A. THE, GENERAL CONTRACTOR SHALL PROVIDE:
1. ADEQUATE ACCESS TO THE -JOB SITE.
2. "INFORMATION ON CONSTRUCTION SCHEDULING TO FACILITATE PROGRESSIVE INSTALLATION.
3. ELECTRICAL POWER TO THE PLYMOVENT CONTROL PANEL (208/3)- -
4. ELECTRICAL POWER/CONTROL WRING FROM THE PLYMOVENT CONTROL PANEL TO THE EXHAUST -FAN.
5. A COMPRESSED AIR SOURCE WITH A MINIMUM OF 85 PSI FOR SYSTEM OPERATION.
6. (4) FOUR OPEN ENDED 1/2"' AIR LINES FROM THE STATION AIR SOURCE TO A POS17ION ABOVE THE
ENDS OF EACH RAJL
7. MOUNTING PROVISIONS FOR THE CONTROL PANEL
S. NECESSARY STRUCTURE AND BACKING TO SUPPORT PLYMOVENT RAILS AND SUPPORT SYSTEM USING
A MAXIMUM LEG SPACING OF 10 FEET. (COORDINATE WITH ARCHITECT.)
9. THE CODE REQUIRED FUSE DISCONNECT AT THE FAN.
10. LOW VOLTAGE CONDUIT FROM THE CONTROL PANEL OR PANELS TO A POINT ABOVE THE CENTER OF
EACH TRACK OR RAIL.
11. ALL NECESSARY LINE AND LOW VOLTAGE WRING AND CONDUIT TO CONTROL PANEL AND FROM THE
CONTROL PANEL TO THE EXHAUST FAN.
12. EQUIPMENT PAD FOR MOUNTING THE EXHAUST FAN.
13. FLASHING FOR ROOF/WALL PENETRATIONS.
14. TREATING/FINISHING OF ALL FLASHING AND EQUIPMENT ASSOCIATED WITH EXHAUST REMOVAL
SYSTEM.
B. THE EXHAUST REMOVAL SYSTEM SUB -CONTRACTOR SHALL PROMDE:
1. SLIDING BALANCER TRACK SYSTEMS OR STRAIGHT RAIL SYSTEMS. AS REQUIRED.
2. RADIAL HIGH STATIC EXHAUST FAN, SIZED FOR ADEQUATE AIR FLOW FOR THE NUMBER OF DROPS,
AT THE VOLTAGE AND PHASE FOR THE PARTICULAR STATION. AS REQUIRED.
3. CONTROL PANELS WHICH HOUSE THE MOTOR STARTER, OVERLOAD RELAYS, TIMER, STEP-DOWN
TRANSFORMER. AS REQUIRED.
4. SENSORS TO ACTIVATE THE EXHAUST FAN UPON VEHICLE START-UP. AS REQUIRED.
5. COMPLETE 4 SUPPORT STRUCTURE FOR TRACKS OR RAILS.
6. ALL SYSTEM DUCTWORK (MIN. 22 GAGE GALVANIZED STEEL ALL SIZES), HANGERS, AND GRABBERS.
7. ALL MISC. FITTINGS, AND AIR DRYER, REGULATOR, ETC. FOR COMPLETE SYSTEM OPERATION.
8. INSTALLATION OF SECONDARY AIRLINES FOR COMPLETE OPERATION OF GRABBERS.
9- COMPLETE THE CONNECTION OF LOW VOLTAGE WRING FROM POINT(S) ABOVE RAILS AS PROVIDED
BY THE GENERAL CONTRACTOR TO THE PROVIDED PRESSURE $ENSORS.
10. COMPLETE START-UP OF'THE SYSTEM.
11. ..TRAINING 6F THE FIRE FIGHTING CREWS.
,KEY NOTES:
(D VER11CAL FURNACE UNIT SEE DETAIL 1/M3.1. PROZDE
LINED SUPPLY AND RETURN DUCT UP TO CEILING
SPACE. ROUTE EXHAUST AND COMBUSTION AIR VENTS
UP SEE DETAIL 4/M3.1.
