Loading...
HomeMy WebLinkAbout3735-6r U I- W TW ♦♦ice� VJ W r�W V, W Z U r% ■ iti % i 9— §--% w IL i W.- L.iivii i yr vvvr%r\ NOTES: 1. Contractor shall replace and repair exisitng cobble stone edges as needed to transition grade. 2. Contractor shall preserve and protect existing landscape and existing irrigation will be operable during construction phase. 3. Contractor shall provide an allowance in Bid for repairing existing parkway and median landscape along Sierra Ave. and Slover Ave. due to contractor grading and new sidewalk installation. CONSTRUCTION SYMBOLS: iD- - Center Line - Saw Cut Joints in Poured in Place Concrete. — — — — - Expansion Joint. F.O.B. - Face of Building PA - Planting Area EQ - Equal TYP - Typical %� - Align 0 KEYMAP: S I T E CONSTRUCTION LEGEND: NO: ITEM: DESCRIPTION: 1. Cobble Stone Refer to Detail 1, Sheet LC -15 SULLIV�'ep Paving @ Median. r ,L 2. Cobble Stone Refer to Detail 2, Sheet LC 15 IP �P b Paving @ Sidewalk. rF of Cg10- 3. Concrete Mow Curb Refer to Detail 3, Sheet LC -15 4. Redwood Header Refer Detail 4, Sheet LC -15 @ Improved edge. 5. New Sidewalk Refer to Civil Engineer's plan's. 6. Existing Sidewalks Refer to Civil Engineer's plan's. 7. A.D.A. Ramp Refer to Civil Engineers plan's. 8. Street Light Refer to Civil Engineers plan's. 9. Fire Hydrant Refer to Civil Engineers plan's. 10. Catch Basin Refer to Civil Engineer's plan's. 11. Manhole Refer to Civil Engineer's plan's. 12. Traffic Controller Refer to Civil Engineers plan's. 13. Signal Pole Refer to Civil Engineers plan's. 14. Existing Landscape Refer to Civil Engineer's plan's. DATE Lot Boundary 15. Existing curb Refer to Civil Engineers plan's. 16. Existing curb to be removed Refer to Civil Engineer's plan's. NOTES: 1. Contractor shall replace and repair exisitng cobble stone edges as needed to transition grade. 2. Contractor shall preserve and protect existing landscape and existing irrigation will be operable during construction phase. 3. Contractor shall provide an allowance in Bid for repairing existing parkway and median landscape along Sierra Ave. and Slover Ave. due to contractor grading and new sidewalk installation. CONSTRUCTION SYMBOLS: iD- - Center Line - Saw Cut Joints in Poured in Place Concrete. — — — — - Expansion Joint. F.O.B. - Face of Building PA - Planting Area EQ - Equal TYP - Typical %� - Align 0 KEYMAP: S I T E DESIGN STUDIO 14471 CHAMBERS ROAD TUSTIN, CA 92780 Ph: 714.573.2876 Fax: 714.669.4986 SULLIV�'ep r ,L IP �P b rF of Cg10- co ZLU 0 Q >—CID Q Z O LL J O Z U (=> i.r J �. LL- C/3 Z 0- g!V u: Q W LU Uz = U Q W w � m H Z O m J LU O W WM W 0 V� r Cn Z DATE 1ST CITY SUBMITTAL 11/09/04 2ND CITY SUBMITTAL 01/20/05 3RD CITY SUBMITTAL REVISIONS Drawn by. VO Checked by. MS Approved by. MS Scale: 1"=20'—O" Date: Project No.: LEN 401 Project Name: SIERRA BUSINESS CENTER Sheet Title: CONSTRUCTION PLAN SLOVER AVENUE Sheet No: LCMb Wk