HomeMy WebLinkAbout4077-52t-. *
4 ligis
HEAVYDU PROMDE BACKWATER VALVE "ZURN" MODEL
4" GCO —1090, DURA COATED CAST IRON BODY
WITH NO HUB INLET AND OUTLET INSIDE
4' CONCRETE UTILITY BOX MARKED "'SEWER".
— — — — — — — — — — -
HEAVY
DUTY
4" GCO
Zrk
L - — — — — — — — — — — - JENSEN PRECAST #JP750ECEE—CL; 750 GALLON
u CL -1 CLARIF'IER- 24" CAST IRON FRAME AND COVER
L
Tyl
f�Co
AS4T (GAS TIGHT); PROVIDE 24"
WITH G
SAMPLING BOX 0
DIAMETER SAMPLING BOX;'VERIFY WITH
till ARCHITECT AND CIVIL ENGINEER FOR EXACT
L LOCATION.
10 1
7 1 vv
VTR
P2, �14 L2
s1WCO
2
J!:;�DISHW SHER(D
L
1;9
ib , F
L)
KS -1
3" FLUE U
3
WH -1 00
100
LL
r--------------- i
F.AL
r
L
ILE
L---------------
2$)VENT-'_*"
UP
0
JE UP
ROOF
51PING
LINE.
4NECTION
CTOR.
\-ROUTE -FUU- SIZE DRAIN PIPING
FROM AIR COMPRESSOR DOWN
TO SPILL TO FLOOR SINK WITH
KEY NOIES
(1) 4 14 SEWER BELOW GRADE FO R CONTINUATION SEE
ARCHITECTURAL DRAWINGS
2'VT_Up -
2" VENT PIPING UP, 2" VENT THRU ROOF.
CONNECT 3/4". -HOSE. -WASTE. TO.GARBAGE
DISPOSER THRU AIR GAP fITTING
2"VENT PIPING UP, :�' SEWER PIPING DOWN
WASHER STAND *PIPE. SEE DETAIL r5
4" VENT UP, 4" VENT THRU ROOF
NOT USED
@ ROUTE FULL SIZE TEMPERATURE AND PRESSURE RELIEF
TO SPILL TO FLOOR SINK WITH MIN. 6" AIR. GAP.
PRESSURE AND TEMPERATURE RELIEF VALVE. RUN
DISCHARGE FULL SIZE TO OUTSIDE,WALL. ELBOW
DOWN AND OUT THRU WALL TO 6"' ABOVE
ADJACENT GRADE. SLOPE TO DRAIN.
(DICE MACHINE BY OTHERS
@ROUTE FULL SIZE DRAIN FROM ICE MACHINE. SPILL
TO FLOOR SINK AND TERMINATE
@ 2"VENT PIPING UP FROM BELOW GRADE WITH WALL
CLEAN—OUT
A INDICATED.
CONSULTANT:
T -SQUARED
PROFESSIONAL ENGINEERS, INC.
1340 SPECIALTY DRIVE
SUITE E
VISTA, CA 92081
TEL:- (760) 560-0100
FAX: (760) 560-0101
E—Mail admin@tsqeng.com
www.tsqeng.com
#04091
06-07-06
ISSUE INFORMATION:
DATE: I INFORMA-nON:
.MAY 2006 REVIS!
MAY 181,2006 PLAN
I REVISI
4
SHEET INFORMATION.
PROJECT NO.:
SCALE: AS N OTED-
DATE.- DECEMBO Z 2005
PLOT DATE:
DRAWNG NAME:
EAL:
t-181541
0
JE UP
ROOF
51PING
LINE.
4NECTION
CTOR.
\-ROUTE -FUU- SIZE DRAIN PIPING
FROM AIR COMPRESSOR DOWN
TO SPILL TO FLOOR SINK WITH
KEY NOIES
(1) 4 14 SEWER BELOW GRADE FO R CONTINUATION SEE
ARCHITECTURAL DRAWINGS
2'VT_Up -
2" VENT PIPING UP, 2" VENT THRU ROOF.
CONNECT 3/4". -HOSE. -WASTE. TO.GARBAGE
DISPOSER THRU AIR GAP fITTING
2"VENT PIPING UP, :�' SEWER PIPING DOWN
WASHER STAND *PIPE. SEE DETAIL r5
4" VENT UP, 4" VENT THRU ROOF
NOT USED
@ ROUTE FULL SIZE TEMPERATURE AND PRESSURE RELIEF
TO SPILL TO FLOOR SINK WITH MIN. 6" AIR. GAP.
PRESSURE AND TEMPERATURE RELIEF VALVE. RUN
DISCHARGE FULL SIZE TO OUTSIDE,WALL. ELBOW
DOWN AND OUT THRU WALL TO 6"' ABOVE
ADJACENT GRADE. SLOPE TO DRAIN.
(DICE MACHINE BY OTHERS
@ROUTE FULL SIZE DRAIN FROM ICE MACHINE. SPILL
TO FLOOR SINK AND TERMINATE
@ 2"VENT PIPING UP FROM BELOW GRADE WITH WALL
CLEAN—OUT
A INDICATED.
CONSULTANT:
T -SQUARED
PROFESSIONAL ENGINEERS, INC.
1340 SPECIALTY DRIVE
SUITE E
VISTA, CA 92081
TEL:- (760) 560-0100
FAX: (760) 560-0101
E—Mail admin@tsqeng.com
www.tsqeng.com
#04091
06-07-06
ISSUE INFORMATION:
DATE: I INFORMA-nON:
.MAY 2006 REVIS!
MAY 181,2006 PLAN
I REVISI
4
SHEET INFORMATION.
PROJECT NO.:
SCALE: AS N OTED-
DATE.- DECEMBO Z 2005
PLOT DATE:
DRAWNG NAME:
EAL: