Loading...
HomeMy WebLinkAbout4077-564 PROJECT NAME . Certificate of Compliance lists the building features and performance specifications needed to comply *Ith Title 24, Parts I and 6 af the DATE Fontana Fire Station CLIMATEZONE 10 2/28/2006 PROjECTADDRESS 5075 Duncan Cayon Rd. Tontana PHASE OF CONSTRUCTION 'NEW CONSTRUCTION Suilding.Permft* PRINCIPAL DESIGNER -ENVELOPE TELEPHONE. 'STK'Archit(�Cture 111C. (951)296-9110 Checkedbyftle 1 Enforcement tkgenc Use y DOCUMENTATION.AUTHOR T -Squared Professional Engineers, Inc. TELEPHO14E (760) 560-0100 INFORMATION . Certificate of Compliance lists the building features and performance specifications needed to comply *Ith Title 24, Parts I and 6 af the F�ENERAL o T_ A F OF: PLANS UILDING 0NDITIONED FLOOR AREA r 2,923sq.Ft. CLIMATEZONE 10 BUILDING TYPE NONRESIDENTIAL HIGH RISE RESIDENTIAL NOTEUMOTEL GUEST ROOM PHASE OF CONSTRUCTION 'NEW CONSTRUCTION ADDITION [3 ALTERATION EYJSTING + ADDITION T -fAT E T QF COMPLIANCE . Certificate of Compliance lists the building features and performance specifications needed to comply *Ith Title 24, Parts I and 6 af the ,�;Ijs California Code of Regulations.This certificate applies only to a SuIlding using the perfoybanco'compliance approach. The documentation preparer hereby certMes that the documentation Is accurate and q6*leto. DOCUMENTATION AUTHOR SIGNATURE 1A JDATE I (,, �7 --- Earmad Tadaym PE Allow d LP0 Proc. Area Tailored Loads (W143 "1 4 (W19f) FICU:g The Principal Designer hereby certifys that the proposed building de ,ig in this set of construction documents is e 1 '0 ig '7hesec Fmiii consistent with the other compliance forms and worksheets, with the!S c ions, and with any other calculations submitted S ca' ith thispermit application. The proposed building as designed meet th energy efficiency requirements contained in sections 110, 116 through 118, and 140, 142, 143 or 149 of Title 24, Part 6. ENV. LTG. MECH. F S of 1. 1 hereby affirm that lam eligible under the prov ns of Division 3 of the Business and Professions Code to sign this document as the person responsible f r Its preparration; and that I am licensed in the State of California as a civil engineer, mechanical engineer, or I am a licensed architect. 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. El M 0 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because It pertains to a structure or type of work described as exempt pusuent to Business and Professions Code Sections 5537, 5538, and 6737. 1. (These sections of the Business and Professions Code are printed in full In the Nonresidential Manual.) ENVELOPE COMPLIANCE Indicate location on plans of Note Block for Mandatory Measun:,,s Required Forms ENV -1 RINCIPAL ENVELOPE DESIGNER - NAME RE LIC. NO. DAM STKAr-chitecture- Inc. SINGLE LINE LINED DUCTWORK TV Room PollcefFire Steffion _ffM_C_QMPLIANre9� Indicate location on plans of Note Block for Mandatory Measur( kighting Compliance Not in The Sc6pe Of Required Forms,-' PRINCIPAL LIGHTING DESIGNER - NAME ISIGNATURE Sup22rt LIC. NO. DATE MECHANICAL COMPLIANCE Indicate location on plans of Note Block for Mandatory Measums Required Forms;.M9f+1. MECH-2, MECH-3 PRINCIPAL MECHANICAL DESIGNER - NAME SIGNATURE LIC. NO. DATE . - farzad Ta PE I . // 1AA 1> [ 417 /,=';a f PROJECT NAME Fontana Fire Station DATE 2/28/2006 Conditioned Floor Area Unconditioned Floor Area Conditioned Footprint Area FuelType FZON�EIN�FORMATION System Name Zone Name OccupanSy I Floor Inst Area LPD (sqft mlsf)ll ctri. Credits al Allow d LP0 Proc. Area Tailored Loads (W143 "1 4 (W19f) FICU:g office Office 263 0.00 Rear Elevation North 624 soft Apparatus Bay Comp Bldg AD Other z4P4 0.00 504 sqft. 9 scift. 1,% Z789s� sqfLE: 16.30/0 82 sqft. IV.%,70 162 scift 9.8% 1 - 01so. E�� Kitchen Kitchen, Food Preparation 195 0.00 W INTERNALLY LINED DUCTWORK Dining Dining 210 0.00 (L) SINGLE LINE LINED DUCTWORK TV Room PollcefFire Steffion 345 0. SQUARE ELBOW WITH TURNING VANES Sup22rt Comdor/Restroom/Support 305 0. ROUND ELBOW FICU-1 Excerdse Rm. Exercise, qMnaslum 520 0.00 RETURN AIR SA Support Corrfdor/Restroom/SupDort 461 0.00 EXHAUST AIR OA OA Sleeping Quarters Pollce/Fire station 624. 0.00 FLEXIBLE DUCTWORK ROUND DUCT UP RECTANGULAR SUPPLY DUCT UP RECTANGULAR RETURN DUCT UP RECTANGULAR EXHAUST DUCT UP SD CEILING SUPPLY AIR DIFFUSER RR/RG RETURN AIR GRILLE ER OR EF EXHAUST REGISTER OR EXHAUST FAN @ ELECTRICAL HAND SWITCH HSTAT HUMIDISTAT TSTAT THERMOSTAT TC 11ME CLOCK AL. ALUMINUM AMB. AMBIENT' ARCH. ARCHITECT OR ARCHITECTURAL BTU(BTUH) BRITISH THERMAL UNIT- (PER HOUR) CAP. CAPACITY CFH CUBIC FEET PER HOUR CFM CUBIC FEET PER MINUTE CDR CONDENSER WATER RETURN CDS NDE SE WATER SUPPLY CONN. CONNECTION COP COEFFICIENT OF PERFORMANCE Notec 1. See LTG -2-C 2. See LTC,4-C 3. See LTG -5-C 4. See LTGA-C (items marked with asterisk, see LTC,.2 -C by oftrs) (by others) Items above require special J"X EPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency should pay special attention to the items specified in this che vilst. 1 -hose items require special written Jusmication �.