CORRESPONDING COOUNG COIL IN LINE WITH FURNACE
OUTLET SEE MECHANICAL SCHEDULES.
IN -UNE EXHAUST FAN. PROVIDE FLEXIBLE CONNECTION
ON INLET AND OUTLET.
MECHANICAL EQUIPMENT MINIMUM MANUFACTURER"S
MAINTENANCE AND CLEARANCE REQUIREMENTS. KEEP
CLEAR OF OBSTRUCTIONS.
CONDENSING UNIT SEE DETAIL 2/M3.1 FOR MOUNTING.
ROUTE REFRIGERANT LINES TO CORRESPONDING
FURNACE COOLING COIIL SEE DETAILS 11/M3.1 AND
12/M3.1.
LOUVERED DOOR. SEE ARCHITECTURAL PLANS.
CEILING EXHAUST FAN. PROVIDE FLEXIBLE CONNECTION
ON OUTLET.
ROUTE EA DUCT OUT TO WALL CAP.
PROVIDE 26x16 DOOR LOUVER. SEE ARCHITECTURAL
PLANS.
DRYER EXHAUST VENT KIT. ROUTE 4"0 VENT FROM
DRYER OUT THROUGH EXTERIOR WALL. COORDINATE
EXACT VENT SIZE WITH MANUFACTURER.
D11 PROGRAMMABLE THERMOSTAT / WALL STAT.
COORDINATE EXACT LOCATION WITH ARCHITECT AND
OWNER PRIOR TO START OF WORK. SEE DETAIL
10/M3.1.
@12
DUCT TAKE -OFF, SEE DETAIL 3/M3.1.
@ 10"0 EA DUCT UP TO ROOF CAP SEE DETAIL 6/M3.1.
14
12 os 0 EA DUCT UP TO ROOF CAP SEE DETAIL 6/M3.1.
14"0 EA DUCT UP TO ROOF CAP SEE DETAIL 6/M,3.1.
12"0 OA DUCT UP THROUGH ROOF CAP. SEE DETAIL
6/M3.1. MAINTAIN 10' CLEAR OF EXHAUST VENT.
7 is 0 SHEET METAL EXHAUST DUCT FROM KITCHEN
HOOD UP THROUGH ROOF TO ROOF CAP. FOR DETAILS
SEE ARCH. DWGS.
DUCT SMOKE DETECTOR PROVIDED BY MECHANICAL
AND WIRED BY ELECTRICAL. PROVIDE ACCESS PANEL
IF INSTALLED ABOVE HARD LID CEILING.
PROVIDE 30x24 DRYWALL ACCESS PANEL. SEE
ARCHITECTURAL PLANS.
PROVIDE SIDEWALL EXHAUST FAN WHERE SHOWN.
FINISH WALL PENETRATION. PROVIDE WITH. 1/4 -
STAINLESS STEEL WIRE MESH AT INLET.
10"0 VEHICLE EXHAUST DUCT UP THRU ROOF TO ROOF
CAP. TERMINATE AT V ABOVE FINISHED ROOF.
MAINTAIN DUCT MINIMUM 3' AWAY FROM EXTERIOR
WALLS.
FLEXIBLE EXHAUST HOSE WITH FITTINGS AND
CONNECTIONS AS PER SPECIFICATIONS AND
MANUFACTURER'S RECOMMENDATIONS.
6 to 0 EXHAUST DUCT. FOR DETAILS SEE 2/M3.2 AND
SEE SPECIFICATIONS FOR MATERIAL.
MOUNTING OF STRAIGHT RAILS SHALL BE FIELD
VERIFIED BY THE MANUFACTURER'S REPRESENTATIVE.
SEE ARCH. DWGS. FOR RAIL SUPPORT.
