HomeMy WebLinkAbout4166-1I
W
D
Z
W
W
0
Z
W
.J
0
i
F1
0 1 a
TT
Anchor Bolt
Int.
Integral
A.C.
TTI
11 12
10
TT
Junction Box
Adj.
Adjacent
13
14
15
16
- - . � I -AST
Underground, Sprvice A
i V 51 �IL, �,L Call: TOLL FREE
1-o,800
A 0%45
TWO WORKING DAYS, BEFORE YOU DIG
W
0
Z
W
0
U)
W
0�
0.
0
IN
SCALE: MT.&
FONTANA, CALIFORNIA
KB HOME POMONA, CA
A I IONS
A.B.
Anchor Bolt
Int.
Integral
A.C.
Asphaltic Concrete
J. Box
Junction Box
Adj.
Adjacent
its.
Joints
Aft.
Alternate
LA.
Landscape Architect
Arch.
Architect
Lic.
Licensed
Auto,
Automatic
L.P.
Low Point
Bldg.
Building
Max.
Maximum
Blk.
Black
M.B.
Machine Sot
B.M.
Bench Mark
Mech.
Mechanical
B.S.
Bottom of Steps
Med.
Medium
C.S.
Catch Basin
Min,
Minimum
C.F.
Cubic Foot
M.H.
Manhole
C.I.
Cast Iron
Multi.
Multimbranched
C,I,P.
Cast Iron Pipe
Nat.
Natural
C.J.
Cold Joint
N.I.C.
Not in Contract
C.L.
Center Line
O.C.
On Center
CIr.
Clearance
O.D.
Outside Diameter
C.O.
Clean Out
PA.
Planting Area
C.M.P.
Corrugated Metal Pipe
Perf.
Perforated
Comp.
Compacted
P.O.C.
Point of Connection
Con.
Concrete
P.S.I.
Pounds Per Square
Cond.
Condition
P.T.
Pressure Treated
Cont.
Continuous
P.V.C.
Poly Vinyl Chloride
Ct.
Center
R.
Radius
Ctr. Sink
Counter Sink
R.C.P.
Reinforced Concrete
D.D.
Deck Drain
Rebar
Reinforcing Bar
D.P.
Douglas Fir
Rein.
Reinforcing
D.G.
Decomposed Granite
Reqd.
Required
Dia.
Diameter
Ret.
Retardant
Dim.
Dimension
Rgh.
Rough
Dtl.
Detail
R.S.
Rough Sawn
Ea.
Each
R.S.R.
Rough Sawn Redwood
E.J.
Expansion Joint
Rwd.
Redwood
Elec.
Electric -
Sch.
Schedule
2lev.
Elevation
S.F.
Square Foot
Eng.
Engineer
Sht.
Sheet
Esp.
Espalier
Sht. Mtl.
Sheet Metal
Eq.
Equal
Sim.
Similar
E.W.
Each Way
S.L.
Scoreline
E.W.W M.
Electric Welded Wire Mesh
Smth.
Smooth
Ex.
Existing
Specs.
Specifications
Exp.
Exposed
Sq.
Square
F.5,
Finish Floor Elevation
StI.
Steel
F.G.
Finish Grade
T.A.D.
Top of Area Drain
F.H.
Fire Hydrant
T&B
Top and Bottom
Fin.
Finish
T.B.
Top of Berm
F.L.,
Flow Line
T.C.
Top of Curb
FIt.
Flat
Tex.
Textured
F.S.
Finish Surface
T.G.
Top of Grate
Ftg.
Footing
T.G.D.
Top of Grate Drain
Ftn.
Fountain
Thk,
Thick
Ga.
Gauge
T.P.
Top of Paving
Galv.
Galvanized
T.P.C.
Top of Poll Couping
G.C.
Ground Cover
T.S.
Top of Steps
G.I.
Galvanized Iron
T.W.
Top of Wall
H.S.
Hose Bib
TWI.
Trowel
Hdr. Brd.
Header Board
Typ.
Typical
Horiz.
Horizontal
Vert.
Vertical
H.P.
High Point
W/
With
Hgt.
Height
W/o
Without
I.D.
Inside Diameter
W.S.
Water Surface
Inv.
Invert
B.C.R.
Beginning of Curb Radius
E.C.R.
End of Curb Radius
L-4
%10' %I*r I TA %of 1 *1 IL %A*f %of I I %NOT 1 19 &Nor 116am If I Is I 116� %10
IRRIGATION PLAN
-Pre-Constuction Meeting
Inspection of irrigation system in open trench condition (prior to backfill). Mainline pressure test @ 150 P.S.I. for a
three (3) hour continuous period.