& ins, and' speclial, vervo-flicattion to b6 used With the perlarmance approach. The locei enforcement agency determines the adequacy of "s 8%4 30 the Justification. and may reject a building or design that otherwise complies based on the adequacy of the special Justffication and documentation evoks"IffnA The HVAC System "CARRIER 38HDC060: Pmrnjum Eff" 0.82 BHP Supply Fan Motor has been spedifled. The Room "Kitchen: Premium Efr 0.25 SHP Exhaust Fan Motor has been specill The Room "Bath 1-1 A: Premium Eff" 0.09 8HP Exhaust Fan Motor has been specified, The HVAC Systern RFICU-1" inco[porates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-5-A. The HVAC SyAsem "FICU-1" includes credit for yerified adequate airflow. A ceffied HERS rater must diagnosbcally measure the airflow. The HVAC Sptem "F/CU-1" MRMorates a HERS verified-Refriger2nt Charge test or a HERS vedW Thermostaft Exppnsion Valve. The Room "Bath 2: Premium Eff" 0.17 BHP Exhaust Fan Motor has been spedified. The exceptional features listed In this performance approach application have specifically been reviewed. Adequate written justification ants documentation for their use have been provided by the applicant. Authorized Signature or Stamp I Bun , 113 11JES1011 B1102: - 22 241*10 Ru!1 Cod% 11411§00 1 EneravPm 4.0 bv EnemySoft User Number: 6511 Job Numben Page:3 of I I la =1 ;3; Us ij J, E, I I PROJECT NAME DATE Fontana Fire Station 2/28/2006 FKNUA TOV ENERGY. USE -S&!MMA JkBtU1SClft:VJ RY proposw CoMplil L afte ENr;R9Y_0MPQNEN1 Deal Design Margin Spgce Heating &�2 &67 -0.15 01 Space Cooling 94.14 85.12 .9.01 Indoor Fans 66.90 70.32 442 Heat Rejection 0.00 0.00 0.00 Pumps & Misc. 0.00 0.00 O.OD Domestic Hot Water 10A9 8.37 212 Lighting 61..41 6141 0.00 Receptacle 55A8 5 0.00 Process 0.00 0.00 0.01 TOTALS: 294.94 287.38 7.56 Percent better than Standard: 2.61% 2.61% excluding pmoess) Building Orientation Number of Stories Number of Systems Number of Zones Lscwh ji8oft Conditioned Floor Area Unconditioned Floor Area Conditioned Footprint Area FuelType Z923 ZW4 Z698 :at�ufw Gas EN sq% scift. scift. i 2 9 0 SO. 2.(r/o Left Elevation Standard Propgsed- - Lightilng Power Density 0.927 W/sqft. 0.000 WISCIft Prescriptive Env. Heat Loss 377 Bturn 400, Bluth Proscriptive Env. Heat GaIrl 34,480 Stu/h-F 40,277 Sturn-F I Remarks: F .1g.n Code; 11 D.1 mllLa It, Lwl. i m r, -0-2 2 W-01 3 1 as 2 4: 10 EnergyPro 4.0 by EnergySoft User Number. 5511 Job Number .___Paqe2of11 GENERAL NOTES. 1 ALL BRANCH DUCTS SHALL HAVE BALANCE DAMPERS WITH QUADRANT LOCKS. 2. ALL PUCT SIZES SHOWN ARE NET INSIDE DIMENSIONS. 3. DUCTWORK'SHALL BE GALVANIZED SHEET METAL IN COMPLETE CONFORMANCE WITH U.M.C.... AND SMACNA HVAC DUCT CONSTRUCTION STANDARDS. FLEXIBLE DUCTS MAY BE USED TO CONNECT INTO AIR OUTLETS AND INLETS. MAXIMUM *_00% LENGTH OF FLEXIBLE DUCTWORK SHALL BE 7 4. ALL FLEXIBLE DUCTS SHALL BE INSULATED. MINIMUM BEND RADIUS SHALL BE TWICE THE DUCT DIAMETER. MAXIMUM LENGTH SHALL BE NO MORE THAN -SEVEN PEET. 5.