Loading...
HomeMy WebLinkAbout4082-4wim 31Z A �5M 0 300 mm(94CH21) EACH WAY — 5 mm0/4")R- mm �l _. LLJ 3.2 (4')R N SLOPE S �20 P E "'-FLOW LINE 75 FACE ___� __r DOWEL ZE' PLATE (TYP. I E E E SCORING LINE---- 'CURB LINE + w z tF 2 EXTRA 15M(*4) STEPS ON 2 SIDES OF MANHOLE FRAME 100 mm (41WN. AND COVER 7— 300 mm 75 mm CATCH BAS _:K112")MAX. (3-)R MANHOLE F AND COVER I N E' RAMC) o I- 0 uj >. t 0 :rf,- L CC 4 L OPTIONAL SUBGRADE CONNECTOR PIPE < OR MONOLITHIC =z' Z__: Zt-: CATCH BASIN 2,n s CONNECTION �-z 0: Q-0 00 STEPS SECTION A -A E too L--200 ""(S.) cc DOWEL (TYP.)---/ M:QD' PLAN J PLAN CORNER �_Q_NNECTION A� N mm / / Tl'2�_)_MlN\\ / �A r75 mm (3') R.\, P LAN SIDE CONNECTION STRUCTURAL DATA E BAIRS-2 ABOVE a CURB �OPENING — — — — — — uj E O� 2 BELOW OPENING " uj (2') CL� > t G BARS C BARS -15M 0 450 mm (&4 0 181) (3 300 mm (120) MIN. T- ...................... ----------- _"�-75 mm (,3*) MIN. ------------------------- G BARS 0 A 300 mm 021 MIN. TYPICAL t Ll FLOW LINE PROFILE FLOW LINE BARS -2 ABOVE 2 BELOW OPENING a V, UJ < N L w D N CURB OPENING — — — — — — 7� 15M 0 450 mm 0 mm 15M 0 45 1 mi 0 uj (s4 0 181) (o4 0 180)— CURB POINI A—POINT D POINT B POINT C & U�T ER C BARS 6 uj 0 < < U- POINT F POINT G DIRECTION OF FLOW PLAN -—DIRECTION OF FLOW SECTION A -A 7\ --POINT D POINT A POINT 8 PO NT C _POINT C FLOW LINE PROFILE fLOW LINE CASE B --------------------------------- PLAN CORNER �_Q_NNECTION A� N mm / / Tl'2�_)_MlN\\ / �A r75 mm (3') R.\, P LAN SIDE CONNECTION STRUCTURAL DATA STANDARD PLAN METRIC 308-1 SHEET 2 OF 2 FACE PLATE ASSEMBLY TOP SLAB REINFORCEMENT (SEE CATCH BASIN STANDARD PLAN) CURB OPENING CATCH BASIN REINFORCEMENT E E CURB �OPENING — — — — — — uj E O� 5.0 " uj (2') CL� > t G BARS G BARS­z�,- 50 (20) 0L. TTER GRAD T- ...................... ----------- E� E LA ------------------------- G BARS 0 POINT G _j U- —DIRECTION OF FLOW -LAN < —DIRECTION OF FLOW TYPICAL REINFORCEMENT DETAILS ::�POINT B13 POINT C POINT D \\--POINT A FLOW LINE PROFILE FLOW LINE CAS E A V, UJ < N L w D N CURB OPENING — — — — — — 7� E Lu cc E < CATCH BASIN (S) — — — — — — 0 uj ............. CURB POINI A—POINT D POINT B POINT C & U�T ER POINT 6 uj 0 < < U- POINT F POINT G DIRECTION OF FLOW PLAN -—DIRECTION OF FLOW 0 N w D N z 7\ --POINT D POINT A POINT 8 PO NT C _POINT C FLOW LINE PROFILE fLOW LINE CASE B --------------------------------- 50 mm —_VAR� F_cURB 7— RIDGE FACE+ VALLEY - H E — VALLEY F Ln Ll SECTION A -A SECTION B -B SECTION C -C AMERICAN PUBLIC WORKS ASSOCIATION SOUTHERN CALIFORNIA CHAPTER PROMULGATED BY THIE FOR 6 GREATER THAN 1800 mm (721 SEE PROJECT PLAN AT CATCH BASINS STANDARD PLAN METRIC 308-1 SHEET 2 OF 2 FACE PLATE ASSEMBLY TOP SLAB REINFORCEMENT (SEE CATCH BASIN STANDARD PLAN) CURB OPENING CATCH BASIN REINFORCEMENT 0 mm (*4 0 60) FOR V>3.5 m (12') SEE PROJECT PLANS GRATING CA-rCH BASIN REINFORCEMENT NOTES L UNLESS OTHERWISE SPECIFIED, REINFORCEMENT FOR CURB OPENING AND GRATING CATCHS BASIN SHALL TERMINATE 50 rrim (2*) FROM FACE OF CONCRETE. 2� DIMENSIONS SHOWN ON THIS PLAN FOR METRIC, AND ENGLISH UNITS ARE NOT EXACT EOUAL VALUES. IF METRIC VALUES ARE USED. ALL VALUES USED FOR CONSTRUCTION SHALL BE METRIC VALUES. EXCEPT REINFORCING BARS SfZES IN ENGLISH UNITS MAY BE SUBSTITUTED FOR METRIC BAR SIZES, IF ENGLISH UNITS ARE USED. ALL VALUES USED FOR CONSTRUCTION SHALL BE ENGLISH UNITS. AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER STANDARD PLAN METRIC CATCH BASIN REINFORCEMENT 309-1 SHEET 2 OF 2 REV. I REVISION DESCRIPTION uj U, E E CURB �OPENING — — — — — — uj E O� 5.0 " uj (2') CL� > t G BARS G BARS­z�,- 50 (20) 0L. TTER GRAD T- POINT E� E LA E G BARS 0 POINT G _j U- —DIRECTION OF FLOW -LAN < —DIRECTION OF FLOW TYPICAL REINFORCEMENT DETAILS 0 mm (*4 0 60) FOR V>3.5 m (12') SEE PROJECT PLANS GRATING CA-rCH BASIN REINFORCEMENT NOTES L UNLESS OTHERWISE SPECIFIED, REINFORCEMENT FOR CURB OPENING AND GRATING CATCHS BASIN SHALL TERMINATE 50 rrim (2*) FROM FACE OF CONCRETE. 2� DIMENSIONS SHOWN ON THIS PLAN FOR METRIC, AND ENGLISH UNITS ARE NOT EXACT EOUAL VALUES. IF METRIC VALUES ARE USED. ALL VALUES USED FOR CONSTRUCTION SHALL BE METRIC VALUES. EXCEPT REINFORCING BARS SfZES IN ENGLISH UNITS MAY BE SUBSTITUTED FOR METRIC BAR SIZES, IF ENGLISH UNITS ARE USED. ALL VALUES USED FOR CONSTRUCTION SHALL BE ENGLISH UNITS. AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER STANDARD PLAN METRIC CATCH BASIN REINFORCEMENT 309-1 SHEET 2 OF 2 REV. I REVISION DESCRIPTION uj U, K --f-,--- WD L N �A CURB �OPENING — — — — — — uj E O� CATCH' BASIN (S) F - - - - - - - " uj B =_I=NTA CURB PO CURB POINT A---�� POINT B POINT C \—POINT D & TTER GRAD P POINT E� E LA Lu POIN < POINT G _j U- —DIRECTION OF FLOW -LAN < —DIRECTION OF FLOW 0 N -------- --W ---------- L N 1 0 D ::�POINT B13 POINT C POINT D \\--POINT A FLOW LINE PROFILE FLOW LINE CAS E A V, UJ < N L w D N CURB OPENING — — — — — — 7� E Lu cc E < CATCH BASIN (S) — — — — — — 0 uj CURB POINI A—POINT D POINT B POINT C & U�T ER POINT 6 uj 0 < < U- POINT F POINT G DIRECTION OF FLOW PLAN -—DIRECTION OF FLOW 0 N w D N z 7\ --POINT D POINT A POINT 8 PO NT C _POINT C FLOW LINE PROFILE fLOW LINE CASE B 25M (I") 150nim(6") 25 mm w) 150 MM (6") 25 mm Q") IAII m M, G, 0 R VAR�--A__ 450 mm VAR.