELY 1000 SO. FT. AND THEN EVALUATE EFFECTIVE COVERAGE OF NVEED SPECIES INVOLVED. THE CONTRACTOR SHALL MAKE APPLICATION ADJUSTMENT SUCH AS THE INCLUSION OF ADDITIONAL SPREADING AGENT OF! SPRAYING AGENT OR SPRAYING TECHNIQUES IN ORDER TO MAXIMIZE EFFECTIVE USE OF THE CONTACT WEED KILLER AS SPECIFIED ABOVE. NO IRRIGATION WATER SHALL BE APPLIED FOR A MINIMUM OF FOUR (4) DAYS FOLLOWING APPLICATION OF' THEE CONTACT WEED KILLER. LIMIT OF WORK F. WATER ALL PbANTING AREAS THOROUGHLY AND CONTINUOUSLY FOR A PERIOD OF THREE (3) ADDITIONAL WEEKS. A SHORTER WATERING PERIOD MAY BE PERMISSIBLE Kr THE DISCRETION OF t�-771= THE LANDSCAPE ARCHITECT IF HE SO DETERMINES THAT GERMINATION OF BALANCE WEED SEEDS NOT 117777177777 77 _777 '7777,77717ij!TiT t 7: A, IS SUFFIC3EENT FOR AN EFFECTIVE KILL. . . .. . ... K QAQ W"Alk"Ok'. ............. ? G. ALLOW PLANTING AREA SURFACE: To DRY FOR TWO (2) CONSECUTIVE DAYS WIT14OUT THE 0J� -FENCING AROUND Tx; IMF Z. Z APPLICATION OF IRRIGATION OR NATURAL WATER. "rESAFIVIARY DETENT10IN H. INSTALL ALL ONE (1) GALLON AND FIVE (5) GALLON TREES AND SHRUBS AS NOTED AND 01. Vill DETAILED. . . . . . . . BASIN 1. HYDROMULCH ALL SLOPE PLANTING AREAS WITH GROUND COVER AS NOTEED. 2. HYDROMULCH MATERIALS: TA �0 H MIX SHALL CONSIST OF THE FOLLOWING COMPONENTS ON A PER ACRE BASIS. g . . . . . . .. HYETROMUL(> N 1 2000 LBS. PER ACRE CELLULOSE FIBER 2. 300 LBS. 16-6-8 COMMERCIAL FERTILIZER 3. 300 LBS. UREA FORMALDEHYDE 0 �% _� V, _� �.� -A 00 V At. 1000 LBS. AGRICULTURAL GYPSUM 3. SEEDMIX: THE APPROPRIATE OVER SEED SEEDMIX AS LISTED BELOW AND THE APPROPRIATE WATER VOLUME SHALL BE MIXED IN THE HYDROSEEDING, MACHINE WITH EACH OFF THE SPECIAL COMPONENTS TO 04 ALLOW FOR EASY APPLICATION WITHOUT CLOGGING THE HYDROMULCHING MACHINE. a j MAW% "CARPET OF SNOW" 6 LBS. ALYSSUM SAXATILE, 4 4 LBS. OCCONERS LEGUME . . . . . .. . . . . . . .. 4 LBS. ESCHSCHOLIZA CALIFORNICA 4. MAINTENANCE PROCEDURES: HYDROMULCH AREAS. A Ya 0 tin 0 sw. . . . . . . . . . . . . . . . . A. GENERAL: T14E GENERAL CARE AND MAINTENANCE OF ALL. AREAS SHALL CONSIST OF PROPER WATERING, FERTILIZATION, WEEDING, CLEAN—UP AND AS NOTED BELOW. V, E3. HYDROSEED MIX AREAS: GERMINATION STAGE IRRIGATION: APPROXIMATELY TWENTY—FIVE (25) HOURS AFTER HYDROMULCHINC THE PLANTING AREAS, THE WATERING SEQUENCE SHOULD BE INIATED. THE WATER SHOULD BE LEFT HE DEPTH OF THE FIBER TAKING CARE ON LONG ENOUGH TO MOISTEN THE SOIL THOROUGHLY TO Th AV NOT TO SUPER SATURATE OR TO WASH THE FIBER OF SOIL PARTICLES OFF THE SLOPES AS THE CONTRACTOR WILL HAVE TO REPAIR ALL SEED WASHING OR EROSION AT HIS OWN EXPENSE. j FURTHERMORE,, IT MUST BE BROUGHT TO MIND THAI- THE FIBER AND SEED MUST BE IRRIGATED FREQUENTLY TO MAINTAIN OPTIMUM MOISTURE CONTENT FOR MAXIMUM GERMINATION. AT ALL TIMES THE IRRIGATION SYSTEM MUST BE OBSERVED WHILE IN OPERATION. IRRIGATION SEQUENCE MUST BE DETERMINED BY AIR TEMPERATURE, PREVAILING WIND VELOCITY, SOIL TEXTURE,, ORIENTAION AND OTHER LOGISTICAL PROBLEMS. IT IS IMPERATIVE THAT THE SOIL BE KEPT MOIST AT ALL TIMES DURING THE: GERMINATION PERIOD. THE LIGHT, FREQUENT IRRIGATION SEQUENCE SHOULD CONTINUE A, UNTIL THE SEEDLINGS HAVE GROWN BEYOND THE GERMINATION STAGE. ESTABLISHMENT STAGE IRRIGATION: THE IRRIGATION SEQUENCE (FREQUENCY) SHALL BE C. 4 0 REDUCED WHILE: THE DURATION OF EACH WATERING CYCLE SHALL BE INCREASED. A SPECIFIC WATERING PROGRAM SHALL BE DETERMINED BY THE LANDSCAPE ARCHITECT BUT SHOULD % THE C —SEED ALL NON—GERMINATING OR ERODED AREAS —HYDROSEED APPROXIMATE WATERING ONCE A DAY THROUGH COMPLETION OF THE MAINTENANCE PERIOD. E. RE—SEEDIN& CONTRACTOR SHALL RE NON -IRRIGATED. SEE % AT THE END OF THE INITIAL. THIRTY (30) DAY MAINTENANCE PERIOD. Avol LEGEND THIS SHEET F. FINAL ACCEPTANCE WILL BE GIVEN AT THE END OF THIRTY (30) DAYS MAINTENANCE ONCE 0 �q v vc m," "' �­' "' ""', , I" , , - 0 I �04641 FOR SEED FORK 40% GERMINATION AHS BEEN OBTAINED. AT AT THE END OF SIXTY (60) DAYS EXTENDED Tx BEEN OBTAINED. AT THE MAINTENANCE ONCE 60% GERMINATION AND PLANT ESTABLISHME14T HAS E END OF NINETY (90) DAYS EXTENDED MAINTENANCE ONCE 70% GERMINATION AND PLANT smsommi MORMON lemmas' ESTABLISHMENT HAS BEEN OBTAINED. LIMIT OF WORK 4 13. WEEDING: ANYCONCENTRATED DEVELOPMENT OF WEED GROWTH THAT MAY APPEAR IN PLANTING AREAS DURING THE MAINTENANCE PERIOD SHALL BE REMOVED AT THIRTY (30) DAY DETENTION BASIN TO BE INTERVALS. THE CONTRACTOR MAY ELECT TO REMOVE SUCH CONCENTRATION OF WEEDS MANUALLY MAINTAINED BY1 OR BY AN APPROVED HERBICIDE PROGRAM. H. FERTILIZATION: MAINTENANCE WORK SHALL INCLUDE ONE (1) APPLICATION OF BEST SIERRA LAND ASSOC., ILLAC FERTILIZER COMMPANY 16-6-8J OR EQUAL AT THE RATE OF 6 LBS. PER 1000 So. FT. TO 1122 WILLOW sorREET, SUITE 200 MAINTENANCE PERIOD AND AT THIRTY (30) DAY INTERVALS THEREAFTER OF EXTENDED SAN JOSEEv CA 95125 MAINTENAN CE PERIODS. 1. CLEAN—UP: DURING THE (COURSE 0 FTHE MAINTENANCE WORK, THE CONTRACTOR SHALL SFILLWAY REMOVE SURPLUS MATERIALS AND DEBRIS FROM THE SITE AND SHALL KEEP THE PREMISES IN A BY OTHERS NEAT AND CLEAN CONDITION AT ALL TIEMS. 5. CLEANUP: UPON COMPETION OF EACH PHASE OF PLANTING WORK, THE CONTRACTOR SHALL THOROUGHLY CLEAN THE SITE OF ALL ACCUMULATED RUBBISH, DEBRIS AND OTHER EXTRANEOUS MATERIAL. GRAPHIC SCALE lan4 are+ w 20 0 10 20 40 InN FEET 3901 westerly place # I I I newpoq bawlt ca 92660 1, NO ft. t 9492245040 t 9442210044 www.tandarewest.com nf-rV nf_7 17nNf-rAKJA nAl IC-nDKIIA I kjvv L -L -W L-kjvv 'DERGROUND SERVICE ALERT S T h! E R IRA F1 R 1 (3/1. R. C. E. 15 15 2 A PUBLIC SERVICE BY UN STANDARDS IN EFFECT. F 11 U P�, nA �L 1 01, 9 Ist Li Q_ cf) C)