* SUPPLY AND RETURN CONNECTIONS TO UNIT SHALL BE LINED- SHEET METAL PLENUM. 6. DUCT AND PLENUM INSULATION SHALL BE IN ACCORDANCE WITH THE LATEST ED11ION OF THE CALIFORNIA MECHANICAL CODE (C.M.C.) 7. ALL SHEET METAL DUCTS SHALL BE INSULATED BY MEANS OF FOIL WRAP, 3/4 LB. DENSITY FIBERGLASS INSULATION. INSULATION SHALL BE UL LISTED. 8. THERMOSTATS SHALL BE LOCATED AT 4' - 0" ABOVE FINISHED FLOOR (46" MAX. IF MOUNTED OVER CASEWORK OR OTHER OBSTRUCTION) IN ACCORDANCE WITH A.D.A. REQUIREMENTS, UNLESS NOTED OTHERWISE. 90 CONDENSATE DRAIN PIPING SHALL BE COPPER TYPE OVS v AND SHALL BE ROUTED TO AN APPROVED RECEPTOR BY PLUMBING CONTRACTOR. 10. PROVIDE FLEXIBLE CONNECTIONS AT THE INLET AND OUTLET OF ALL FANS. 11. COORDINATE FINAL LOCATIONS OF AIR DISTRIBUTION DEVICES WITH THE ARCHITECTURAL REFLECTED CEILING PLANS, I.E. LIGHTS, SPEAKERS, TILES AND SPRINKLER HEADS. 12. ALL SUPPLY DIFFUSERS SHALL HAVE 4 -WAY AIR FLOW DISTRIBUTION PATTERNSs UNLESS INDICATED OTHERWISE. 13. COORDINATE FINAL LOCATIONS OF THERMOSTATS WITH ARCH. 14. ALL ROOF PENETRATIONS, CUTTING, PATCHINGo BLOCKOUTS, STRUCTURAL SUPPORT9 ROOF OPENINGS, LEVELING OF PRE -FAB CURBS SHALL BE BY GENERAL CONTRACTOR. CONTRACTOR SHALL VERIFY EXACT ROOF OPENING SIZES WITH UNIT MANUFACTURER PRIOR TO START OF WORK AND SHALL MAKE ALL NECESSARY ADJUSTMENTS AT NO EXTRA COST TO OWNER. 15. LOCATION OF ALL MECHANICAL EQUIPMENT SHOWN ARE SCHEMATIC. CONTRACTOR SHALL FIELD COORDINATE EXACT LOCATIONS, SIZES, AND WEIGHTS OF ALL MECHANICAL EQUIPMENT WITH OTHER TRADES INCLUDING BUT NOT LIMITED TO THE STRUCTURAL PORTION OF THE CONTRACT, PRIOR TO START OF WORK. 16. CONTRACTOR SHALL VERIFY WEIGHTS OF ALL MECHANIC * AL EQUIPMENT V41TH THEIR MANUFACTURER PRIOR TO START OF WORK. IF DIFFERENT THAN THE WEIGHTS INDICATED ON DRAWINGS, CONTRACTOR SHALL INFORM THE STRUCTURAL PORTION OF THE CONTRACT PRIOR TO START OF WORK. 17. CONTRACTOR SHALL VERIFY ALL ELECTRICAL LOADS W/MFR. AND COORDINATE WITH THE ELECTRICAL CONTRACTOR AND THE MANUFACTURER PRIOR TO START OF WORK. NOTIFY THE ARCHITECT, IN WRITING, IN CASE OF ANY DISCREPANCIES OR POTENTIAL CONFLICTS, PRIOR TO START OF WORK. 18. ALL HVAC EQUIPMENT, APPLIANCES,. AND DUCTWORK SHALL CONFORM TO THE LATEST GUIDELINES OF A.G.A., U.L. N.F.P.A., U.M.C., U.P.C., AND ALL OTHER LOCAL CODES HAVING JURISDICTION. 19. ALL SPACE CONDITIONING AND VENT)LATION SYSTEMS SHALL BE BALANCED TO THE QUANTITIES SPECIFIED IN THESE PLANS, IN ACCORDANCE WITH THE NATIONAL EN14RONMENTAL BALANCING BUREAU (NEBB) PROCEDURAL STANDARDS9 OR ASSOCIATED AIR BALANCE COUNCIL (AABC) NATIONAL STANDARDS. TEST AND BALANCING SHALL BE DONE BY AN INDEPENDENT AGENCY WITH QUALIFICATION FROM BOTH AGENCIES LISTED ABOVE. 