'w 1 12.5 so, isol
I -INSTALL ALL IRRIOATION COMPONENTS AC40RDINO TO LOCAL COVES 4
ORDINANCES.
2 -THE CONTRACoTOR SHALL OBTAIN, COORDINATI-E AND PAY FOR ANY AND
ALL PERMITS AND ALL INSPECTIONS AS REWIRED.
5 -THE CONTRACTOR SHALL BE RESPONSIBLE AND LIABLE FOR ANY
ENCROACHMENT INTO ADJACENT PROPERTY, R.OYLS, EASEMENTS
SETBACKS OR ANY OTHER LEOAL PROPERTY RESTRICTIONS EITHER
MARKED OR UNMARKED.
4 -IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO FAMILIARIZE
HIMSELF k4ITH ALL UNDER67ROUND UTILITIES. CONTRACTOR SHALL
REPAIRAREPLACE AT NO ADDITIONAL COST TO THE OHNER, ANY VAMA&E TO
UNDER&ROUND UTILITIES THAT MAY OCCUR.
5—THE CONTRACTOR SHALL BE RESPONSIBLE AND LIABLE FOR ANY AND ALL
VAMAOE DUE TO OPERATIONS OR NE&LECT TO V40RK OF OTHER
CONTRACTORS, EXISTINGs AND NEN PLANT MATERIALS OR ANY OTHER
PHYSICAL ELEMENTS EITHER MARKED OR UNMARtKEV. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR COORDINATION OF ACTIVITIES YqITH ALL OTHER
TRADES.
6 -THE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS
SHOM ON PLANS AT THE SITE PRIOR TO COMMENCEMENT OF ANY HORK.
ALL DISCREPANCIES SHALL BE REPORTED TO THE OINNER AND PROJECT
LANDSCAPE ARCHITECT FOR DIRECTION IMMEDIATELY. ANY CONTINUATION
OF NORK 15 AT THE CONTRACTORS RISK AND EXPENSE.
'I -THE CONTRACTOR SHALL VERIFY THE STATIC PRESSURE, METER SIZE, SIZE
OF SERVICE TO THE METER. ANY DEVIATIONS FROM VESION CRITERIA
SHALL BE BROU014T TO THE ATTENTION OF THE PROJECT LANDSCAPE
ARCHITECT. CONTINUATION OF PSIORK le4ITHOUT NOTIFICATION TO THE
CONTRACTING7 OFFICER SHALL BE AT THE CONTRACTORS RISK AND
EXPENSE
[�W'z
1-<oONTRACTOR, 15 RESPONSIBLE FOR MAKINO HIMSELF FAMILIAR P41TH ALL
UNDER&ROUND UTILITIES, PIPES AND STRUCTURES. CONTRACTOR SHALL
TAKE SOLE RESPONSIBILITY FOR ANY COST INCURRED DUE TO DAMAG-sE OF
SAID UTILITIES.
2-00 NOT P41LLFULLY PROCEED HITH CONSTRUCTION AS OE -91 &NEE7 N4EN IT
19 OBVIOUS THAT UNKNOM OBSTRX.,,TIONS, AREA E715CREPANCIM AND/OR
C-ARADE DIFFERENCES EXIST THAT MAY NOT HAVE BEEN KNOM DURIN69
DESION. SUCH CONDITIONS SHALL BE IMMEDIATELY BR4VGMT To THE
ATTENTION OF THE OMER. THE CONTRACTOR SHALL ASSUME FULL
RESPONSIBILITY FOR ALL NECESSARY REVISIONS DUE TO FAILURE TO CSIVE
SUCH NOTIFICATION.
3 -CONTRACTOR SHALL BE RESPONSIBLE FOR ANY COORDINATION P41TH
SUBCONTRACTORS AS REGUIRED TO ACCOMPLISH PLANTINGs OPERATIONS.
4 -SEE DETAILS AND SPECIFICATIONS FOR STAKIN& METHOD, PLANT PIT
DIMENSIONS AND BACKFILL REQUIRZMENTS.
