Loading...
HomeMy WebLinkAbout4077-52t-. * 4 ligis HEAVYDU PROMDE BACKWATER VALVE "ZURN" MODEL 4" GCO —1090, DURA COATED CAST IRON BODY WITH NO HUB INLET AND OUTLET INSIDE 4' CONCRETE UTILITY BOX MARKED "'SEWER". — — — — — — — — — — - HEAVY DUTY 4" GCO Zrk L - — — — — — — — — — — - JENSEN PRECAST #JP750ECEE—CL; 750 GALLON u CL -1 CLARIF'IER- 24" CAST IRON FRAME AND COVER L Tyl f�Co AS4T (GAS TIGHT); PROVIDE 24" WITH G SAMPLING BOX 0 DIAMETER SAMPLING BOX;'VERIFY WITH till ARCHITECT AND CIVIL ENGINEER FOR EXACT L LOCATION. 10 1 7 1 vv VTR P2, �14 L2 s1WCO 2 J!:;�DISHW SHER(D L 1;9 ib , F L) KS -1 3" FLUE U 3 WH -1 00 100 LL r--------------- i F.AL r L ILE L--------------- 2$)VENT­-'_*" UP 0 JE UP ROOF 51PING LINE. 4NECTION CTOR. \-ROUTE -FUU- SIZE DRAIN PIPING FROM AIR COMPRESSOR DOWN TO SPILL TO FLOOR SINK WITH KEY NOIES (1) 4 14 SEWER BELOW GRADE FO R CONTINUATION SEE ARCHITECTURAL DRAWINGS 2'VT_Up - 2" VENT PIPING UP, 2" VENT THRU ROOF. CONNECT 3/4". -HOSE. -WASTE. TO.GARBAGE DISPOSER THRU AIR GAP fITTING 2"VENT PIPING UP, :�' SEWER PIPING DOWN WASHER STAND *PIPE. SEE DETAIL r5 4" VENT UP, 4" VENT THRU ROOF NOT USED @ ROUTE FULL SIZE TEMPERATURE AND PRESSURE RELIEF TO SPILL TO FLOOR SINK WITH MIN. 6" AIR. GAP. PRESSURE AND TEMPERATURE RELIEF VALVE. RUN DISCHARGE FULL SIZE TO OUTSIDE,WALL. ELBOW DOWN AND OUT THRU WALL TO 6"' ABOVE ADJACENT GRADE. SLOPE TO DRAIN. (DICE MACHINE BY OTHERS @ROUTE FULL SIZE DRAIN FROM ICE MACHINE. SPILL TO FLOOR SINK AND TERMINATE @ 2"VENT PIPING UP FROM BELOW GRADE WITH WALL CLEAN—OUT A INDICATED. CONSULTANT: T -SQUARED PROFESSIONAL ENGINEERS, INC. 1340 SPECIALTY DRIVE SUITE E VISTA, CA 92081 TEL:- (760) 560-0100 FAX: (760) 560-0101 E—Mail admin@tsqeng.com www.tsqeng.com #04091 06-07-06 ISSUE INFORMATION: DATE: I INFORMA-nON: .MAY 2006 REVIS! MAY 181,2006 PLAN I REVISI 4 SHEET INFORMATION. PROJECT NO.: SCALE: AS N OTED- DATE.- DECEMBO Z 2005 PLOT DATE: DRAWNG NAME: EAL: t-181541 0 JE UP ROOF 51PING LINE. 4NECTION CTOR. \-ROUTE -FUU- SIZE DRAIN PIPING FROM AIR COMPRESSOR DOWN TO SPILL TO FLOOR SINK WITH KEY NOIES (1) 4 14 SEWER BELOW GRADE FO R CONTINUATION SEE ARCHITECTURAL DRAWINGS 2'VT_Up - 2" VENT PIPING UP, 2" VENT THRU ROOF. CONNECT 3/4". -HOSE. -WASTE. TO.GARBAGE DISPOSER THRU AIR GAP fITTING 2"VENT PIPING UP, :�' SEWER PIPING DOWN WASHER STAND *PIPE. SEE DETAIL r5 4" VENT UP, 4" VENT THRU ROOF NOT USED @ ROUTE FULL SIZE TEMPERATURE AND PRESSURE RELIEF TO SPILL TO FLOOR SINK WITH MIN. 6" AIR. GAP. PRESSURE AND TEMPERATURE RELIEF VALVE. RUN DISCHARGE FULL SIZE TO OUTSIDE,WALL. ELBOW DOWN AND OUT THRU WALL TO 6"' ABOVE ADJACENT GRADE. SLOPE TO DRAIN. (DICE MACHINE BY OTHERS @ROUTE FULL SIZE DRAIN FROM ICE MACHINE. SPILL TO FLOOR SINK AND TERMINATE @ 2"VENT PIPING UP FROM BELOW GRADE WITH WALL CLEAN—OUT A INDICATED. CONSULTANT: T -SQUARED PROFESSIONAL ENGINEERS, INC. 1340 SPECIALTY DRIVE SUITE E VISTA, CA 92081 TEL:- (760) 560-0100 FAX: (760) 560-0101 E—Mail admin@tsqeng.com www.tsqeng.com #04091 06-07-06 ISSUE INFORMATION: DATE: I INFORMA-nON: .MAY 2006 REVIS! MAY 181,2006 PLAN I REVISI 4 SHEET INFORMATION. PROJECT NO.: SCALE: AS N OTED- DATE.- DECEMBO Z 2005 PLOT DATE: DRAWNG NAME: EAL: