Loading...
HomeMy WebLinkAbout4149-8PLAN NOTES -0 lspj�j (1) 4"C.O. TO SCE PICKUP POINT VERIFY EXACT LOCATION PRIOR TO ROUGH—IN. CONTRACTOR SHALL INCLUDE COORDINATION AND ALL OTHER COST IN BID. 3/4"C. 2 #8 & I #10 E/(;. lnC. 4 #8 & 1 #10 E/G (C-1.3 & 5.7). CONC 1"C. 4 #8 & 1 #10 E/(;. (C-1,3 & 5.7) ROUTE CONDUIT AROUND UGHT FIXTURES. (1) Vt. 4 #8 & 1 #10 E/G. (C-1.3 & 5.7) bi ROUTE CONDUIT AROUND UGHTn)ffURES. Q254, (1) 3/40C. 2 #8 & 1 #10 E/G. (C-9,11). Lj 1 1/4' #8 & 1 #10 E/G. (C 9sl 1) ROUTE CONDUIT AROUND UGHT FIXTURE. Lij (1) 1 1/4"C. 6 #8 & 1 #10 E/G. (1) 3/4"C. 2 #8 & 1 #10 E/G. (C -13v`15). C-90 1 VERIFY EXACT LOCA71ON WITH C17Y PRIOR TO C-901 1 Oft ROUGH—IN. 5 V.D.=2.55% C-5 7 4 3 Mom c— c 5v7 C-5 7 3 3 C-5,7 --- V.D.=2.97% 2