HomeMy WebLinkAbout4102-63.04 Piping
X Piping under existing concrete pavement must be installed in sleeves 212 -times the outer diameter of the
pipe which is being sleeved. No hydraulic driving is permitted under any concrete pavement,
B� CLItting or breaking of existing pavement is not permitted without written permission from the owner.
G � Install pipe with all marking up for visual inspection and verification.
D� Remove all dented and damaged pipe sections.
E. Contractor shall install concrete thrust blocking at all changes of direction and terminal points of pressure
pipe.
F All lines shall have a rninimum clearance of 4 inches from each other and 6 inches from lines of other
trades.
G, Parallel lines shall not be installed directly over one another.
K Make all joints in strict accordance with the manufaCtUrer's recommended methods; allow solvent welds
at least 15 minutes setup time before moving or handling and 24, hours curing time before filling.
1. All threaded plastic -to -plastic connections shall be assemWed using Teflon tape.
J. For plastic--to-metal connections, use non -hardening pipe dope on all threaded p last i c -to -metal
connections, except where noted otherwise.
K. Piping shall be snaked trorn side to side in trench bottom to allow for expansion and contraction
All specifications shall conform to the City of Fontana Community
Development Departments landscape standards found in the Engineering
Division Specification Manual for Streetscapes and Parks.
RAK
UN
co
'Woo
PAM
%
06
Ct)
cc
am
IWA
(0
MWO
4pa
mom
a W=
mom
now
CL
(a
mom
C:
cc
r.L
F
ZZ
CO3
C63
W6
mJ
5heet L�e5cnpfion:
I rrig a tion
Specifications
Kevic>ion5.