5 -UPON COMPLETION OF INSTALLATION, A MAINTENANCE PE 100 OF NINETY
MO) DAYS 15 REOUIRZO PRIOR TO FINAL ACCEPTANCE OF THE k4ORK BY THE
ONNER. MAINTENANCE SHALL INCLUDE MONINO, I^EEDIN49, IRRI(SATION,
PRUNING -5, RAISIN67 TREE ROOT BALLS "410H SETTLE BELOH G~E,
FERTILIZINO AND APPLYING7 SUCH SPRAYS AS ARE NECEtSGARY FOR
PROPER CARE AND UPKEEP. MAINTENANCE ALSO INCLUDES ALL REPAIRS,
REPLACEMENT, CLEANIN& AJV ADJUSTIN69 NECESSARY To KEEP THE
IRRIOATION SYSTEM IN 6,000 PqORKINO ORDER HITH rr- COVERA 67E.
COMMENCEMENT DATE FOR THE MAINTENANCE PERIOD SHALL BE APPROVED
IN MITIN& BY THE Ok4NERS INSPECTOR MAINTENANCE FE 100 SHALL BE
AVEOUATE TO VERIFY PLANT CHARACTERISTICS AND ESTABLISHMENT
6 -ALL PLANT MATERIAL SHALL BE APPROVED FOR OUALITY 13Y THE O"4ER,
CITY 4 LANDSCAPE ARCHITECT PRIOR TO INSTALLATION.
1 -FINAL LOCATION OF ALL PLANT MATERIAL SHALL BE SUBJECT TO THE
APPROVAL OF THE OHNERS REPRESENTATIVE AND CITY. LOCATION SHALL BE
APPROVED PRIOR TO EXCAVATION.
a -ALL TREE$ LOCATED LESS THAN T FROM ANY HALLS, HAROSCAPE OR
PAVIN0 SHALL BE INSTALLED P41TH ROOT BARRIERS PER CITY STANDARD
DETAIL. PRIOR TO BACKFILLIN0 TREE(S) PLANTINO, CONTRACTOR SHALL
HAVE OMERS REPRESENTATIVE AND THE CITY APPROVE THE ROOT BARRIER
INSTALLATION.
q -LANDSCAPE CONTRACTOR TO RECEIVE SITE G�RAVEV NITHIN 1/10 OF A
FOOT OF FINISHED GA�OE. CONTRACTOR SHALL ACCEPT C-�RAVE PRIOR To
COMMENCINC7 k4ORK. STARTINGs k4ORK IMPLIES AN ACCEPTANCE OF CziRAvE.
FINAL CziRAVES SHALL BE ADJUSTED AS DIRECTED By Op4NER. ALL
G~INGv SHALL BE COMPLETE PRIOR TO COMMENCEMENT OF PLANTINCv
OPERATIONS. ALL MOUNDS IN PLANT AREAS SHALL NOT EXCEED 3: 1 SLOPE.
6-RE-:FER TO DETAILS 4 SPECIFICATIONS FOR INSTALLATION OF ALL
COMPONENTS.
-q-IRRIOATION PLANS AS VRAPsIN SHALL BE CONSIDERED DIAGARAMMATIC.
ALL PIPE, VALVES, ETC. SHOM AITHIN PAVED AREAS ARE FOR VESI ON
CLARIFICATION ONLY AND SHALL BE INSTALLED IN PLANTINO AREAS
PiHEREVER POSSIBLE.
10 -ONE CONTROLLER CHART SHALL BE PROVIDED AND APPROVED BY THE
CITY REPRESENTATIVE FOR EACH CONTROLLER. THE CHART SHALL BE A
BLACKLINE PRINT, AND A E71FFERENT COLOR SHALL BE USED TO SHON THE
AREA OF COVERAG-E OF EACH STATION. THE CHART SHALL BE
HERMETICALLY SEALED BE7?4EEN T940 PIECES OF PLASTIC. THE CHART
SHALL BE MOUNTED USINO VELCRO OR APPROVED EOUAL TYPE OF TAPE
INSIDE CONTROLLER CABINET. THESE CHARTS MUST BE COMPLETED AND IN
PLACE PRIOR TO FINAL ACCEPTANCE OF PiORK BY THE CITY.
