Loading...
HomeMy WebLinkAbout4077-574W VLHIULt. LAHAUZ�d. Nt.MUVAL Z)TZ)ILM NU A. THE, GENERAL CONTRACTOR SHALL PROVIDE: 1. ADEQUATE ACCESS TO THE -JOB SITE. 2. "INFORMATION ON CONSTRUCTION SCHEDULING TO FACILITATE PROGRESSIVE INSTALLATION. 3. ELECTRICAL POWER TO THE PLYMOVENT CONTROL PANEL (208/3)- - 4. ELECTRICAL POWER/CONTROL WRING FROM THE PLYMOVENT CONTROL PANEL TO THE EXHAUST -FAN. 5. A COMPRESSED AIR SOURCE WITH A MINIMUM OF 85 PSI FOR SYSTEM OPERATION. 6. (4) FOUR OPEN ENDED 1/2"' AIR LINES FROM THE STATION AIR SOURCE TO A POS17ION ABOVE THE ENDS OF EACH RAJL 7. MOUNTING PROVISIONS FOR THE CONTROL PANEL S. NECESSARY STRUCTURE AND BACKING TO SUPPORT PLYMOVENT RAILS AND SUPPORT SYSTEM USING A MAXIMUM LEG SPACING OF 10 FEET. (COORDINATE WITH ARCHITECT.) 9. THE CODE REQUIRED FUSE DISCONNECT AT THE FAN. 10. LOW VOLTAGE CONDUIT FROM THE CONTROL PANEL OR PANELS TO A POINT ABOVE THE CENTER OF EACH TRACK OR RAIL. 11. ALL NECESSARY LINE AND LOW VOLTAGE WRING AND CONDUIT TO CONTROL PANEL AND FROM THE CONTROL PANEL TO THE EXHAUST FAN. 12. EQUIPMENT PAD FOR MOUNTING THE EXHAUST FAN. 13. FLASHING FOR ROOF/WALL PENETRATIONS. 14. TREATING/FINISHING OF ALL FLASHING AND EQUIPMENT ASSOCIATED WITH EXHAUST REMOVAL SYSTEM. B. THE EXHAUST REMOVAL SYSTEM SUB -CONTRACTOR SHALL PROMDE: 1. SLIDING BALANCER TRACK SYSTEMS OR STRAIGHT RAIL SYSTEMS. AS REQUIRED. 2. RADIAL HIGH STATIC EXHAUST FAN, SIZED FOR ADEQUATE AIR FLOW FOR THE NUMBER OF DROPS, AT THE VOLTAGE AND PHASE FOR THE PARTICULAR STATION. AS REQUIRED. 3. CONTROL PANELS WHICH HOUSE THE MOTOR STARTER, OVERLOAD RELAYS, TIMER, STEP-DOWN TRANSFORMER. AS REQUIRED. 4. SENSORS TO ACTIVATE THE EXHAUST FAN UPON VEHICLE START-UP. AS REQUIRED. 5. COMPLETE 4 SUPPORT STRUCTURE FOR TRACKS OR RAILS. 6. ALL SYSTEM DUCTWORK (MIN. 22 GAGE GALVANIZED STEEL ALL SIZES), HANGERS, AND GRABBERS. 7. ALL MISC. FITTINGS, AND AIR DRYER, REGULATOR, ETC. FOR COMPLETE SYSTEM OPERATION. 8. INSTALLATION OF SECONDARY AIRLINES FOR COMPLETE OPERATION OF GRABBERS. 9- COMPLETE THE CONNECTION OF LOW VOLTAGE WRING FROM POINT(S) ABOVE RAILS AS PROVIDED BY THE GENERAL CONTRACTOR TO THE PROVIDED PRESSURE $ENSORS. 10. COMPLETE START-UP OF'THE SYSTEM. 