-irrigation coverage tests including initial and final tests.
L-5
IRRIGAT10N DETAILS
-Finish grade prior to planting.
Plant materials prior to planting and soil preparation.
L�6
PLANTING PLAN
-Planting, including street trees. Contact the Parks Planning & Landscape Development Sedion, Engineering
Division, for species and final locations.
-Compliance with approved plans.
PLANTING DETAILS'
Rnal Inspection.
�L-7
3. The Owner's representative and landscape contractor shall be present at each inspection.
L=8
M I I%[
C01`10STRUCT101041 SPECS.
MAINTENANC-E-G-U.IDELINES1
L-9
IL in
IR"R. AND PLANTING SP&ECS.
Landscape shall be maintained in a neat, clean, weed -free and healthy condition. For three (3) months (90 days) following
installation, this shall include but not be limited to:
1 . Cultivation of planted beds at intervals not to exceed ten (10) days.
2. Regular mowing to maintain lawn height not to exceed two (2) inches. (will vary with species).
DESIGNED $Y
KPF
3. Regular pruning of plants as necessary to control and direct growth.
4. Scheduled maintenance of irrigation controller to assure proper application rate of water necessary for proper plant growth.
Drip irrigation may require specialized landscape maintenance care.
5. Immediate replacement of ireigation materials as needed to maintain good working conditions.
6. Fertilization on a regular schedule as recommended by the manufacturer to provide proper plant growth.
C1-1ECW_D BY
JRC/KPF
7. Immediate repair or replacement of irrigation materials as needed to maintain good working conditions.
rOMNO.:
4156
9
8. Stakes, guys & ties on trees shall be checked regularly for correct function. Ties are to be adjusted to avoid abrasions or
girdling of trunk or branches.
REVISION DESCRIPTION�
DATE
9. Upon completion of three (3) month (90 day) contract maintenance period, an inspection shall be made by the Community
Development Department Engineering Division Landscape Inspection Staff. The landscape shall be maintained in
.....
DATE
accordance with these landscape maintenance standards.
1.0. The Developer/Builder is responsible to contact the City and schedule the maintenance inspection.
CTT_Y_R EQ.U1BFJ1X0_TES;-
All plans must be installed in accordance with the Standard Landscape Specification Manual For Streetscapes And Parks. The
specifications can be purchased at the Engineering counter at city hall. 8353 Sierra Ave., Fontana, CA 92335, www.fontana.org
A
ARCHITERRA DESIGN GROUP HEREBY CERTIFIES THAT THE DESIGN, DETAILS AND
SPECIFICATIONS AS REPRESENTED HEREIN MEET PROFESSIONAL LANDSCAPE
ARCHITECTURAL STANDARDS. ARCHITERRA DESIGN GROUP CANNOT GUARANTEE
THE QUALITY OF CONSTRUCTION, INSTALLATION OR MAINTENANCE OF IMPROVEMENTS
AS DESIGNED AND/ORSPECIFIED HEREIN AND DISCLAIMS ANY FUTURE LIABILITY
RESULTING FROM DEVIATIONS. ARCHITERRA DESIGN GROUP IS NOT RESPONSIBLE
FOR THE AMOUNT OR FREQUENCY OF IRRIGATION WATER APPLIED TO THE PROJECT
DURING CONSTRUCTION OR THEREAFTER.
AIJPROVALS:�
SHOULD CONSTRUCTION OF THE REQUIRED
IMPROVEMENTS NOT COMMENCE WITHIN
TWO YEARS OF THE DATE OF APPROVAL
SHOWN HEREON AND CARRIED FORTH IN A
DILIGENT MANNER, THE CITY ENGINEER MAY'
REQUIRE REVISIONS TO THE PLANS TO
'BRING THEM INTO CONFORMANCE WITH
CONDITIONS AND STANDARDS IN EFFECT.
-TtzCrrY OF FONTANA, CALIFORNIA
DRAWN BY
KP
MEADOWOOD
TRACT. # 17460
'U
----COMM W" FACM11,11ES DISTRICT
SCALE:
N/A
DESIGNED $Y
KPF
DATE:
8/15/06
C1-1ECW_D BY
JRC/KPF
APPMVED BY: DATL
a?;�
CITY ENGINEER RC.E 51152 EXP. DATE 1201/06
rOMNO.:
4156
9
7
REV
REVISION DESCRIPTION�
DATE
CITY
.....
DATE
�DEVELOPER:
SCALE: N.T.S.