20. CONTRACTOR SHALL FIELD VERIFY EXACT CEILING SPACE AVAILABLE FOR ROUTING OF DUCTWORK. PRIO START M ARCHI T, I WRITING, IN CASE OF ANY DISCREPANCY OR POTENTIAL CONFLICTS PRIOR TO FABRICATING AND/OR PURCHASE OF ANY DUCTWORK. 21. TEST AND BALANCE THE HVAC SYSTEM AS PER REQUIREMENTS OF THE MANDATORY HVAC MEASURES INDICATED ON THIS SHEET. TEST & BALANCE SHALL BE PERFORMED BY AN INDEPENDENT QUALIFIED AGENCY. MANDATORY HVAC SYSTEM MEASURES .4 1 - - W W I I � -I__ W 2. ALL WORK INDICATED ON DRAWINGS AND/OR SPECIFICATIONS SHALL BE COORDINATED WITH WORKS OF OTHER TRADES PRIOR TO START OF WORK. 3. ALL HVAC EQUIPMENT LISTED IN SECTION 100(G) OF THE EES MUST BE CEC CERTIFIED. 4. ALL DUCTWORK SHALL BE INSULATED CONSISTENT WITH THE REQUIREMENTS OF SECTION 118, 123, AND 124 E.E.S. AND TABLE 6D AND SECTION 604 OF CMC. 5. ALL HVAC EQUIPMENT AND APPLIANCE SHALL MEET THE REQUIREMENTS PER SEC11ONS 111-113* 115 AND 120-129 E.E.S. 6. ALL HVAC SYSTEMS SHALL MEET THE CONTROL REQUIREMENTS PER SECTION 112 AND 122 E.E.S. 7. ALL VENTILATION SYSTEMS SHALL BE CONSTRUCTED AND INSTALLED IN ACCORDANCE WTH USC (CALIFORNIA EDITION). 8. THE CONTRACTOR SHALL PROMDE THE BUILDING OWNER, MANAGER, AND THE ORIGINAL OCCUPANTS A LIST OF THE HEATING, VENTILATION, AND AIR CONDITIONING FEATURES, MATERIALS, AND COMPONENTS INSTALLED IN THE BUILDING AND INSTRUCTIONS ON HOW TO USE THEM. 9. INSULATION MATERIAL SHALL MEET THE CALIFORNIA QUALITY STANDARD PER SECTION 118 E.E.S. ' 10. ALL SPACE CONDITIONING AND VENTILATION SYSTEMS SHALL BE BALANCED TO THE QUANTITIES SPECIFIED IN THESE PLANS, IN ACCORDANCE WITH THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB) PROCEDURAL STANDARDS, OR ASSOCIATED AIR BALANCE COUNCIL (AABC) NATIONAL STANDARDS. TESTING AND BALANCING SHALL BE DONE BY AN INDEPENDENT QUALIFIED AGENCY. 11. ALL SYSTEMS SHALL PROVIDE THE MINIMUM OUTSIDE AIR AS SHOWN ON THE MECHANICAL DRAWINGS, AND SHALL BE MEASURED AND CERTIFIED BY THE INDEPENDENT QUALIFIED TESTING AGENCY. LEGEND Orilngtion Gross Area Glazing Area Glazing Ratio Front Elevation 0 scft 0 SO. 2.(r/o Left Elevation merstj 631 scift. 64 sqft. 12.1% Rear Elevation North 624 soft 16 SO. Z60/0 Right Elevation Total Roof �Eastl 504 sqft. 9 scift. 1,% Z789s� sqfLE: 16.30/0 82 sqft. IV.%,70 162 scift 9.8% 1 - 01so. E�� Standard Propgsed- - Lightilng Power Density 0.927 W/sqft. 0.000 WISCIft Prescriptive Env. Heat Loss 377 Bturn 400, Bluth Proscriptive Env. Heat GaIrl 34,480 Stu/h-F 40,277 Sturn-F I Remarks: F .1g.n Code; 11 D.1 mllLa It, Lwl. i m r, -0-2 2 W-01 3 1 as 2 4: 10 EnergyPro 4.0 by EnergySoft User Number. 5511 Job Number .___Paqe2of11 GENERAL NOTES. 