11. ..TRAINING 6F THE FIRE FIGHTING CREWS. ,KEY NOTES: (D VER11CAL FURNACE UNIT SEE DETAIL 1/M3.1. PROZDE LINED SUPPLY AND RETURN DUCT UP TO CEILING SPACE. ROUTE EXHAUST AND COMBUSTION AIR VENTS UP SEE DETAIL 4/M3.1. CORRESPONDING COOUNG COIL IN LINE WITH FURNACE OUTLET SEE MECHANICAL SCHEDULES. IN -UNE EXHAUST FAN. PROVIDE FLEXIBLE CONNECTION ON INLET AND OUTLET. MECHANICAL EQUIPMENT MINIMUM MANUFACTURER"S MAINTENANCE AND CLEARANCE REQUIREMENTS. KEEP CLEAR OF OBSTRUCTIONS. CONDENSING UNIT SEE DETAIL 2/M3.1 FOR MOUNTING. ROUTE REFRIGERANT LINES TO CORRESPONDING FURNACE COOLING COIIL SEE DETAILS 11/M3.1 AND 12/M3.1. LOUVERED DOOR. SEE ARCHITECTURAL PLANS. CEILING EXHAUST FAN. PROVIDE FLEXIBLE CONNECTION ON OUTLET. ROUTE EA DUCT OUT TO WALL CAP. PROVIDE 26x16 DOOR LOUVER. SEE ARCHITECTURAL PLANS. DRYER EXHAUST VENT KIT. ROUTE 4"0 VENT FROM DRYER OUT THROUGH EXTERIOR WALL. COORDINATE EXACT VENT SIZE WITH MANUFACTURER. D11 PROGRAMMABLE THERMOSTAT / WALL STAT. COORDINATE EXACT LOCATION WITH ARCHITECT AND OWNER PRIOR TO START OF WORK. SEE DETAIL 10/M3.1. @12 DUCT TAKE -OFF, SEE DETAIL 3/M3.1. @ 10"0 EA DUCT UP TO ROOF CAP SEE DETAIL 6/M3.1. 14 12 os 0 EA DUCT UP TO ROOF CAP SEE DETAIL 6/M3.1. 14"0 EA DUCT UP TO ROOF CAP SEE DETAIL 6/M,3.1. 12"0 OA DUCT UP THROUGH ROOF CAP. SEE DETAIL 6/M3.1. MAINTAIN 10' CLEAR OF EXHAUST VENT. 7 is 0 SHEET METAL EXHAUST DUCT FROM KITCHEN HOOD UP THROUGH ROOF TO ROOF CAP. FOR DETAILS SEE ARCH. DWGS. DUCT SMOKE DETECTOR PROVIDED BY MECHANICAL AND WIRED BY ELECTRICAL. PROVIDE ACCESS PANEL IF INSTALLED ABOVE HARD LID CEILING. PROVIDE 30x24 DRYWALL ACCESS PANEL. SEE ARCHITECTURAL PLANS. PROVIDE SIDEWALL EXHAUST FAN WHERE SHOWN. FINISH WALL PENETRATION. PROVIDE WITH. 1/4 - STAINLESS STEEL WIRE MESH AT INLET. 10"0 VEHICLE EXHAUST DUCT UP THRU ROOF TO ROOF CAP. TERMINATE AT V ABOVE FINISHED ROOF. MAINTAIN DUCT MINIMUM 3' AWAY FROM EXTERIOR WALLS. FLEXIBLE EXHAUST HOSE WITH FITTINGS AND CONNECTIONS AS PER SPECIFICATIONS AND MANUFACTURER'S RECOMMENDATIONS. 