HomeMy WebLinkAbout3953-2113
CL
co
a
c:
Q
CP4
C
Lu
v
0
30
CC
n
CC
30
Li
NOTE: GENERAL PLANTING NOTES: 4) ALL PLANTER AREAS TO BE SURFACED WITH 3" LAYER COMPOSTED ORGANIC MULCH AFTER PLANTING.
1. REFER TO PLANTING LEGEND SEE SHEET 22. 1) THE GROUND COVER INDICATED FOR EACH PLANTING AREA IS TO COMPLETELY COVER ALL PLANTING AREA AT THE 5) ROOT BARRIER TO BE INSTALLED FOR ALL TREES WITHIN (5) FIVE FEET OF PAVING EDGE. - 1
2. GENERAL PLANTING NOTE SEE THIS SHEET 20 SPACING SPECIFIED. 6) APPLY APPROPRIATE PRE—EMERGENT HER131CIDE TO ALL SHRUB AND -GROUND COVER AREAS' AFTER INSTALLATION OF
3. LANDSCAPE NOTE SEE SHEET 23. 2) REFER TO SPECIFICATIONS FOR STANDARDS TO BE VERIFIED BY THE CONTRACTOR. TREES AND SHRUBS AND PREPARATION OF FINE GRADING.
4. PLANTING DETAIL SEE SHEET 26 3)- PLANT * MINIMUMS: 7) REFER TO SPECIFICATIONS FOR STANDARDS OF MATERIALS AND WORKMANSHIP.
.1 GAL 10" MIN. HEIGHT 8) CONTRACTOR* IS TO. REVIEW PLANS. VERIFY SITE CONDITIONS AND -PLANT QUANTITIES PRIOR TO INSTALLATION.
5 GAL 18" MIN. HEIGHT CONFLICTS BETWEEN THE SITE AND THESE,PLANS OR WITHIN THESE PLANS SHALL BE BROUGHT TO THE ATTENTION OF
15 GAL 1 3/4" CALIPER- THE*,tNGINEER PRIOR TO -LANDSCAPE INSTALLATION. ANY DEVIATION(S) FROM THE. PLANS OR SPECIFICATIONS IS TO HAVE
24" BOX 2 1/2" CALIPER WRITTEN APPROVAL.
36" BOX 9) THE CONTRACTOR SHALL BE RESPONSIBLE FOR, MAKING HIMSELF -FAMILIAR WITH ALL'UNDERGROUND UTILITIES AND
STRUCTURES. THE CONTRACTOR SHALL TAKE. SOLE RESPONSIBILITY....FOR ANYCOST INCURRED DUE- TO DAMAGE OF SAID
UTILITIES OR STRUCTURES., IF PROPER VERIFICATION BY CONTRACTOR WAS NOT PERFORMED.
10) DO NOT WILLFULLY PROCEED WITH PLANTING OPERATIONS AS DESIGNED WHEN IT IS OBVIOUS THAT UNKNOWN
OBSTRUCTIONS AND/OR GRADE DIFFERENCES EXIST THAT MAY NOT HAVE BEEN KNOWN DURING THE DESIGN PROCESS.
SUCH COND11IONS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ENGINEER.
. . . . . . .......... — ------ . . . ......... ..................... ..... . .......... . . . ............. ........... . ............ ..... ............ ... . ........ . . . . .......... ............. . ...... .............. . .. . .................. ..................... ....... . ............ . . . . .......... ...................... ..........
11) THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ALL NECESSARY REVISIONS DUE TO FAILURE TO GIVE
SUCH NOTIFICATION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY COORDINATION WITH SUBCONTRACTORS AS
C) REQUIRED TO ACCOMPLISH HIS PLANTING OPERATIONS.
. . ... ....... ........ . ..... . .. ..... ....... ........ . ..... ... 12) REFER TO THE SPECIFICATIONS FOR PLANTING REQUIREMENTS, MATERIALS AND EXECUTION.
. ..... ..... . ........ CD
r(c 13) ALL TREES SHALL BE TAGGED BY THE CONTRACTOR FOR APPROVAL BY THE OWNER'S AUTHORIZED REPRESENATIVE.
....................................................... 14) FINAL LOCATIONS OF ALL PLANT MATERIALS SHALL BE SUBJECT TO,THE APPROVAL OF THE OWNER'S AUTHORIZED
. . ....... ........ ... 0 m (D
. ............... . ....... ........ . . . . . ....... .... . ... REPRESENTATIVE. CONTRACTOR IS 10 DO THE FOLLOWING BEFORE BEGINNING PLANTING OPERATIONS: A. SHRUBS AND
. .. . . . ........ . ...................................... . ......................... 00
LAY OUT THE ACTUAL CONTAINERS ON—SITE PRIOR TO DIGGING -HOLES.
GROUND COVER
tZ 15) THE CONTRAC- TOR SHALL NOTIFY THE OWNER'S AUTHORIZED REPRESENTATIVE, AT LEAST 48 HOURS- IN ADVANCE PRIOR'
.......... 60 <
.......... . . ......... .................. G 0 G . ..... . ........... G ...................................... G . .. . . .......... —G _G —G . ................ G ......... I ........... ................ . G ... . . ............ G G G ....... c G i TO COMMENCEMENT OF WORK TO COORDINATE PROJECT OBSERVATION SCHEDULES.
