Loading...
HomeMy WebLinkAbout3757-15y GENERAL CONDITIONS 2. Trenches for pipe shall be cut to required grade line V. DRAWINGS OF RECORD (AS-BUILTS): O 2. Soil sulfur shall be standard commercial grade. E. DELIVERY SLIPS: Supply delivery slips from the supplier for G. ROLLING: Roll sod with on adequately weighted roller to / l/r .4 XIX. FINAL CONSTRUCTION AND FINAL MAINTENANCE INS'OkCTION;' A. CONTRACT DOCUMENTS• Shall consist of specifications at a true gradient to provide uniform support for the N i� 00 cc W the soil amendments to the site. Bulk toads from the smooth out the sod bed. • and its eneral conditions and the drawin s. The intent g g length of the pipe. A. GENERAL: Cd 3. Humus, "Gro -Power" 5-3-1 shall be manufactured by Contractor's yard will not be accepted. Supply empty bags for fertilizer to the Superintendent of the job and the Owner's r--' , - A. FINAL CONSTRUCTION INSPECTION: of these documents is to include all labor, materials, Southern California Organic Fertilizer Company, Representative. H. PROTECTION OF EDGES: Regrade to protect the edges from . and services necessary for the proper execution on the work. The documents are to be considered as one. 3. Depth of trenches shall be sufficient to provide a The Contractor shall rovide and kee u to date, in P P P Cd Glendale, CA (213) 245-6849 or (714) 750-3830. � drying if mowing edge is not used. When all landscape improvements have been installed in Whatever is called for by any parts shall be as binding minimum cover above the to of the i e as noted on P P P the drawin s. 9 accordance with this section, a complete set of record " ^ � � �� VIII. SHRUB AND TREE PLANTING: � � accordance with the Ions and s ecifications, the P P as if called for all parts. rH�0 V1 as -built" black line ozalid prints which shall be corrected 4. Bone meal 2-22-0 shall be manufactured by Kellogg I. WATERING: After installation sod must be kept thoroughly Contractor shall notif the Owners Re resentative and y p daily and show every change from the original drawings and "as Supply, Wilmington, CA. watered to a depth of 6 . No foot traffic shall be allowed request a "Final Construction" inspection. If the Owner's B. JOINING PIPE: specifications and the exact -built" locations, sizes and A. CORRELATION: Trees and shrubs shall not be planted until for 2 to 3 weeks from the date of installation. Representative determines the work to be substantially B. VERIFICATION: The Contractor shall verify measurements kinds of equipment. Prints for this purpose may be obtained 5. Azalea organic planter mix #103 shall be manufactured all operations in conjunction with the installation of the coin lete and in conformance with lans and s ecifications, P P P on the drawin s before be innin work. In case of error g g g or discre ane in the drawin s ors ecifications or in P Y� 9 P 1. The Contractor is responsible to be familiar with the from the Owner. This set of drawin s shall be ke t on the g p site and shall be used onl as a record set. These drawin s Y 9 by Bandini Fertilizer, irrigation system have been completed, final grades have been established, and the lantin beds ro erl re ared b P 9 P P Y P P Y J. INSPECTION BY SUPPLIER: If there are any questions regarding the Contractor will be advised that the basic Wined 90 Y ( ) the work of others affecting his work, he shall notify methods of assembling, joining, and installing the various shall also serve as work progress sheets and the Contractor cultivation and fertilization as covered in these specifications. the quality of sod installation a representative of the supplier day maintenance period is started. the Owner's Representative immediately. The Contractor types of pipes to be used. He will adhere in strict the shall make neat and legible notations thereon daily, as the 6. Ph Acida!! shall be manufactured by Kellogg Supply, shall be requested to inspect the installation and the Contractor shall call out the su lier's re resentative. PP P shall be held responsible for any damages or loss due to his failure to observe these instructions. accordance with manufacturer's recommended procedures. work proceeds, showing the work as actually installed. These drawings shall be available at the times for inspection and Wilmington, CA. B. PLANTING TIME: No lantin shall take lace durin extreme) P g P 9 Y 1. In order to be substantial complete, at least the following must have been finished. shall be kept in a location designated by the Owner's 7. Par - 5 shall be manufactured by Kaibob Forest Products. hot, dry, windy or freezing weather. XII. SEED LAWN PLANTING (IF APPLICABLE): C. MATERIALS, MACHINERY, EMPLOYEES: Except as otherwise 2. PVC pipe shall not be threaded and all transition from PVC Respresentative. C. LOCATIONS: Relative position of all plants and trees is subject a. All fine grading, including elimination of low noted, the Contractor shall provide and pay for all materials, labor, tools, and other items necessary and to metal piping shall be by PVC male threaded adapter fittings. B. REQUIRED NOTATIONS: 8. Commercial fertilizer shall be Best Products of approved to approval of the Owner's Representative and they shall, if A. REFERENCE: Refer to Paragraph V, VI, VII, for finish grading, weed control, and soil preparation. P oints that hold runoff. b. A complete and operable irrigation system. incidental to the completion of his work. equal. necessary, be relocated at his direction as part of this contract. Trees shall normally be located a minimum of 5' c. Installation of all plant materials. C. BACKFLOW PREVENTER: The backflow prevention device 1. The Contractor shall dimension from two (2) permanent B. TOP SOIL: from buildings, site amenities and walkways. B. PREPARATION: Cultivate to a depth of 2" below finish grade, d. Seeding of all seeded areas. D. SURVEYS, PERMITS, REGULATIONS: The Owner shall furnish specified herein shall be verified with local plumbing and points of reference, building corners, sidewalks, or road remove stones, foreign growth of any kind and extraneous an adequate survey of the property. The Contractor shall obtain and pay for all permits and comply with all health codes. In the event of any conflict on the device or the installation methods, the Owners Representative intersections, etc., the location of the following items: 1. Topsoil consists of a fertile, friable natural loam of D. I IB I m re II D UT ON: No plants sho be distributed about the matter, and grade to remove ridges and depressions so that areas after settlement will conform to the finish grade. Roll 2. Minor pick-up items may be completed during the basic maintenance period. These items will be lows and ordinances bearing on the operation or conduct shall be notified PRIOR TO BID OPENING. a. Gate valves uniform quality, tree from subsoil, stiff clay, hard clods, nds c landscape area that can be planted and watered on the same day. and rake lightly until the surface is smooth, friable artd of determined as Minor solely by the Owner's of the work as drawn and specified. If the Contractor hard pan, sod, partially disintegrated debris, or other uniform fine texture. Representative. observes that a variance exists therewith he shall D. TESTS: b. The routing of the irrigation main lines undesirable materials. promptly notify the Owner's Representative in writing c. Connection to the existing water lines E. CONTAINER REMOVAL: Plant containers shall be removed when C. SOWING: Sow lawn seed in the area designated on the B. FINAL MAINTENANCE INSPECTION: At the end of the and any necessary changes shall be adjusted as provided in the contract for changes in the work. 1. All main lines and lateral lines which have glued joints d. Irri ation control valves 9 2. Topsoil shall not contain obnoxious weeds, such as planting the plants. Container may be split on both sides, however, without use of axe or spade. All containers shall be drawings at the rote as designated on the Planting Plans. maintenance eriod and when the r P g ound cover and turf under paving the system shall be capped and e. Quick Coupling valves morning glory, Sorel, oxalis, spurge, annual poo, removed from the site. Sow the town in two directions, have established and all pick-up items have been completed, pressure tested at 150 PSI. d f. Controller/Rain-check locations nut ross or bermuda ross. 9 9 the Contractor shall request a final maintenance inspection. E. PROTECTION OF WORK, PROPERTY AND PERSON: The Contractor shall adequately protect the work, adjacent g. Master valve or Pump C. PLANT MATERIALS: F. PLANTING PITS: All tree and shrub pits shall have a diameter D. TOP DRESSING: Rake lightly, spread 1/4" of Par -5 top The Contractor will be advised by the Owner's Representative at the final inspection that work is or is not satisfactory. property, and the public, and shall be responsible for 2. Pressure shall be sustained in the lines for not less than of at least twice the diameter of the root ball. Pit depths dressing with a mechanical spreader, roll with a 200 lbs, roller and water with a fine spray. any damages or injury due to his act. two (2) hours. If leaks develop, the joints shall be replaced and the test repeated until the entire system 2. The drawing shall show approved subsitutions of sizes, materials, and manufacturers name and catalog number. " 1. Plant names in the Plant List conform to Standardized shall be a minimum 12" deeper than the root ball for trees and 8" deeper than the root ball for shrubs or as per 1. the work n satisfactory, the basic maintenance F. CHANGES IN THE WORK: The Owner may order changes in is watertight. Plant Names" by American Joint Committee of planting details. XIII. HYDROSEEDING SPECIFICATIONS (IF APPLICABLE): period will end on the date of the final inspection p as directed by the Owners Representative. the work, and the contract sum being adjusted accordingly. C. DELIVERY OF DRAWINGS OF RECORD: Horticultural Nomenclature, except in cases not covered therein. In these instances the established custom of I i he h rders nd adjustments lux c a ms b t All sue o a j p y n r v caner s 3. Test shall be observed a d app o ed by the 0 the nurse trade in followed. ry G. PLA ING: PI n s sh II n C a t a be laced a d held durin backfill in P g A. NRA : The h r m i h i GEE L d o u c shall be a led in the form f Y PP ° ° 2, If the work is unsatisfactory the basic maintenance Contractor for extras must be made in writing before Representative prior to backfill. On or before the date of final ins ection, the Contractor P an upright position in the center of the pit. Plants shall slurry consisting of wood cellulose fiber, seed, chemical period will continue at no additional expense to the executin the work involved. 9 shall deliver the corrected and complete blacklines to the Owner's Representative. Delivery of blacklines will not relieve 2. Plants shall be sound, healthy, vigorous, free from be held at, or sli htl above nurse level. The earth ball g y O' shall be ke t intact. An ex osed roots shall be s re P y p p od additives, commercial fertilizer and water. When h droulicall y Y sprayed on the soil surface, the hydromulching shall form Owner until the work has been cam leted, ins ected, P P G. CORRECTION OF WORK: The Contractor shall re -execute 4. When the Irri ation stem has been cam leted and 9 sY P ( before lantin has be un the Contractor, in the P 9 ) the Contractor of the responsibility of furnishing required disease and weeds, insect pests of their eggs and shall have healthy, normal root systems, filling their out. In ured roots shall be runed. J P a blotter like round cover im re nated uniform) with seed 9 P 9 Y and a roved b the Owner's Re resentative. PP y P an work that falls to conform to the re uirements of Y q , resence of the Owners Re resentative, shall test the P P information that may be omitted from the prints. well container, but not to the point of being root bound. and fertilizer and shall allow the absor tion of moisture and P rainfall to percolate to the underlying soil, C. FAILURE TO PASS INSPECTION: If the work fails to pass the contract and shall remedy defects due to faulty coverage of water afforded to the lawn and planting areas ' 's H. BACKFILL: Plant pit backfilling soil shall consist of 1 part final inspection, any subsequent inspections must be n i r he materials or workmanship upon written of ce f om t Owner's Re resentative fora eriod of ninet 90 da P P Y ( ) Ys e r as complete and adequat . The Cont actor shall fine h all materials and erform all work re uired to correct P q D. CONTROLLER CHARTS: 3. Plants shall not be pruned prior to delivery except as nitro ens ill ed sawdu s ri I tab z st to 2 art to soil. Mate als Sha I 9 P P be thorou hl mixed before lacement. In addition to 9 Y P B. EQUIPMENT: H draulic a ui ment used for thea lication of q P PP rescheduled as er above and will be char ed to the P g from the date of completion of the contract. any inadequacies of coverage. 1. As -built drawings shall be received and approved by authorized by the Owners Representative. In no case trees be topped. backfill, commercial fertilizer 20-10-5 Agriform 21 gram e the fertilizer, seed, and slu Nry of prepared wood pulp shall be "super Contractor at the prevailing hourly rate of the Owner's of the Owner's Representative. shall tablets shall be added to plant pits at the following rates: of the hydro -seeder type as approved by the Owner's H. LANDSCAPE COORDINATOR STATUS: The Landscape 5. The Contractor shall inform the Owner's Representative the Owners Representative prior to preparing controller charts. Representative. Coordinator acts as the authorized representative of the of any deviations from the plan required by wind, planting, 4. All plant materials shall be subject to approval of size, 1 tablet per 1 gallon container Owner in conjunction with the project manager, and has soils, or site conditions that has a affect on present health, quality, character, etc., by the Owner's 2 tablets per 5 gallon container C. APPLICATION: The operator shall spray the area with a uniform authority to accept or reject materials or workmanship coverage. 2. Provide one controller chart for each controller supplied. Representative. 3 tablets per 15 gallon container visible coat by using the green color of the wood pulp as a and to make minor changes in the work not involving extra 4 tablets per 24" box guide. The slurry shall be applied in a sweeping motion in o cost. He will also interpret the meaning of the contract E. IRRIGATION HEAD INSTALLATION• 3. The chart shall be a reduced drawin of the actual 9 5. The height and spread of all plant materials shall be 5 tablets per 30" box „ arched stream so as to fall like rain allowing the wood fibers documents and may stop the work if necessary to ensure its proper execution, as -built system, using a different color to indicate the area of coverage for each station. measured with branches in their normal osition. P 6 tablets per 36 box 7 tablets er 42" box P to build on each other until a good coat is achieved and the material is s read at the re uired rate er acre. P q P CITY OF FONTANA STANDARDS LANDSCAPE MAINTENANCE 1. Shrub and ground cover spray heads adjacent to curbs S tablets per 48" box and those box sizes which are larger SPECIFICATION FOR ALL C.F.D. AREA I. CLARIFlCATION OF DRAWINGS BEFORE BIDDING: After or walks shall be installed 1 away from the curb or walk and the heads shall be pop-up models as 4. When the chart is completed and approved by the Owner's 6. The caliper of all trees shall be measured 4' above the surface of the ground. D. TIME LIMIT: All slur mixture which has not been o lie ry PP 'd reviewin the drawin s thorou hl it is the Contractor's 9 g g Y indicated on the drawings. Re resentative, it shall be hermetical) sealed and laced P Y P I. WATERING: When the pit has been backfilled to three quarters within four hours after mixin will be rejected and removed g j 3.07 THE NINETY (90) DAY MAINTENANCE PERIOD responsibility to clarify with the Owner's Representative in the controller box. of its depth water shall be poured about the roots. Air from the project at the Contractor's expense. any questions the Contractor may have regarding the 7 Where all er or her dimensions of n I n m eri Is c p of o y p a t at a ockets shall be eliminat n b fill nine n i p ed a d ack cot u d u t I the A. Prelimina Review: As soon as all plantings are completed per Contract method of construction, quantities, or quality of materials f r n the included I the Contracto tact 2. Shrub spray heads adjacent to building, fences, or strut res shall be installed 1" awa from the to VI. CLEAN-UP: are omitted from the plant list, it shall be understood that these lant materials shall be normal stock for the P backfill is brought to grade level. E. PROTECTION: S ecial care should be exercised b the P y ocumen s, RYT a relimina review to determine the condition of the work P ry or called out. cannot co Owners Representative, the Contractor must qualify his bid simit r a y structure and the nozzle shall be 6" minimum above finish type listed. J. COMPACTING: Backfill shall not be compacted around the Contractor in preventing any of the slurry being sprayed inside any reservoir basin or onto drainage ditches and channels i r.'s resen tive or accept the interpretat on of the Owne Rep to r e Shr s ra heads no near avin structures gad . ub " p y t p g A. SCOPE AND FREQUENCY: After installation operations roots or ball of the plant during or after planting. The which may impede the free flow of rain or irrigation water. b. Date of Review: Submit a written request to the Agency's Authorized I ns r c i n on the questionable areas as they deveop during co t u to sh II a set above finis r e a b 8 h g ad have been completed, remove all trash, excess soil and 8. Plant material shall be symmetrical, typical for variety backfill on which the plant ball rests shall be lightly compacted. Any slurry spilled into restricted areas shall be cleaned up at Representative at lease five (5) working days prior to anticipated date of rubbish from roe Alt scars, ruts, or other marks P P rfY and species, and shall conform to measurements specified the Contractor's expense to the satisfaction of the Owner or J. SAMPLES: The Owners Representative reserves the right to 3. All irrigation heads are to have double swing joints as in the area caused by this work shall be repaired and the ground left in a neat and orderly condition in the Plant List /Legend. K. SETTLEMENT: Plants which settle shall be raised to the Owner's Representative. review. take and analyze samples of materials for conformity to ns ime he n ractor sh Il furnish s ecificatio at an t T Cot a P Y detailed. throughout the site. The Contractor shall pick up all required level or replaced at the option of the Contractor. C. Beginning of the Ninety (90) Day Maintenance Period: The date on which the samples upon request by the Owner's Representative. Rejected thrash resulting from his work no less than each Friday 9. Plant material larger than those specified may be Raised plants whjch fail to grow shall be replaced. G. MAINTENANCE AND IRRIGATION: Once the slurry mulch has been Agency s Authorized Representative issues a letter of Preliminary pleted. II mei el r ved from he si a and materials Sha be im d at y emu t t 4. Install all irrigation heads per details. before leaving the site, once a week and/or the last supplied if complying in all other respects and at no applied and allowed to set for one day, the slope shall be Acceptance to the Contractor. By this date, all plant materials shall be replaced at the Contractors expense. The cost of testing workin da of each week. All trash shall be removed 9 y completely from the site. additional cost to the Owner, upon approval of the Owners Representative, L. STAKING: Stakes shall be driven to sufficient depth to hold then be irrigated. There is no set irrigation requirements in gallons per minute. Duration of time and number of gallons )anted all areas re uirin h droseeded lawns shall be tom leted. P 4 9 Y P materials not meeting specifications shall be paid by the F. IRRIGATION HEAD ADJUSTMENTS: the tree rigid. Trees shall be supported by at least two ties see details ( )' to be applied will vary from day to day and system to system Contractor. The Irrigation Contractor shall flush and adjust all irrigation V11. GUARANTEE: 10. All plant materials must have been previously inspected depending on the rate of growth and climatic conditions encountered. As a rule of thumb, the soil surface must be 3.08 PRE -FINAL AND FINAL ACCEPTANCE K. PRE -CONSTRUCTION CONFERENCE: Schedule apre-construction heads for optimum performance and to prevent overspray onto at the nursery by the County Horticultural Department and shall be subject to acceptance as to quality by M PR NIN r n U G. Limbs b a ches canes and r nners which re ire u 9u rimmin r m v t be to leave flush ke t moist a I imes r rin t a I t articula I du the seedin P P y g g ermination ri r xi s (app o 30 day ). A. Conditions for Pre -Final Acceptance of Work at End of Maintenance Period: meeting with the Owners Representative at least seven (7) walks and buildings as much as possible. This shall include A. SCOPE: The entire irrigation system shall be guaranteed the Owner's Representative. g shall e o ed a clean cut with g pe od mately days before beginning work. The purpose of this conference selecting the best degree of arc to fit existing site situations, This includes the by the Contractor as th materials and workmanship, including backfill below fora the trunk r nin on! it e h ner's (p u g y as d ect d by t e Ow Re resen dative). 1. Each plant shall be alive and thriving, showing signs of growth and no is to review any questions the Contractor may have regarding, the work, administrative procedures during construction and also using appropriate radius reduction equipment. settlin of ureas grade period of one 1 ear followin the date of final work. 11. Substitutions will be permitted only as indicated, or if p H. RESEEDING: All bare spots shall be reseeded (sodded, if hydroseed is turf mix), by the Contractor within 45 days days signs of growth and no signs of stress, disease, or any other. project work schedule. acceptance of the If, wiithin one (1) year from date of completion, settling occurs, and adjustments in proof is submitted that any plant specified is not available, a proposal will be considered for the use of N. PLANTING BEDS: Planting beds shall be edged and cultivated providing the lack of cover growth or mulch is not due to 2. All plants not meeting these conditions shall be replaced and a Ninety G. CLOSING OF UNINSPECTED WORK: pipes, valves, and irrigation heads, sod, irrigation devices, the nearest a uivalent size or varied with an a uitable q y q to the line se aratin areas as shown. Beds shall be brou ht P 9 9 � inade uate irri ation or erosion caused b excessive waterin q g Y 9 (90) Day Maintenance Period commenced for such plants. or paving is necessary to bring the system, sod or adjustment of the contract price. to a smooth even surface conforming to established grades after full settlement has occurred. by the Owner. IRRIGATION SPECIFICATIONS The Contractor shall not allow or cause any of his work to be covered or enclosed until it has been inspected, tested and r a paving to the proper ,eve) o. the permvnen� grades, the Contractor, as part of the work under this contract, shall XIV. REPLACEMENTS: can re 3. La a as shall not be 1 09 weed fr nl ss h 0 ee u e of erwise approved by the Agency's Authorized Representative. approved by the authorized Owner's Representative. Should make all adjustments without extra cost of the Owner, 12. Quantities shown on the call outs on the Planting Plon are for the convenience of the Contractor only. IX. GROUND COVER AREAS: I. SCOPE OF WORK• any of his work be enclosed or covered before such including the complete restoration of all damaged Quantities drawn on the plan (whether by circles, dots or A. GENERAL: The Contractor shall immediately replace any and 4. Lawn areas shall have 1009 ermination and establish g mend of turf. inspection and test, he shall uncover the work at his own planting, paving or other improvements of any kind, triangles) are the final authority and shall be furnished A. REFERENCE: Refer to Paragraph V, VI, VII, for finish grading, all materials which for any reason die or are damaged while expense and after it has been inspected, tested, and approved, and installed as drawn. The Owner's Representative shall weed control, and soil preparation. under the Contractor's care. Replacements shall be made B. Corrective Work: Thi .Contractor shall provide a!! labor, tools, machinery, and he shall make all repairs with like materials necessary to B. RESPONSIBILITY: Should any operational difficulties in have the final authority as to location of all plant material. with plant of like kind and size in the same manner as processes necessary to install a complete irrigation system restore all his work and that of other Contractors to its connection with the irrigation system within the specified B. PREPARATION: Prepare specified for the original planting (see guarantee "XVil-D" 1. Work required corrective action or replacement in the judgment of the as shown on the drawings and/or specified herin. When original condition. guarantee period which is in the opinion of the Owner's SOIL the soil as per these specifications for definition of death and replacement). Agency's Authorized Representative shall be performed within ten (10) completed the irrigation system shall be a 100% coverage Representative due to inferior material and/or workman- D. SEED MATERIALS: and the Planting Notes on the Planting Plan. calendar da s after the Pre -Final Review. Y system in total functioning manner. H. BACKFILLING: ship, said difficulties shall be immediately corrected by XV. CLEAN-UP: the Contractor to the satisfaction of the Owner's 1. Seed shall be clean, fresh, new crop seed and shaft be C. GRADING: Areas shall be raked and floated smooth to provide 2. Perform Corrective work and materials replacement in accordance II. GENERAL PRQUIREMENTS: 1. Backfill shall not be laced until the instvlled irri atian P 9 Representative at no additional cost to the Owner; including any and all other damage caused by such the mixture as noted on the Planting Plan. a true and uniform surface. A. GENERAL: After all installation operations have been completed, with the Drawings and Specifications and shall be made by the Contractor at no cost to the Agency. system has been inspected and approved by the Owner's defects. all trash, excess soil, empty plant containers and rubbish A. VERIFICATION OF DIMENSIONS: All scaled dimensions are the Representative. 2. Seed shall be mixed by the dealer and furnished with the dealer's guarantee statement of composition and D. PLANT PITS AND FERTILIZER: Planting pits for ground cover shall be 4" x 4" or adequate to accept material from shall be removed from the property. All scars, ruts or other 3. After corrective work is completed, the Contractor shaft again request approximated. . Before proceeding with any work, Contractor shall carefully check and verify all dimensions. " h sh I e fille wi h minim m f 4 of 2. Trent es al b back d t o u o C. INSTRUCTIONS: After the irrigation system has been percentage of purity which shall be furnished to the plant flats or 4" pots without crushing or deforming the rootball, marks in the area caused by this work shall be repaired and the round left in a neat and order) condition throw hout 9 Y 9 a Pre -Final Review for Pre -Final Acceptance as outlined above. . Spacing of irrigation heads, locations of valves and backflow preventers, artd proposed P.O.C. shall be as indicated on the fine, granular materials to protect the pipe from the completed and the connections made, the Contractor shall instruct the Owner or his re resentative, in the P Owner's Representative. Seed tags shall be delivered to the Owner's Re resentative at the time of installation, P Place a 20-10-5 Agriform 5 gram fertilizer tablet in each individual round cover it. g P the site. Contractor shall ick u all trash resultin from this P P g work no less than each Friday before leaving the site, once a 4. Continue maintenance of all landscaped areas until such time as all drawings. Any deviation from the plans must have the clods or rocks. The remaining excavated dirt can be used as backfill. The Contractor shall not place operation and maintenance of the system. week and/or the last working day each week. All trash shall corrective measures have been completed and accepted by the Agency's Authorized Representative. approval of the Owners Representative. detrimental subsoil or rocks in the top 6" of backfill. E. STAKES: All stakes shall be per details. E. SPACING: Plant according to spacing and in areas indicated on be removed completely from the site. the drawings. Soil shall be firmly tamped around each plant, C. Final Acceptance: Final approval and acceptance of the work will be given B. VERIFICATION OF FINISH GRADE: The Contractor shall inspect the finish the area 3. If settlement occurs and adjustments in i e valves PLANTING SPECIFICATIONS IV. OBSTRUCTIONS BELOW GROUND: and the excess soil removed from the crown, B. TOP SOIL: Excess to soil shall be removed from the site. P when the following conditions, as determined by the Agency's Authorized site and check all grades within work to ensure the soil coverage (as specified) of the irrigation heads, or any other irrigation device, necessary Representative have been met: proper irrigation system to bring the system to proper working order. The A. CONTRACTOR'S RESPONSIBILITY: the Contractor is responsible F. WATERING: Each section of ground cover shall be immediately C. NEATNESS: Leave the sidewalks and street in a neat and pipes. Contractor shall, as a part of his work under this 1. SCOPE OF WORK: for verifying the location of all utility lines and other watered upon completion of planting, and thereafter as clean condition at the end of each working day. 1. At completion of the ninety (90) day maintenance period, and when one contract make all the necessary adjustments without extra underground obstructions so that proper precautions may be required. hundred (100) percent germination and plant establishment is obtained. C. WATER SUPPLY: The Contractor shall verify and be familiar with the source of water su I to the irri ation PP Y g cost to the Owner. A. Furnish all labor, materials and equipment necessary to provide and install plant materials as shown on the drawings taken not to disturb or damage such improvements, In the event of a conflict between such lines and plant locations, G. SPACING FROM EDGE: The first row of ground cover should D. REMOVAL OF TAGS: Remove all tags, labels, nursery stakes and ties from all plants unless otherwise directed, and only 2. All planting areas shall be weed free unless otherwise approved by the system as indicated on the drawings. I. AUTOMATIC CONTROLLER AND VALVES: or as specified herein. the Contractor shall promptly notify the Owners Representative, always be within 6 of the edge of planting area and triangular at the end of all installations. Agency's Authorized Representative. who shall arrange for the relocation of one or the other, spaced. D. PERMITS AND FEES: The Contractor shalt apply and pay for all necessa ermits re uired in the ursuit of his rY q P 1. A 120 void electrical power outlet to the controller B. Work included in this section (items included but not limited Failing to follow this procedure, the Contractor shall at his own expense make any and all repairs for damages resulting XVI. PROTECTION: 3. After final inspection and acceptance by the Agency's Authorized Re resentative. P P shall be provided by others• (Provided the Landscape to): from his work. X. SEASONAL COLOR: work as r uired b the overnin codes. e9 Y 9 9 Contractor has not included the electrical connection in his scope of work) the Irrigation Contractor shall be A. GENERAL: At all times during construction, adequate protection 4. The Agency's Authorized Representative reserves the option to extend E. CARE OF EXISTING BUILDINGS AND STEPS: The Contractor responsible for making the hookup from the outlet to 1. Grade, including mounding, molding and shaping surface V. FINISH GRADING: A. REFERENCE: Refer to Paragraph V, VI, VII, for finish grading, weed control, and soil preparation. shall be provided for all areas a ainst damn a of an kind, until final acce dance l the Owner's Re resentative. Y P y P the maintenance period beyond (90) days specified, if they determined shall be held responsible for the care and preservation the controller. of all planting areas as indicated including the removal further maintenance establishment required by the Contract of all existin buildin s and structures on the ro ert 9 g P P y of existin ve etation unless otherwise s ecified. g g P A, TILING: Till all planting areas as specified herein. Documents. and adjacent premises and contiguous property. Any part of these properties injured, damaged or disturbed 2. All wire from the controller to electric control valves shall be solid co er U.F. 14-600 volt direct burial. # 2. Pre are and till soil in lantin areas includin furnishin P P 9 9 9 After brought B. SOIL PREPARATION: Pre are the soil as er theses ecifications P P P and the Plantin Notes on the Plantin Plan. 9 9 B. RESPONSIBILITY: the Contractor shall be held responsible for the care and preservation of all existing buildings and 5. Approval and acceptance for operation and maintenance will be given in because of his work shall be repaired, replaced or cleared PP Use white for common, blue for lawn systems, black for of all amendments as s ecified. Note that amendments P B. UNIFORM GRADE: tilling, all areas shall be to uniform grade by floating or hand raking. structures the property and adjacent premises. Any part writing by the Agency's Authorized Representative. by the Contractor at his expense. shrub systems and red for moisture sensors; common indicated on the drawings (unless otherwise specified) C. GRADING: Areas shall be raked and floated smooth to provide of them in ured, damn ed ju 1 g of disturbed because of his work control wire. Install in common trench with main line are for bid purposes only. Actual soil amendments will a true and uniform surface. shall be repaired, replaced or cleaned by the Contractor at F. REVIEW OF DRAWINGS: It is the Contractor's responsibility pipe where possible. Tape control wire at 10' O.C. to be based on the soils test results. C. GRADE RELATIONSHIPS: Finish grade of planting areas afther his expense. 3.09 WARRANTY PERIOD AND REPLACEMENTS OF PLANT MATERIALS review irrigation drawings and note any areas main line i e Provide minimum 18" covers a P P g ' application of soil amendments shall be 1" below top of concrete walks and curb rades and 6' below finish floor 9 D. QUALITY OF PLANTS: Plants shall be healthy annual plant XVII. GUARANTEE: A. Specific Requirements: Refer to the following sections: ri believes additional heads or valves are re uired rior b q P 3. Furnish and plant alt plant materials as indicated in the of building or as noted by spot elevations. material in bloom in the size indicated on the drawings. to submitting a bid. If no changes are submitted, the Contractor is responsible for full coverage of equipment 3. Wire connections shall be made with "Scotch -Lok" wire connector seating packs #3576 or Spears "Dri-splice" drawings and specifications. A. SHRUBS: All shrubs shall be uaranteed as to growth and 1 • Lawns and Grasses- Section 02930 as necessa at the Contractors ex ense. rY P with sealant DS 300 or approved equal. 