6 to 0 EXHAUST DUCT. FOR DETAILS SEE 2/M3.2 AND SEE SPECIFICATIONS FOR MATERIAL. MOUNTING OF STRAIGHT RAILS SHALL BE FIELD VERIFIED BY THE MANUFACTURER'S REPRESENTATIVE. SEE ARCH. DWGS. FOR RAIL SUPPORT. SENSOR LOCATION FOR AUTO START. LOCATION SHALL BE WITHIN 5 FEET OF FRONT AND BACK OF RAIL. FOR ADDITIONAL DETAILS SEE SPECIFICATIONS AND MANUFACTURER'$ INSTALLAT10N GUIDE. GENERAL NOTES. - (9) EA DUCT SHALL BE 22 GAUGE GALVINIZED STEEL FOR 1. MECHANICAL CONTRACTOR SHALL PROVIDE PLYMOVENT SUPPORT DETAIL SEE 1/M3.2. INSTALL VEHICLE VEHICLE EXHAUST SYSTEM WITH ALL COMPONENTS AND EXHAUST DUCT ABOVE CEILING. ACCESSORIES REQUIRED BY THE MANUFACTURER TO INSURE PROPER AND EFFECTIVE OPERATION OF THE PROVIDE EXHAUST REMOVAL SYSTEM CONTROL PANEL. SYSTEM. VERIFY EXACT LOCAT10N WITH OWNER PRIOR TO START OF WORK. MOUNT AS PER MANUFACTURER'S 2. ELECTRICAL AND MECHANICAL CONTRACTORS SHALL RECOMMENDATIONS. COORDINATE ALL PLYMOVENT VEHICLE EXHAUST SYSTEM COMPONENT LOCATIONS AND ELECTRICAL DATA. IN CASE EXHAUST REMOVAL SYSTEM FAN. FOR INSTALLATION OF ANY DISCREPANCIES OR POTENTIAL CONFLICTS INFORM SEE DETAIL 3/M3.2. THE ARCHITECT IN WRITING PRIOR TO START OF WORK. CONTRACTOR SHALL PROVIDE STRUCTURAL CROSS 3. NO CLASS 1, 11, AND/OR III FLAMMABLE OR COMBUSTIBLE MEMBERS AS REQUIRED BY THE MANUFACTURER FOR LIQUIDS ARE TO BE USED IN ANY AMOUNT WITHIN THE SUPPORT OF EXHAUST REMOVAL SYSTEM. BUILDING. @) ROUTE LOW VOLTAGE CONTROL WIRING TO SENSOR 4. COORDINATE EXACT PLACEMENT OF FLEXIBLE HOSE AND CONNECTION LOCATION ON EACH RAIL. CONCEALED LOCATION OF VEHICLE TAILPIPES WITH FIRE DEPARTMENT CONTROL WIRING AND INSTALL AS PER PRIOR TO START OF WORK. MANUFACTURER'S REQUIREMENTS. STAND ALONE CARBON MONOXIDE DETECTOR VULCAIN MODEL VA201M-02 WITH 24VAC TRANSFORMER. INCLUDE AUDIBLE ALARM. COORDINATE EXACT LOCATION AND MOUNTING HEIGHT WITH MANUFACTURER, ARCHITECT AND FIRE DEPARTMENT PRIOR TO START OF WORK. @32 ROUTE REFRIGERANT LINES TO CORRESPONDING FURNACE/COOLING COIL. SEE DETAIL 11/M3.1. ,,"I z A 1''i .... i I Oil 2 1, Aj I R@ K CONSULTANT: T -SQ UARED PROFESSIONAL ENGINEERS. INC. "1340 SPECIALTY DRIVE SUITE E VISTA, CA 92081 TEL: (760) 560-0100 FAX: (760) 560-0101 E -Mail admin@tsqeng.com www.tsqeng.com #04091 06-07-06 ISSUE INFORMATION: DATE: I IN FORMATION: v %ftw. a g\MAY 2006 �EMSION a PLAN (;HECK A4mAy 18,2oo6 I RF\A-qION SHEET INFORMATION: PROJECT NO.: 4111P SCALE: AS N OTED- DATE: DECEMBER Z 2005 PLOT DATE: DRAWNG NAME: SEAL: SCALE: 11411-1 1 _0" DRAIVING - NUMBER 4077 51 of 66