Loading...
HomeMy WebLinkAbout3756-4w M m .00 Avv wk LAT 7--5" L=2700' SCALE IN FEET 40 80 120 54 1 2J+66.64 END LAT. "F CA TCI BASIN '*F- 4 " LOCAL DEPRESSION (CASE B) SCALE: 1 " = 10' nn" W=7', V=4.5' CA TCH BA SIN "'F- 3 LOCAL DEPRESSION (�ASE 01 SCALE: I " = 10' 6 FE - BASIS OF BEARINGS. CONSTRUCTION NOTES. - CONSTRUCT 24" R.C.P. STORM DRAIN (D LOAD SHOWN ON PLAN). THE SOU774 LEG OF AN SCE TOWER ALONG 7HE CL SUMMIT AVE CONSTRUCT 18" R.C.P. STORM DRAIN (D LOAD SHOWN ON PLAN). i 45. 00 CONSTRUCT M.H PER A.P.W.A. STD. PLAN 321-1 (SEE SH T. 5). OF SIERRA A VE CONSTRUCT J.S. PER A.P. W.A. STD. PLAN 331-2 (SEE SHT 6), CONSTRUCT PIPE CLOSURE TYPE 'Y' PER SBCFCD S.P. 176A. 12 CONSTRUCT C.B. PER A.P.W.A. STD. PLAN 300-2 (SEE SHT. 6) AND 313-1 (TO BE CONST ON ST PLANS SEE REF SHT 6) nn" W=7', V=4.5' CA TCH BA SIN "'F- 3 LOCAL DEPRESSION (�ASE 01 SCALE: I " = 10' 6 FE - BASIS OF BEARINGS. BRASS CAP IN THE CONCRE7E BASE OF 77YE BRG. N08959'31'E THE SOU774 LEG OF AN SCE TOWER ALONG 7HE CL SUMMIT AVE J8 1. 00 Q. .34,x' NORTH OF HIGHLAND, 0.2 M/ NEST ilii' i 45. 00 OFSAN SEVAINE RD., 2.65 Mt WEST 16427-1, Y.B. 29617-11, OF SIERRA A VE ML J5.92 ?ENCH MARK.• j 8-17 BASIS OF BEARINGS. BRASS CAP IN THE CONCRE7E BASE OF 77YE BRG. N08959'31'E THE SOU774 LEG OF AN SCE TOWER ALONG 7HE CL SUMMIT AVE Q. .34,x' NORTH OF HIGHLAND, 0.2 M/ NEST AS SHO V ON 7R. NO. OFSAN SEVAINE RD., 2.65 Mt WEST 16427-1, Y.B. 29617-11, OF SIERRA A VE 'LE VA 770N. if 1428.609 J:\126-2004\storm\sd04.dwa. 5/19/2005 12:52:19 PM. MCA