HomeMy WebLinkAbout4009-2WLY R/W
STREET
86'
m
m
MATCHLINE
CURB FAQE
5" O.C,i
TYP
PPOP. DIXE
N TS,
SHOULD CONSTRUCTION OF THE REQUIRED
IMPROVEMENTS NOT COMMENCE WITHIN TWO
YEARS OF THE DATE OF' APPROVAL SHOWN HEREON
AND CARRIED FORTH IN A DILIGENT MANNER, THE
CITY ENGINEER MAY REQUIRE REVISIONS TO THE
PLANS TO BRING THEM INTO CONFORMAN'CE WITH
Sl ANDARDS IN EFFECT,
GENERAL STORM DRAIN NOTES
AC
ASPHALT CONCRETE
1. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLAN$, THE CITY OF FONT' STANDA"'IRD PLANS, THE CONTRACT
�_j 2
AMERICAN PUBLIC WORKS ASSOCIATIGN
PROV15IONS ANO THE STANDARD SPECIFICATION5 FOR PUBLIC WORKS CONSIRUCTION ("GREEN BOOK-) ALL REFERENCE
SIDE
VIEW ELEVATION
BENCHMARK
12
2� WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTR T DOCUMENTS THAT CANNOT BE RESOLVED BY
BT
BOTTOM
REFERENCE TO PPtCLDENCE PROVISIONS IN THE "OPEC14 BOOK", THE CONTRACtOR SHALL IMMEDIATELY REPORT SAID
Q_UgLIT
RON_
L
FENQ! NTAIL
C&G
CURB AND GUTTER
NTS
cB
2 LSITR _UC M 02 N A 01 F,5:
RPME.S.
<�>
EXISTING TOP & BOTTOM RAIL
A.
ALL JOINTS & JOINS SHALL BE CONTINUOLISLY
<2
POSTS
WELDED- GRIND ALL WELDS SMOOTH.
tNGINEEPING DIVISION MOR TO THL START OF ANY WORK 11145PECTION COMINAtION SHALL BE REQUESTED AT LEAST
EXISTING CORNER
CURB FACE
ALL WELDS AND ABRASIONS SHALL BE METALIZED
CSPA
EXISTING MID POST
350-7610�
PER SEC. 210-351.
CORRUGATED STEEL PIPE
6. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES DESCRIBED IN THE
B.
ALL TUBULAR STrEL FENCING, GATE, COMPONENTS,
STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON -METRIC EDITION UNLESS OTHERWISE DIRECTED BY
MATCH EXISTING
CUBIC YARDS
ANO PAINT SHALL M CH EXISTING FENCE,
<�>
CONCRETE FOOTING
C.
THE INTENT OF THIS DRAWING IS TO SHOW DESIGN
<6>
3/8% 2" STEEL BOLTS
DWY
CONCEPT ONLY. CONTRACTOR IS TO PROVIDE SHOP
8. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR TRENCHES 5 FEET OR
E/O
EAST OF
DRAWINGS TO ENGINEER FOR APPROVAL.
EA
WELDED TO ALL POSTS
D.,
FENCE RAILS SHALL BE INSTALLED PARALLEL TO
<7>
CONCRETE SLAB OR SIDEWALK
EG
FINI'SHED GRADE- POSTS SHALL
INDUSTRIAL SAFETY OF THE STATE OP CALIFORNIA. TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN
EL
ELEVATION
BE PLUMBED VERTICAL.
EOP,EP
EDGE OF PAVEMENT
E�
GATE AND FENCE HEIGHTS, INCLUDING ALIGNMENT
FOR THAT PURPOSE.
EX
SHALL MATCH EMSTING F�,NCE.
PPOP. DIXE
N TS,
SHOULD CONSTRUCTION OF THE REQUIRED
IMPROVEMENTS NOT COMMENCE WITHIN TWO
YEARS OF THE DATE OF' APPROVAL SHOWN HEREON
AND CARRIED FORTH IN A DILIGENT MANNER, THE
CITY ENGINEER MAY REQUIRE REVISIONS TO THE
PLANS TO BRING THEM INTO CONFORMAN'CE WITH
Sl ANDARDS IN EFFECT,
GENERAL STORM DRAIN NOTES
AC
ASPHALT CONCRETE
1. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLAN$, THE CITY OF FONT' STANDA"'IRD PLANS, THE CONTRACT
APWA
AMERICAN PUBLIC WORKS ASSOCIATIGN
PROV15IONS ANO THE STANDARD SPECIFICATION5 FOR PUBLIC WORKS CONSIRUCTION ("GREEN BOOK-) ALL REFERENCE
SPEC 11FICATIONS AND STANDARDS SHALL BE THE LAT�ST EDITION UNLESS OTHEPWISE NOTED.