4. Perform all pruning as required. D. SLOPE FROM BUILDINGS: soil areas adjacent to buildin s shall J 9 sloe awa from the buildin at 2% minimum for 10 feet and P Y 9 E. PLANT PITS AND FERTILIZER: Each plant pit for seasonal color " shall be 6" x 6 , or adequate to accept material in the health for a period of ninety 90) days after completion of the specified maintenance period and/or final acceptance by the 2. Trees, Shrubs, and Ground Covers- Section 02950 G. GOVERNING REGULATION: All local, municipal and state 4. There shall be a control wire from each control valve 5. tie shall continue to sloe at a minimum of 1% until water drains P to street or storm system. required size, with one teaspoon of bone meal mixed into the backfill mix (shrub backfill mix should be used, not the Owner or Owner's Representative. lows, rules and regulations governing or relating to running to the controller, and each control valve shall Stake and all plant materials as specified. Agriform plant tablets). any portion of this work and hereby incorporated into be connected to the common ground wire. " B. TREES: Trees shall be guaranteed to live and grow in an and made art of theses ecifications, and their P P 6. Provide for the maintenance of the lanting until i' E. ROCKS OR CLODS: No rocks or clods over 3/4 in diameter F. SPACING: Plant at spacing and in areas indicated on the acceptable upright position for one (1) year after the specified provisions shall be carried out by the Irrigation Contractor. 5. All electrical work shall comply with the applicable codes; acceptance of the job by the Owners Representative. shall be on top of prepared planting beds. drawings. Soil shall be firmly tamped around each plant, maintenance period and/or final acceptance by the Owner or and the excess soil removed from the crown. Owner's Representative. The Owner must provide adequate H. DIAGRAMMATIC DESIGN: The design is diagrammatic. All 7. Dispose of all debris and surplus materials. VI. WEED CONTROL: maintenance to ensure the extended uarontee on trees. 9 pipe, valves, etc., shown within paved areas are for design clarifications only and shall be installed in 6. Install all valves per details, and manufactures recommendations. 8. Clean-up. A. KILLING WEEDS: Contractor shall erminate and dextro 9 Y G. WATERING: Each section of seasonal color shall be immediately watered upon completion of planting, and watered thereafter as C. DEFINITION OF DEATH: Plants which die or lose more than 309 )anted areas where ossible. Never install the backflow P P existing weed seeds before preparing areas for planting. required. of their original leaves shall re replaced. preventers in lawn area; always in shrub areas. MOISTURE SENSOR INSTALLATION (if applicable): Sufficient water shall be applied to cause weed seed to sprout. I. INSTALLATION: All irrigation materials shall be 9. Guarantee. Young weeds shall then be destroyed and removed before they have o ortunit to set seed. PP Y H. SPACING FROM EDGE: the first row of seasonal color should D. REPLACEMENT: The Contractor, within seven (7) days of written notification by the Owner or Owner's Representative, n m e wi h he a hni ues n installed i acco da c t t t c q a d 1. Installations and wiring are to be done by the Contractor in compliance with installation and operating instructions 10. Maintenance. be always within 6" of the edge of the planting area. n I shall remove a d rep ace all guaranteed plant materials which specifications set forth by each respective manufacturer. enclosed with the moisture sensor and included with B. ADDITIONAL REQUIREMENTS: For additional weed killing refer for any reason fail to meet the requirements of this guarantee. All pertinent descriptive literature issued by these manufacturers these special instructions. II. VERIFICATION OF SITE CONDITIONS: to Plantin Notes on the Plantin Plan. 9 g XI. SOD LAWN MATERIALS AND PLANTING (IF APPLICABLE): Replacement shall be made with plant material as indicated or become a part of these specifications after baving been approved specified from the original planting and off such replacement by the authorized Owner's Representative. Such installation ractices shall be followed onl if the directions of the Y 2. The Contractor shall furnish 2 -AWG -UF 14 or lar er # ( g ) A. EXCAVATION: The Contractor shall verif exact locations of y VII. SOIL PREPARATION: A REFERENCE: Refer to Paragraph V, VI, VII, for finish grading, materials shall be guaranteed as specified for the original guaranteed material. irrigation drawings and specifications do not thoroughly and wires from the controller to the moisture sensor control all existing sub-suface utilities (mechanical and electrical) weed control, and soil preparation. completely order the methods or techniques to be followed. stations, locations shown on drawings. Provide additional prior to excavation. Any utilities, A.C. paving, concrete work, A. SOIL REPORT: Before starting soil preparation the Contractor XVIII. MAINTENANCE: Install all equipment and materials as shown per details. 10' expansion lead to each station for finally locating of etc., destroyed or damaged by any work under this contract shall submit a soil report to the Owner and the Owner's B. PREPARATION: Sod area prior to planting shall be rolled sensors. All sensors are to be wired in parallel (see wire shall be repaired or replaced at the Contractor's expense. Representative. If no soil report is submitted it will be lightly and watered to a depth of 6" the day prior to J. SITE PROBLEMS• The Irrigation Contractor shall not color note above). assumed that amendments were not added and the Landscape planting. If any air pockets are found, the area shall be A. SCOPE: After all work indicated on the drawings or herein willfully install the irrigation system as indicated on B. SUB -SURFACE DRAINAGE OR SOIL CONDITIONS: Should sub- Contractor will be requested to give a credit for soil regraded as necessary. Lightly water the area to be planted just prior to planting. specified has been completed, inspected, and approved by the Owner or Owners Representative, the Contractor shall maintain the drawings when it is obvious in the field that there 3. Ametek 6" extension boxes No. 10-170-003 covered by surface drainage or soil conditions be encountered which preparation. all planted areas by means of continuous watering (including are unknown obstructions, grade differences, and/or Ametek green cover No. IVC -10-173-004, or approved would be detrimental to growth or survival of plant material, C. QUALITY: Sod be #1 Grade, monitoring and adjucting irrigation schedule), weeding, rolling, discre ancies in the area dimensions until such conditions P are brought to the attention of the Owner's Representative, ual, shall be installed as detailed. eq 1 the Contractor shall notif the Owner's Re resentative in Y P writing, stating the conditions and submit a proposal covering B. COMPACTED AREAS: Soil areas that are compacted to more shall machine cut at uniform thickness of 5/8" excluding top growth and thatch, weed mowing, spraying, reseeding, edging and/or any other 4. All wiring connections at valve locations shall be water- cost of correction. If the Contractor fails to nodi the than 90% durin site re oration shall be ri ed to a minimum 9 P P PP of 12" prior to beginning soil preparation. These areas shall free and shall be no less than eight months nor more than operations necessary for their care and upkeep for a period of not less than ninety (90) days. At the end of the maintenance III. MATERIALS: proof. Owner's Representative of such conditions, he shall be be defined by the Owners Representative and be billed as an sixteen months old. period, all plvnt materials shall be in a healthy, growing responsible for plant material under the guarantee clause of extra if the unit price is quoted in the bid. condition. Irrigation materials and equipment shall be of type, size and 5. One service unit will be purchased to properly prepare and the specifications. D. TIMING: Installation shall take place within 24 hours after _ . location as noted and indicated on the drawings. Unless permission to change is granted from the Owners Representative; service the moisture sensor. The service unit along with all printed operating instructions are to furnished to the C. DIMENSIONS: All scaled dimensions are approximate. Before C. METHOD OF MIXING: If the slo a is under 2 to 1, the soil P re ration materials should be broadcast uniform) over all P P° Y harvesting. B. WEED CONTROL: All planted areas shall be kept free of debris and shall be weeded at not more that seven (7) day materials are to be new and in perfect condition, No deviations from the specifications shall be allowed. The decision of the Owner by the Contractor at final inspection. proceeding with any work, the Contractor shall carefully check and verify all dimensions and quantities, and shall immediately landscape areas and worked to a depth of 6" by rototiller or other acceptable mechanical means to obtain a uniform blend E. INSTALLATION: Sod shall be laid in a sta ered attern, with gg P tight joints and in the same direction each time. On all intervals. Areas that do not have a re-emer ent weed killer p g shall also be cultivated at not more that seven (7) day Owner's Representative shall be final in determination of the inform the Owners Representative of any discrepancies between in the soil. If the slope is greater than 2 to 1, the slopes sod shall be installed from the bottom up and the newly intervals. quality of materials. 6. Moisture Sensor operating and service instruction and the information on the drawings and the actual conditions, amendments shall be hydraulically applied for areas over 1000 sod should be protected by walking on boards as installer moves operations manual is to be placed in the controller. refraining from doing any work in said areas until given square feet and raked in for small areas. For the soil upward. On slopes, pin the sod down with wooden pe s. No N. INSTALLATION: a roval to do so b the Owners Re resentative. PP Y P amendment bid mix refer to the Planting Notes on the metal staples will be allowed. No sod of less than 18 in C. FERTILIZING: All planted areas shall receive a fertilizer 7. Special depth and placement information to augment Planting Plan. length will be allowed. a Ircation of 20 urtds oer 1,000 ware feet of Gro -Power pp Po A. EXCAVATION: Moisture Sensor Installation and Operation Instruction, III. SOIL AMENDMENTS: 45 days following the beginning of maintenance. Water in is to be provided by the Specified Manufacturer. thoroughly after application. 1. The Contractor shall verify locations of all D. EXTRANEOUS MATERIALS: In additional to the work specified F. JOINTS: Adjoin the sections of sod firmly together. If air existing subsurface utilities (mechanical and p ny electrical rior to excavation. A utilities, A.C. 8. Installation must be inspected and accepted by the 1. Nitrogen stabilized redwood sawdust shall be 100% nitro en stabilized 5% b d wei ht and free of 9 ( Y rY 9 ) above the Contractor shall remove all extraneous materials that are ex osed on the surface and rade to facilitate run-off of P 9 spaces occur between sections of sod they must be filled with sand or the sod relaid. D. CONDITION OF SITE: Durin the maintenance eriod, kee the 9 P P paving, concrete work, plant material, etc., destroyed or Manufacturers Respresentative. shaving particles larger than 1/4" passing through a surface water. ro ect neat and free from debris at all times. Obtain the P j Owner's approval for on-site storage of equipment or damaged by any work under this contract shall be 100 mesh screen. maintenance materials. repaired or replaced at the Contractor's expense, i 1 T !' S C A P e S Landscape Architecture and Planning 3195-8 Airport Loop Drive Costa Mesa, CA 92626 Richard Polhamus, License CA -#'2782 (949) 644-9370 (714) 210-3140 FAX cc C 1 W O �. Z 1-� [-" 4 O ,Q V ' \ Cn v 1 �� F -+-•I N i� 00 cc W o r -i TT��� V1 F�-�I • . Cd r-4 O r--' , t 1 W O O ... kn 00 Cd � � U o nW I� r ^ � � �� � � rH�0 V1 � li ' r --i cc C 1 W O �. Z 1-� [-" 4 O ,Q V ' \ Z r~T �' 3 U cc W o TT��� V1 DYVN CHK DATE 06/09/04 "" * 04_024 of 14 12/22/04