SENSOR LOCATION FOR AUTO START. LOCATION
SHALL BE WITHIN 5 FEET OF FRONT AND BACK OF
RAIL. FOR ADDITIONAL DETAILS SEE SPECIFICATIONS
AND MANUFACTURER'$ INSTALLAT10N GUIDE.
GENERAL NOTES. -
(9) EA DUCT SHALL BE 22 GAUGE GALVINIZED STEEL FOR 1. MECHANICAL CONTRACTOR SHALL PROVIDE PLYMOVENT
SUPPORT DETAIL SEE 1/M3.2. INSTALL VEHICLE VEHICLE EXHAUST SYSTEM WITH ALL COMPONENTS AND
EXHAUST DUCT ABOVE CEILING. ACCESSORIES REQUIRED BY THE MANUFACTURER TO
INSURE PROPER AND EFFECTIVE OPERATION OF THE
PROVIDE EXHAUST REMOVAL SYSTEM CONTROL PANEL. SYSTEM.
VERIFY EXACT LOCAT10N WITH OWNER PRIOR TO START
OF WORK. MOUNT AS PER MANUFACTURER'S 2. ELECTRICAL AND MECHANICAL CONTRACTORS SHALL
RECOMMENDATIONS. COORDINATE ALL PLYMOVENT VEHICLE EXHAUST SYSTEM
COMPONENT LOCATIONS AND ELECTRICAL DATA. IN CASE
EXHAUST REMOVAL SYSTEM FAN. FOR INSTALLATION OF ANY DISCREPANCIES OR POTENTIAL CONFLICTS INFORM
SEE DETAIL 3/M3.2. THE ARCHITECT IN WRITING PRIOR TO START OF WORK.
CONTRACTOR SHALL PROVIDE STRUCTURAL CROSS 3. NO CLASS 1, 11, AND/OR III FLAMMABLE OR COMBUSTIBLE
MEMBERS AS REQUIRED BY THE MANUFACTURER FOR LIQUIDS ARE TO BE USED IN ANY AMOUNT WITHIN THE
SUPPORT OF EXHAUST REMOVAL SYSTEM. BUILDING.
@) ROUTE LOW VOLTAGE CONTROL WIRING TO SENSOR 4. COORDINATE EXACT PLACEMENT OF FLEXIBLE HOSE AND
CONNECTION LOCATION ON EACH RAIL. CONCEALED LOCATION OF VEHICLE TAILPIPES WITH FIRE DEPARTMENT
CONTROL WIRING AND INSTALL AS PER PRIOR TO START OF WORK.
MANUFACTURER'S REQUIREMENTS.
STAND ALONE CARBON MONOXIDE DETECTOR VULCAIN
MODEL VA201M-02 WITH 24VAC TRANSFORMER. INCLUDE
AUDIBLE ALARM. COORDINATE EXACT LOCATION AND
MOUNTING HEIGHT WITH MANUFACTURER, ARCHITECT AND
FIRE DEPARTMENT PRIOR TO START OF WORK.
@32 ROUTE REFRIGERANT LINES TO CORRESPONDING
FURNACE/COOLING COIL. SEE DETAIL 11/M3.1.
,,"I
z
A 1''i .... i I Oil 2
1, Aj I R@ K
CONSULTANT:
T -SQ UARED
PROFESSIONAL ENGINEERS. INC.
"1340 SPECIALTY DRIVE
SUITE E
VISTA, CA 92081
TEL: (760) 560-0100
FAX: (760) 560-0101
E -Mail admin@tsqeng.com
www.tsqeng.com
#04091
06-07-06
ISSUE INFORMATION:
DATE: I IN FORMATION:
v %ftw. a
g\MAY 2006 �EMSION a
PLAN (;HECK
A4mAy 18,2oo6 I RF\A-qION
SHEET INFORMATION:
PROJECT NO.: 4111P
SCALE: AS N OTED-
DATE: DECEMBER Z 2005
PLOT DATE:
DRAWNG NAME:
SEAL:
SCALE:
11411-1 1 _0"
DRAIVING - NUMBER
4077 51 of 66