1 ALL BRANCH DUCTS SHALL HAVE BALANCE DAMPERS WITH QUADRANT LOCKS. 2. ALL PUCT SIZES SHOWN ARE NET INSIDE DIMENSIONS. 3. DUCTWORK'SHALL BE GALVANIZED SHEET METAL IN COMPLETE CONFORMANCE WITH U.M.C.... AND SMACNA HVAC DUCT CONSTRUCTION STANDARDS. FLEXIBLE DUCTS MAY BE USED TO CONNECT INTO AIR OUTLETS AND INLETS. MAXIMUM *_00% LENGTH OF FLEXIBLE DUCTWORK SHALL BE 7 4. ALL FLEXIBLE DUCTS SHALL BE INSULATED. MINIMUM BEND RADIUS SHALL BE TWICE THE DUCT DIAMETER. MAXIMUM LENGTH SHALL BE NO MORE THAN -SEVEN PEET. 5.* SUPPLY AND RETURN CONNECTIONS TO UNIT SHALL BE LINED- SHEET METAL PLENUM. 6. DUCT AND PLENUM INSULATION SHALL BE IN ACCORDANCE WITH THE LATEST ED11ION OF THE CALIFORNIA MECHANICAL CODE (C.M.C.) 7. ALL SHEET METAL DUCTS SHALL BE INSULATED BY MEANS OF FOIL WRAP, 3/4 LB. DENSITY FIBERGLASS INSULATION. INSULATION SHALL BE UL LISTED. 8. THERMOSTATS SHALL BE LOCATED AT 4' - 0" ABOVE FINISHED FLOOR (46" MAX. IF MOUNTED OVER CASEWORK OR OTHER OBSTRUCTION) IN ACCORDANCE WITH A.D.A. REQUIREMENTS, UNLESS NOTED OTHERWISE. 90 CONDENSATE DRAIN PIPING SHALL BE COPPER TYPE OVS v AND SHALL BE ROUTED TO AN APPROVED RECEPTOR BY PLUMBING CONTRACTOR. 10. PROVIDE FLEXIBLE CONNECTIONS AT THE INLET AND OUTLET OF ALL FANS. 11. COORDINATE FINAL LOCATIONS OF AIR DISTRIBUTION DEVICES WITH THE ARCHITECTURAL REFLECTED CEILING PLANS, I.E. LIGHTS, SPEAKERS, TILES AND SPRINKLER HEADS. 12. ALL SUPPLY DIFFUSERS SHALL HAVE 4 -WAY AIR FLOW DISTRIBUTION PATTERNSs UNLESS INDICATED OTHERWISE. 13. COORDINATE FINAL LOCATIONS OF THERMOSTATS WITH ARCH. 14. ALL ROOF PENETRATIONS, CUTTING, PATCHINGo BLOCKOUTS, STRUCTURAL SUPPORT9 ROOF OPENINGS, LEVELING OF PRE -FAB CURBS SHALL BE BY GENERAL CONTRACTOR. CONTRACTOR SHALL VERIFY EXACT ROOF OPENING SIZES WITH UNIT MANUFACTURER PRIOR TO START OF WORK AND SHALL MAKE ALL NECESSARY ADJUSTMENTS AT NO EXTRA COST TO OWNER. 15. LOCATION OF ALL MECHANICAL EQUIPMENT SHOWN ARE SCHEMATIC. CONTRACTOR SHALL FIELD COORDINATE EXACT LOCATIONS, SIZES, AND WEIGHTS OF ALL MECHANICAL EQUIPMENT WITH OTHER TRADES INCLUDING BUT NOT LIMITED TO THE STRUCTURAL PORTION OF THE CONTRACT, PRIOR TO START OF WORK. 16. CONTRACTOR SHALL VERIFY WEIGHTS OF ALL MECHANIC * AL EQUIPMENT V41TH THEIR MANUFACTURER PRIOR TO START OF WORK. IF DIFFERENT THAN THE WEIGHTS INDICATED ON DRAWINGS, CONTRACTOR SHALL INFORM THE STRUCTURAL PORTION OF THE CONTRACT PRIOR TO START OF WORK. 17. CONTRACTOR SHALL VERIFY ALL ELECTRICAL LOADS W/MFR. AND COORDINATE WITH THE ELECTRICAL CONTRACTOR AND THE MANUFACTURER PRIOR TO START OF WORK. NOTIFY THE ARCHITECT, IN WRITING, IN CASE OF ANY DISCREPANCIES OR POTENTIAL CONFLICTS, PRIOR TO START OF WORK. 18. ALL HVAC EQUIPMENT, APPLIANCES,. AND DUCTWORK SHALL CONFORM TO THE LATEST GUIDELINES OF A.G.A., U.L. N.F.P.A., U.M.C., U.P.C., AND ALL OTHER LOCAL CODES HAVING JURISDICTION. 