Bm
BENCHMARK
2� WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTR T DOCUMENTS THAT CANNOT BE RESOLVED BY
BT
BOTTOM
REFERENCE TO PPtCLDENCE PROVISIONS IN THE "OPEC14 BOOK", THE CONTRACtOR SHALL IMMEDIATELY REPORT SAID
Bw
BACK OF WALK
CONFLICT TO THE CITY ENGINEER FOR RESOLUTION,
C&G
CURB AND GUTTER
3. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER.
cB
CATCH BASIN
4. A CE CONSTRUCTION SIGNING INDICATING DURATION OF PROJECT SHALL BE IN PLACE ONE WEEK PRIOR TO
CL
CENTER LINE
IMPLEMENTING DETOURS,
CLF
CHAIN LINK FENCE
5. CONSTRUCTION PERMITS SPKLL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT,
tNGINEEPING DIVISION MOR TO THL START OF ANY WORK 11145PECTION COMINAtION SHALL BE REQUESTED AT LEAST
CF
CURB FACE
TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL (909.)
CSPA
CORRUGATED STEEL PIPE - ARCH
350-7610�
csp
CORRUGATED STEEL PIPE
6. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES DESCRIBED IN THE
STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON -METRIC EDITION UNLESS OTHERWISE DIRECTED BY
cy
CUBIC YARDS
THE CITY TRAFFIC ENGINEER.
DIA
DIAMETER
7� IT SHIALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC
DU
DUCT
CONTROL DEVICES AT ALL TIMES
DWY
DWY
8. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR TRENCHES 5 FEET OR
E/O
EAST OF
GREATER IN DEPTH FROM T14E CALIFORNIA STATE DtVISIGN OF INDUSTRIAL SAFETY.
EA
EACH
9. THE WALLS AND FACES OF ALL EXCAVATIONS GRFATER THAN FIVE (5 FEET IN DEPTH SHALL BE GUARDED BY SHORING,
%
SLOPING OF THE GROUND OR OTHER APPROVED MEANS PURSt THE REQUIREMENTS OF THE DIVISION OF
EG
EDGE OF GUTTER
INDUSTRIAL SAFETY OF THE STATE OP CALIFORNIA. TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN
EL
ELEVATION
THE POTENTIAL EXISTS FOR GROUND MOVEMENT.
EOP,EP
EDGE OF PAVEMENT
10. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT OBTAINING A SEPARATE PERMIT
FOR THAT PURPOSE.
EX
EXISTING
FG
FINISH GRADE
11. THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION, HOWEVER, IT SHALL BE
THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND ELEVATION OF ANY
FH
FIRE HYDRANT
EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTION TO AVOID DAMAGE THERETO THE CONTRACTOR SHALL
CONTACT UNDERGROUND SERVICE ALERT AT 1-800-227-2600 TWO WORKING DAYS BEFORE EXCAVATION.
FL
FLOW LINE
FS
FINISH SURFACE
12. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING BUT NOT LIMITED TO,
GAS, TELEPHONE, ELECTRIC1, CABLE T'ELEVIS-10N, LANDSCAPING ' LANDSCAPE IRRIGPION, DOM&,�IC WATER, RECLAIMED
GB
GRADE BREAK
WAT�R, SEWER, STORM [0114, FLOM CONIROL AND CALTRANS ALL UTILIlY COMPANIES SHALL 8,E GIVEN TWO WORKING
DAYS NOTICE PRIOR 'ro WORK AROUND T14EIR FACILITIES.
HP
HIGH POINT
INCL
INCLUDING
13 THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES WITHOUT APPROPRIATE AGENCY
AUTHORIZATION COWRACTOV SHALL COOMNATE WITH THE APPROPMATE WATER COMPANY FOR VALVE OPtPATION AND
INV
INVERT
WATER REOUIREMENTS.
IRR
IRRIGATION
14, STATIONING REFERS TO THE CENTERLINE OF STORM DR, IN EXCEPT WHERE OTHERWISE NOTED.
is
JUNCTION STRUCTURE
15. ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO
LC
LENGTH GN CURVE
CONSTRUCT T14E WORK TO THE PLAN, GRADES. THt CONTMCTOR SHALL BE R�SPONSIBLE YOR THE PRESERVATION OF
BENCHMARKS AND CONS.TqUCIION CONTPOL STAKING DURING CONSTRUCTION.
LF
LINEAR FOOT
LP
LOW POINT
16. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCH MARKS WITHOUT
PRIOR NOTIFICATION TO THE CITY ENGINEER.
MAX
MAXIMUM
17. REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUMNG SURVEY MONUMENTS MONUMENT TIES AND
MB
MAILBOX
BENCH MARKS, SHALL BE DONE BY A REGISTEkED CIVIL ENG"INEER OR LICENS8 LAND SUik'Y6� SURVEY MONUMENTS
THAT WILL BE DESTPOYED AS A RE�SULT OF THIS CONSTRUCTION SMALL BE REPLACED THE CONTRACTOR SHALL NOTIFY THE
ME
MATCH EXISTING
ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO MONUMENTS CAN BE ESTABLISHED FOR LATER
MIN
MINIMUM
REPLACEMENT OF THE MONUMENT.
N/0
NORTH OF
18. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESI'DENTS AND BUSINESSES AT ALL TIMES A MfNIMUM 12 FOOT
LANE SHALL BE MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDtNTS AND EMERGENCY VEHICI-ES.
NTS
NOTTO SCALE
OH
OVERHEAD
19. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING ADEOUATE
WA10ING, AT ALL TIMES.
Pcc
PORTLAND CEMENT CONCRETE
20. THE CONTRAACTOR SKALL NOT CAUSE ANY EXCAVATED M"ATTERk MALID SILT OR DEDWS TO BE DEPOSITED ONTO PUBLIC
pp
POWER POLE
OR PONATE PROPtRTY AbtJACt.NT TO THt RIGHT OF WAY DURIN"G CO'N'�TRLICTION WITHOUT PRIOR WRITTEN APPROVAL.
PROP
PROPOSED
21. NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APOROVAL OF THE CITY INSPECTOR.
R/W
OITGHT OF WAY
22. A GEOTECHNICAL EN0l`IN*t,ER SMLL CERTIPY ALL BACKFILL COMPACTION, PAILUIPE TO 08T IN THE REQU100 DENSITY
ROE
RIGHT OF ENT�Y
SHALL �EQLIIRr RE -WORKING OF !HAT PORTION OF' THE WORK UNTIL !'HE SPtclFlt'D DrNs.11y is, 08TAINED,
S/0
SOUTH OF
IN 0 9 i , '0 EM, Ntc
23. CARE SHOULD BtWEN TO PRENE'NT ORA S 0ITCHES", AND gft,LES FROM UNDE,,"RUIN T,,Rr.,tT IMPR V t, 'S
S D
STORM DRAfN
uPON INSPECTION' OP THE 51TE, TH'E, CITY R"tNEER MAY REOuiRE TtMPORAPY NON-EROOEABLE SWALES ENTf,,-,RIN'G? OR
LEAVING IMPROVEWNTS.
SF
SQUARE FEET
SL
STREET LlI0,Hl
24. ALL EXPOSED CONCRETE SUMCES. SHALL CON"P0410 IN GRA'Ot, COLOR AND FINISH TO MATCH EXIS'TING CONCRETE.
ST'D
STANDOD
25. NO OPEN TRENCH SHALL BE ALLOWED AT THE END OF THE DAY W11HOUT PRIOR APPROVAL OF THE CITY ENGINEER,
Sw
SIDEWALK
26., PRIOR TO CONSTRUCTION THE CONT' M` `CTOR SHALL EXPOSE tXISTING, FACILITIES AND VERIFY ELEVATION AND
TC
TOP OFCUR8
LOCATION OF CONNECTIAS, tilY APPROVAL OF CONNECTIONS TO EXISTING �ZILITIES OOES NOT IMPLY CORRECTNESS OF
ELEVATIONS OR LOCATIONS SHOWN ON THt PLANS,
TG
TOP OF GRATE
27. IF EXISTING UTILITIES OR ANY OTHER FACILITI S CONFLICT WITH THE PRM'Ssto IMPROVEME`NTS, THE CONTRACTOR
TS
TRAFFIC SIGNAL
SHALL NOTIFY THE ENONtER AND ALL AFFECTEI) AGENCIES IMMEOIAT"ELY.
Typ
TYPICAL
28. NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND RER4FORCING STtEL HAVE KEN PLACED, INSPECTED AND
W/o
WEST OF
APPROVED.
WF
WOOD FENCE
29. ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TLSTED AND APPROVED PPIOR TO PAVIMG OF STREETS.
wm
WATER METER
30. APPROVED SOIL S.T�RILANT IS REOUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT.
wv
INATER VALVE
L S S
am m��Vm
34. MINIMUM D -LOAD FOR ALL RCP IS 1350.
Uf
U �