Loading...
HomeMy WebLinkAbout3783-1GENERAL NOTES 1. ALL WORK SHALL BE IN ACCORDANCE NTH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE CONTRACT PROVISIONS AND THE STANDARD SPECIFICA11ONS FOR PUBLIC WORKS CONSTRUCTION ("GREEN BOOK"). ALL REFERENCE SPECIFICA11ONS AND STANDARDS SHALL BE THE LATEST ED11ION UNLESS OTHERWISE NTED. 2. WHER A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE RESOLVED BY REFERENCE TO PRECEDENCE PROVISIONS IN THE "GREEN BOOK," THE CONTRACTOR SHALL IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENGINEER FOR RESOLUTION. 3. ALL MATERIALS AND ME11-IODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER. 0 BENCH MARK. DEW MW "7 ALM & Ul PK MM NEST END SWR aEMM ISM31 CITY F F TA A P-1 im-wwwwwwwommmml INDEX MAP �p SCALE: 1 =100' =�=& w=mnwlw H. NO. 9 - NIMOM m=7w, SIZE - - SOIL I ,TED 90% Lissimilim, itil BASELINE ROAD CITY OF FONTANA RAYMOND CT ECT MILLER AVENUE E < < 'ANY FOOTHILL BOULEVARD TABLE 200-1.2(A) PERCENTAGE PiSSING SIEVES SIEVE SIZE CONSTRUCTION NOTES & QUANTITIESi-I ITEM DESCRIPTION QUANTITY - - - - - - - - - - - ABANDONMENT CONSTRUCTION, SEE SHEET 3 FOR NOTE 1 LS TEST GRADING INSTALL 8" EXTRA STRENGTH VCP SEWER -2,21.2, LF CONSTRUCT 48" PRECAST CONCRETE MANHOLE PER CITY STD DETAILS 109 AND 112 10EA U4 CONSTRUCT 4" VCP SEWER LATERAL AND HOUSE CONNECTION PER CITY OF FONTANA STD. 1,735 LF NO. 125 AND 1258. (SEE GENERAL NOTES 30 & 31) (J5 PROVIDE BACKFLOW DEVICE FOR UNITS WHEN PAD ELEVAT10N IS LOWER THAN UPPER 17 EA MANHOLE RIM ELEVATION, SEE PLAN BREAK INTO EXISTING MANHOLE 2 EA U7 ADJUST MANHOLE TO GRADE 2 EA U8 INSTALL TEMPORARY 8" END PLUG 4 EA n9 TRENCH REPAIR PER CITY STD DETAIL 10,31 16, 883 SF BASELINE ROAD CITY OF FONTANA RAYMOND CT ECT MILLER AVENUE E < < 'ANY FOOTHILL BOULEVARD TABLE 200-1.2(A) PERCENTAGE PiSSING SIEVES SIEVE SIZE 1/2 90-100 - - - - - - - - - - - ASTM C 131 TEST GRADING TYPICAL BEDDWG FOR 8" WP 0 LESS.. RAN___.j_Q 1, DEE N.T.S. imp mw��� MOWS CONS7RUCTION 7ABLE 200 1.2 [A] SHO%W HEREON COUNTY OF SAN BERNARDINO I a 14i'm R `--SEWER LINE IS LOCATED ON THE WEST AND SOUTH SIDE OF CENTERLINE LATERAL LOCATION DETAIL NTS UTILITY LEGEND PROPOSED SEWER LINE PROPOSED SEWER LINE PER OTHER SHEET EXIS-nNG SEWER LINE PER OTHER PLANS EXISTING SEWER LINE STORM DRAIN LINE T_ - WATER 'EX -4- q SEWER MANHOLE 40� - PROPOSED RIGHT OF WAY EXIS"11N: T OF WAY E DGE OF,J"ll AVEMENT �17 "log, vy fq A al '4" �WVINA IN 111 UTPICAE-BEVAUTWU Fum b`_�UP7101P 1 Q .09, EEP�ER N.T,So I lip AA R `--SEWER LINE IS LOCATED ON THE WEST AND SOUTH SIDE OF CENTERLINE LATERAL LOCATION DETAIL NTS UTILITY LEGEND PROPOSED SEWER LINE PROPOSED SEWER LINE PER OTHER SHEET EXIS-nNG SEWER LINE PER OTHER PLANS EXISTING SEWER LINE STORM DRAIN LINE T_ - WATER 'EX -4- q SEWER MANHOLE 40� - PROPOSED RIGHT OF WAY EXIS"11N: T OF WAY E DGE OF,J"ll AVEMENT �17 "log, vy fq A al '4" �WVINA IN 111 UTPICAE-BEVAUTWU Fum b`_�UP7101P 1 Q .09, EEP�ER N.T,So I lip