19. ALL SPACE CONDITIONING AND VENT)LATION SYSTEMS SHALL BE BALANCED TO THE QUANTITIES SPECIFIED IN THESE PLANS, IN ACCORDANCE WITH THE NATIONAL EN14RONMENTAL BALANCING BUREAU (NEBB) PROCEDURAL STANDARDS9 OR ASSOCIATED AIR BALANCE COUNCIL (AABC) NATIONAL STANDARDS. TEST AND BALANCING SHALL BE DONE BY AN INDEPENDENT AGENCY WITH QUALIFICATION FROM BOTH AGENCIES LISTED ABOVE. 20. CONTRACTOR SHALL FIELD VERIFY EXACT CEILING SPACE AVAILABLE FOR ROUTING OF DUCTWORK. PRIO START M ARCHI T, I WRITING, IN CASE OF ANY DISCREPANCY OR POTENTIAL CONFLICTS PRIOR TO FABRICATING AND/OR PURCHASE OF ANY DUCTWORK. 21. TEST AND BALANCE THE HVAC SYSTEM AS PER REQUIREMENTS OF THE MANDATORY HVAC MEASURES INDICATED ON THIS SHEET. TEST & BALANCE SHALL BE PERFORMED BY AN INDEPENDENT QUALIFIED AGENCY. MANDATORY HVAC SYSTEM MEASURES .4 1 - - W W I I � -I__ W 2. ALL WORK INDICATED ON DRAWINGS AND/OR SPECIFICATIONS SHALL BE COORDINATED WITH WORKS OF OTHER TRADES PRIOR TO START OF WORK. 3. ALL HVAC EQUIPMENT LISTED IN SECTION 100(G) OF THE EES MUST BE CEC CERTIFIED. 4. ALL DUCTWORK SHALL BE INSULATED CONSISTENT WITH THE REQUIREMENTS OF SECTION 118, 123, AND 124 E.E.S. AND TABLE 6D AND SECTION 604 OF CMC. 5. ALL HVAC EQUIPMENT AND APPLIANCE SHALL MEET THE REQUIREMENTS PER SEC11ONS 111-113* 115 AND 120-129 E.E.S. 6. ALL HVAC SYSTEMS SHALL MEET THE CONTROL REQUIREMENTS PER SECTION 112 AND 122 E.E.S. 7. ALL VENTILATION SYSTEMS SHALL BE CONSTRUCTED AND INSTALLED IN ACCORDANCE WTH USC (CALIFORNIA EDITION). 8. THE CONTRACTOR SHALL PROMDE THE BUILDING OWNER, MANAGER, AND THE ORIGINAL OCCUPANTS A LIST OF THE HEATING, VENTILATION, AND AIR CONDITIONING FEATURES, MATERIALS, AND COMPONENTS INSTALLED IN THE BUILDING AND INSTRUCTIONS ON HOW TO USE THEM. 9. INSULATION MATERIAL SHALL MEET THE CALIFORNIA QUALITY STANDARD PER SECTION 118 E.E.S. ' 10. ALL SPACE CONDITIONING AND VENTILATION SYSTEMS SHALL BE BALANCED TO THE QUANTITIES SPECIFIED IN THESE PLANS, IN ACCORDANCE WITH THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB) PROCEDURAL STANDARDS, OR ASSOCIATED AIR BALANCE COUNCIL (AABC) NATIONAL STANDARDS. TESTING AND BALANCING SHALL BE DONE BY AN INDEPENDENT QUALIFIED AGENCY. 11. ALL SYSTEMS SHALL PROVIDE THE MINIMUM OUTSIDE AIR AS SHOWN ON THE MECHANICAL DRAWINGS, AND SHALL BE MEASURED AND CERTIFIED BY THE INDEPENDENT QUALIFIED TESTING AGENCY. 1111111ON loll CONSULTANT: A!111119� i� T -SQUARED PROFMIONAL ENGINERS. INC. 1340 SPECIALTY DRIVE SUITE E \11STA, CA 92081 TEL: (760) 560-0100 FAX: (760) 560-0101 E -Mail admin@tsqeng.com www.tsqeng.com #04091 06-07-06 ISSUE INFORMATION: DATE: I INFORMA-nON: ,&MAY 20() ILAN 6 REVIS ,!