11-ADJJST ALL HEADS FOR NO OVER SPRAY ON NON -PLANTED AREAS AND
FOR COMPLETE COVERA63C. THIS SHALL INCLUDE SELECTING? THE BEST
DEGSREE OF ARC TO FIT THE EXISTINO CONDITIONS. ADJUST FOR PLANT
REGUIREMENTS.
12—CONTRACTOR SHALL COORDINATE LOCATION AND POYsIER HOOKUP FOR
AUTOMATIC IRRIOATION CONTROLLER NITH OMERS REPIRESENTATIVE.
15—THE CONTRACTOR SHALL PROVIDE AND KEEP UP TO PATE A COMPLETE
"AS BUILT" SET ON A REPRODUCIBLE MYLAR. ALL HORKS SHALL BE NEAT
AND LEOIBLE. CONTRACTOR SHALL CERTIFY REPRODUCIBLE AS TO
ACCURACY AND COMPLETENESS. CONTRACTOR SHALL BE RESPONSIBLE FOR
UMATIN49 REPRODUCIBLE AS REGUIREV.
10 -CONTRACTOR SHALL NOTIFY Ok4NER SEVEN (1) DAYS PRIOR TO
COMMENCEMENT OF P40RK TO COORDINATE PROJECT INSPECTION SCHEDULES
AS REOUIRED BY SPECIFICATIONS.
II -ALL AREAS NOT PLANTED IN TURF, &ROUND COVER, OR HYDROSEED, PsIHICH
AIRE LESS THAN 5:1 SLOPE SHALL RECEIVE; 4" MIN. DEEP OF SPECIFIED MULCH.
SUBMIT SAMPLE TO OMERS REPRESENTATIVE FOR APPROVAL PRIOR TO
APPLICATION.
12-k*,EE0 CONTROL: KILL AND REMOVE ALL EXISTINO V4EEV9 FROM SITE AREA.
FOR VENTION OF k4EEV SEED GiERMINATION(AITH HYDROSEED OPTION
ONLY) SPRAY ENTIRE PLANTIN(5 AREA SOIL NITH A PRE-EMER&ENT HERBICIDE
AS RECOMMENDED AND APPLIED BY AN APPROVED PEST CONTROL ADVISOR
AND APPLICATOR MINIMUM OF 60 DAYS BEFORE HYDROSEEVINCS AND
BEFORE ROOTED GrROUN0 COVERS HAVE BEEN PLANTED. THE HERBICIDE
SHALL BE APPLIED TO DRY SOIL, THEN, P41THIN ONE HOUR OF APPLICATION
INCORPORATED INTO THE SOIL BY IRRI GATION FOR A MINIMUM OF 15 MINUTES.
AVOID KATER RUN OFF OR SOIL EROSION AFTER THE PRE-EMERSENT
HERBICIDE HAS BEEN APPLIED. COORDINATE HERBICIDE APPLICATION P41TH
14YOROSEEDINGS OPERATIONS.
13 -SOIL TEST: AFTER ALL SOIL HAS BEEN IMPORTED TO THE SITE BUT BEFORE
SOIL PREPARATION, THE CONTRACTOR SHALL OBTAIN A SOIL TEST FOR
A67RICULTVRAL SUITABILITY AND FERTILITY PREPARED BY A CALIFORNIA
ASSOCIATION OF A&RICULTURAL LABORATORIES MEMBER. FURNISH I COPY OF
TEST RESULTS TO THE CITY AND LANDSCAPE ARCHITECT.
14 -SOIL PARATIONs THE FOLLOY41NC-7 SOIL AMENDMENTS SHALL BE FOR BID
PURPOSES ONLY. FINAL SOIL AMENDMENT TYPES AND OUANTITIES SHALL BE
BASED ON SOIL TEST RECOMMENDATIONS. ROTOTILL THE FOLLONING
AMENDMENTS 6" INTO THE SOIL AT RATES INDICATED PER 1,000 SWARE
FEET:
4 CU. Y09. NITRO&EN STAE31LIZED SAHOUST
120 LBS. OYPSUM
125 LISS. GRO PONER PLUS