— 50 mm —_VAR� F_cURB 7— RIDGE FACE+ VALLEY - H E — VALLEY F Ln Ll SECTION A -A SECTION B -B SECTION C -C AMERICAN PUBLIC WORKS ASSOCIATION SOUTHERN CALIFORNIA CHAPTER PROMULGATED BY THIE LOCAL DEPRESSIONS STANDARD PLAN PUBLIC WORKS STANDARDS INC., GREENBOOK COMMITTEE lq64 AT CATCH BASINS METRIC 313-1 REV. 1996 SHEET I OF 4 USE WITH STANDARD SPECIFICATIONS FOR P' RKS CONSTRGCTION NOTE: I � ALL EXPOSED EDGES SHALL BE ROUNDED TO A 15 mm (HALF INCH) RADIUS. 2. THE CURB FACE AT POINTS A AND D SHALL BE THE NORMAL CURB FACE OF THE ADJACENT CURB, THE CURB FACE AT POINTS B AND C SHALL BE THE NORMAL CURB FACE OF THE ADJACENT CURB PLUS H (SEE APPLICABLE CATCH BASIN STANDARD PLAN). 3, IN EXISTING STREETS WHERE NO PAVEMENT REMODELING IS INDICATED, THE ELEVATION OF THE OUTER EDGE OF THE LOCAL DEPRESSION SHALL MEET THE FINISHED STREET SURFACE. 4. IN NEW STREETS, OR IN EXISTING STREETS WHERE PAVEMENT REMODELING IS INDICATED: ELEVATIONS OF POINTS F AND G SHALL BE SET HI HIGHER THAN THE GUTTER FLOW LINE ELEVATIONS AT POINTS A AND D, RESPECTIVELY. THE ELEVATIONS OF POINTS P AND R SHALL BE SET H2 HIGHER THAN THE GUTTER FLOW LINE ELEVATIONS AT POINTS B AND C, RESPECTIVELY, THE ELEVATION OF POINT S SHALL BE SET H2 HIGHER THAN THE ELEVATION AT THE NEAREST GUTTER FLOW LINE. WHERE THERE IS NO GUTTER ADJACENT TO THE LOCAL DEPRESSION, THE ELEVATION OF POINT E SHALL BE SET H3 HIGHER THAN THE ELEVATION AT THE NEAREST TOE OF CURB. 5, DIMENSIONS: H = NOTED ON THE PROJECT PLANS, HI = NOTED ON THE PROJECT PLANS. H2 = NOTED ON THE PROJECT PLANS. H3 = NOTED ON THE PROJECT PLANS, G = 600 mm (2 Feet) K = 1.5 m (5 Feet) L = 1.8 m (6 Feet) M = 1.2 m (4 Feet) N = 1.5 m (5 Feet) IND = CATCH BASIN 'A/ FOR ONE CATCH BASIN OR DISTANCE BETWEEN EXTREME END WALLS FOR MUTIPLE CATCH BASINS. THE THICKNESS OF THE LOCAL DEPRESSION SHALL BE 200 mm (8 INCHES). 6. DIMENSIONS SHOWN ON THIS PLAN FOR METRIC AND ENGLISH UNITS ARE NOT EXACTLY EQUAL VALUES, IF METRIC UNITS ARE USED, ALL VALUES USED FOR CONSTRUCTION SHALL BE METRIC VALUES, EXCEPT REINFORCING BAR SIZES IN ENGLISH UNITS MAYBE SUBSTITUTED FOR METRIC BAR SIZES. IF ENGUSH UNITS ARE USED, ALL VALUES USED FOR CONSTRUCTION SHALL BE ENGLISH VALUES. `15311`11�1 I'll, I STANDARD PLI LOCAL DEPRESSIONS AT C CH BASINS 313-1 SHEET 4 OF 4 SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND STANDARDS IN EFFECT. D + E SYMMETRICAL ABOUT -19 mm 3/4") DIA TO P END - TYPE 1, 2 OR 3 A W 83 mm A SIDE '�FrTnNl A -A 38 Trim (1 - 1 /2") 38 mm N (1 - '1 /2 MIN DIA _1��l MIN BE TYPE 1 TYPE 2 51 mm'� (2") TYPE 3 END DETAILS -&DE VIEW 25 rr 0 ") T — 17 S/2 S INSTALLATION DETAIL UNLESS OTHERWISE NOTED: D = 175 mm (7") E = 150 mm (6") OR T - 25 mm (1"), WHICHEVER IS LESS MINIMUM E IS 75 m m (3 ") S 300 mm (12") MAX, EVENLY SPACED W 400 mm (16") MIN FOR MANHOLES AND UNDERGROUND VAULTS: S 400 mm (16") MAX, EVENLY SPACED W 350 mm (14") MIN AMERIGAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER PRO.MULGATED BY THE STANDARD PLAN PUBLIC WORKS STANDARDS INC., METRIC GREENBOOK COMMITTEE STEEL STEP 19B4 635-2 REV. 1992,1996 _d6E__MfP —STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION SHEET I OF 2 NO . S: 1 . STEPS SHALL BE STEEL CONFORMING TO ASTM A307 AND SHALL BE GALVANIZED AFTER FABRICATION. UNLESS OTHERWISE NOTED, STEPS MAY ALSO BE POLYPROPYLENE STEPS, STEEL REINFORCED, CONFORMING TO STD PLAN 636. 2� IF STAINLESS STEEL STEPS ARE REQUIRED, THE MATERIAL SHALL CONFORM TO ASTM A276, 300 SERIES. 3. STEP ENDS MAY BE TYPE 1, 2 OR 3, AS SHOWN, 4. BOTTOM STEP SHALI BE A MAXIMUM OF 600 mm (2') ABOVE FLOOR OR SHELF. 5. STEPS VVITH TYPE 1 OR 2 ENDS MAY BE CAST IN PLACE, OR PLACED IN THE CENTER OF 40 mm (1-1/2") MIN DIA DRILLED OR FORMED HOLES AND SET NTH HIGH STRENGTH NON -SHRINK GROUT, 4-0 MPc (6000 PSI) MIN. STEPS WITH TYPE 3 ENDS SHALL BE CAST IN PLACE, 6, DIMENSIONS SHOWN ON THIS PLAN FOR METRIC AND ENGLISH UNITS ARE NOT EXACTLY EQUAL VALUES. IF METRIC UNITS ARE USED, ALL VALUES USED FOR CONSTRUCTION SHALL BE METRIC VALUES. IF ENGLISH UNITS ARE USED, ALL VALUES USED FOR CONSTRUCTION SHALL BE ENGLISH VALUES. AMERICAN PUBLIC WORKS ASSOCIATION - SOUT14ERN CALIFORNIA CHAPTER STANDARD PLAN METRIC STEEL STEP 635-2 SHEET 2 OF 2 Prepared Under The Supervision Of: o� ESS o4, HENRY C. POOUIZ p HP ENGINEERING, INIC. 114-65 CRESTVIEW ROAD DRAWN BY: f Lo REDLANDS--, CA. 92374 U 1 No. 37037 1 m CADD (909) 799 97, FAX (909) 799-1508 Ex p 6-30-08 DESIGNED BY: HCP CHECKED BY: A DATE I_HE_NRY_ C. POQUIZ, RAY37037 H C P CITY OF F0fIII,,JTANA, CALIFORNIA