. . ..... ............................ .... G to G . ...... .......... . G F__
... .......... . . .......... ................... . . ......... . . . .......... ..... .
K�sL4 E --A VEN L UO 16) 'IF CONFLICt ARISE BETWEEN THE ACTUAL SIZE OF AREAS ON THE SITE AND THE DRAWINGS, THE CONTRACTOR
... . .... . . ...... . .. w w . . ........ ................. . . w ........ . ......... ......... w .......... ................. . ......... W
w s .... ... ..... . ....... w SHALL CONTACT. THE OWNER'S AUTHORIZED REPRESENTATIVE FOR RESOLUTION. THE. CONTRACTOR SHALL A$SUME FULL-
Lij
---- - ------------- - ----- ---- .. . ...................... .......... .......... .. . ................. ..................... ................... ... . ................ . . . .......... ..................... .......... . . . .......... . . ..... . ........ ....... . ..... . . . ..... RESONSIBILITY FOR ALL NECESSARY REVISIONS DUE TO FAILURE TO -GIVE SUCH NOTIFICATION.
..... ................ ........... w
17) IT IS THE CONTRACTORPS RESPONSIBILITY TO FURNISH PLANT MATERIAL FREE OF PESTS OR PLANT DISEASES.
PRE—SELECTED — TAGGED" PLANT MATERIAL MUST BE INSPECTED BY THE CONTRACTOR AND CERTIFIED PEST AND
LIMIT OF WORK
low m m mw Am--- DISEASE FREE. IT IS THE CONTRACTOR'S OBLIGATION TO WARRANTY ALL PLANT MATERIAL PER THE SPECIFICATIONS.
ov.ot� ------- ------- -- -- --- ------
18) GROUND COVERS AND SHRUBS ARE TO BE TRIANGULARLY SPACED UNLESS OTHERWISE INDICATED ON THE DRAWINGS.
.... . ...........
YU
.... . .....
7",
...... . —GRADE PLANTING AREAS, THE CONTRACTOR SHALL
19) AFTER FINISH GRADES HAVE BEEN ESTABLISHED FOR ALL ON
Xm: ........
.......... .... .....
Mi 615-0116 FOR SOIL FERTILITY
HAVE (3) MINIMUM SOIL SAMPLES TESTED BY WALLACE LABORATORIES, (310)
-7
;J
... .. AGRICULTURAL SUITABILITY, AND SOIL PREPARATION RECOMMENDATIONS. THE CONTRACTOR WILL BE REQUIRED TO AMEND
oor::
THE SOIL TO CONFORM TO THESE RECOMMENDATIONS.
....................... --------- . ............................
— ----- --------- 20) REFER TO CIVIL ENGINEERPS PLANS FOR BIKE TRAIL MATERIALS AND CQNSTRUCTION.
...... uiv=
*Qim
UB
0
-oo-�
FO . ................. FO . ......... 1pr ........................
FO
0 T
lol� ,,,�4 T Jo
A
p4m
-91'. _16
.......... ..
P14cm Zvj".
01 "u-14-i'm
, 7
ILI .11 .1.wl _imo a I Arm
kv
J.
T 1-2, ArAT W%V-)ooff
V;v 41 A _ 1\ 1,
..,!Oo,o %
�0
L JL'5.%V.
n,:,
i
..........
...... ..................... ............... ... ........
............ ................... ..... .... ....
.. .. .. .... ........ ..... ..................
T .......
. ......... ....... ..... .. .........................
......................... ............
.......................
............... .. . .... ............. .........
............... ...........................
. .. .................
. ...........
.. ................. ....... ................
.1 .................... ..............
ly
. ...........
..................... ........... ......
....................... ..... .. ....... ............... .... .. ................... ......
...... ........ ... ....
. ....... .. ..... .. ........................... ........... ....... .. ......
............ ............. ..... ........... * ......... . .............. .
t, - Yp . .......
.. ... ... ... E? .. ...... ...... * .......... ............ ............. .... ... ..............
-A
............ P .. ..... .. .. ............... . ............ .
.......................... .. ................................... ....... ........ ..........
. ....... .......
--- ........ ...... . .... Q.)
. ........... ..................... ......... ........
.............
.... .......... ..... .......
.............. ........ ..... .. ..... C�
......................
il� .... ......
..... . ...........
..........
..................... ...................
. .... ........ +
00" .,.*;.*, . ... .......
................
. .....................
.................
............ ........
%<0000
.............
.... ..........................
.. ....... .
...... C*V
wa 0.
0-00 wo
60016000!00,
I.- . m am
go
N-1 100 ___ .O�� IAJ
4* ."IN
01*
to .-o
;;00000
wo mmmmaw to
10 .40'
LIMIT OF% WORK
0 20 60
. .......... x
x
A
x
SCALE: 1"=209
.................. e .. . ...................... .............. ------------- N, __j
...... ...... ..... . ............... ... ..... . ................
Ds
40
E
Ad A4
[:ANDSCAPE ARIfHITECTS
ui
K 0 0 0 m m . 12MI/210(S
3822 CAMPUS DRIVI� SUITE 120 e NEWPORT BEACH, CA. 92626 (949) 756-0150
uate-1
OF c