�SMAy 18,20061 ILA . I I REVISI SHEET INFORMATION: PROJECT NO.: SCALE: AS NOTED - DATE: MCEMMR 21 2005 PLOT DATE: DRAWNG NAME: SEAL LEGEND SYMBOL ABBREV. DESCRIPTION FLEXIBLE CONNEC'nON, HIM + DUCTWORK 12x8 DUCT SIZE- (1ST NUMBER INDICATES SIDE SHOWN) W INTERNALLY LINED DUCTWORK SINGLE LINE DUCTWORK (L) SINGLE LINE LINED DUCTWORK TV SQUARE ELBOW WITH TURNING VANES ROUND ELBOW MVP MANUAL VOLUME DAMPER RA RETURN AIR SA SUPPLY AIR EA EXHAUST AIR OA OA OUTSIDE AIR FLEXIBLE DUCTWORK ROUND DUCT UP RECTANGULAR SUPPLY DUCT UP RECTANGULAR RETURN DUCT UP RECTANGULAR EXHAUST DUCT UP SD CEILING SUPPLY AIR DIFFUSER RR/RG RETURN AIR GRILLE ER OR EF EXHAUST REGISTER OR EXHAUST FAN @ ELECTRICAL HAND SWITCH HSTAT HUMIDISTAT TSTAT THERMOSTAT TC 11ME CLOCK AL. ALUMINUM AMB. AMBIENT' ARCH. ARCHITECT OR ARCHITECTURAL BTU(BTUH) BRITISH THERMAL UNIT- (PER HOUR) CAP. CAPACITY CFH CUBIC FEET PER HOUR CFM CUBIC FEET PER MINUTE CDR CONDENSER WATER RETURN CDS NDE SE WATER SUPPLY CONN. CONNECTION COP COEFFICIENT OF PERFORMANCE COOR. COORDINA TE CORR. CORRIDOR CU COPPER DS DRYBULB DX DIRECT EXPANSION EAT ENTERING AIR TEMPERATURE EER ENERGY EFFICIENCY RATIO EFF. EFFICIENCY ELEC. ELECTRICAL ENT. ENTERING ESP EXTERNAL STATIC PRESSURE EWT ENTERING WATER TEMPERATURE FrLA - Ji . LOAD AMPS FPM FEET PER MINUTE T. FE T GPM GALLONS PER MINUTE HP (8HP) HORSE POWER (BREAK HORSE POWER) HSPF HEATING SEASONAL PERFORMANCE FACTOR HZ HERTZ IN. INCHES IPLV -INTEGRATED PART -LOAD VALUE KW KILOWATT LAT LEAMNG AIR TEMPERATURE LBS POUNDS LVG. LEAMNG LWT LEAVING WATER TEMPERATURE MAX. MAXIMUM MBH THOUSAND BTU PERHOUR MCA MINIMUM CIRCUIT AMPS MECH. MECHANICAL MFR. MANUFACTURER MIN. MINIMUM MOCP MAXIMUM OVER CURRENT PROTEC'nON NC NOISE CRITERIA OPER. OPERATING PH PHASE POC POINT OF CONNECTION RG RG REFRIGERANT GAS LINE RL RL REFRIGERANT LIQUID LINE RPM REVOLUTIONS PER MINUTE SEER SEASONAL ENERGY EFFICIENCY RATIO SOFT SQU ARE FEET STRUC. STRUCTURAL TEMP. TEMPERATURE TYP TYPICAL TXV THERMOSTA11C EXPANSION VALVE U/C UNDERCUTDOOR V VOLTAGE VEL. VELOCITY VAV VARIABLE AIR VOLUME VFD VARIABLE FREQUENCY DRIVE VVT VARIABLE VOLUME AND TEMPERATURE WB WET BULB wr. WEIGHT 1111111ON loll CONSULTANT: A!111119� i� T -SQUARED PROFMIONAL ENGINERS. INC. 1340 SPECIALTY DRIVE SUITE E \11STA, CA 92081 TEL: (760) 560-0100 FAX: (760) 560-0101 E -Mail admin@tsqeng.com www.tsqeng.com #04091 06-07-06 ISSUE INFORMATION: DATE: I INFORMA-nON: ,&MAY 20() ILAN 6 REVIS ,!�SMAy 18,20061 ILA . I I REVISI SHEET INFORMATION: PROJECT NO.: SCALE: AS NOTED - DATE: MCEMMR 21 2005 PLOT DATE: DRAWNG NAME: SEAL