Loading...
HomeMy WebLinkAbout3735-50�20 a) fl. d W LEGEND: 1. Tree 2. 2" Deep water basin. 3. Finish grade. 4. Backfill ma, per specifications. 5. Undisturbed soil. 6. Planting tablets, per specifications. 7. Compacted backfill of 1 part 114" dia. pumice, 4 parts backfill mix, thoroughly mixed. 8. 2" approved mulch per specs. 9. Rootball, size varies. Set 1" above grade. Tree Planting Not to Scale ? s SIDEWALK J �- i z� �i 10. Mirafi filter fabric,140N or equal. 11. 4" Dia. 2' deep auger hole filled with pumice surrounded by 'Mirafi' 140N or equal filter fabric. NOTES: 1. Scarify the sides and bottom of planting pit. 2. Prior to plant placement, fill all backfill pits with water and allow to percolate into subsoil. 3. Plant rootball and backfill mix must be thoroughly watered indirectly atter planting. STORM DRAIN/ UNDERGROUND UTILITIES -7 1? SEE NOTE 3 POLE W® �1tE� M X a CO LEGEND: 1. 1 to 15 gal. shrub. 2. 2" deep water basin. 3. Finish grade. 4. Backfill mix, see specifications. 5. Undisturbed soil. 6. Rootball, size varies. Set 1" above grade. 7. 6" deep compacted backfill below rootball unless stated otherwise in the specs or a agronomic report. 8. 2" approved mulch, see specifications. 9. Plant tablets, see specifications. Rhriih PInntinn nPtnil Not to Scale Zo NOTES: 1. Scarify the sides and bottom of planting pit. 2. Prior to plant placement, fill all backfill pits with water and allow to percolate into subsoil. 3. Plant rootball and backfill mix must be thoroughly watered indirectly after planting. LEGEND: 1. Shrub 1 Ground Cover 2. Curb, Wall, Pavement, or edge of bed. Truncated Trianale SDaci Not to Scale Diagram for Hedges 'led spacing SPACING AS NOTED ON PLAN Spacing 6" o.c. 8" o.c. 9" o.c. 10" o.c. 12" o.c. 15" o.c. 18" o.c. 24" o.c. 30" o.c. LEGEND: 36" o.c. 48" o.c. 1. Shrub I Ground Cover 60" o.c. 2. Curb, Wall, Pavement, or edge of bed. 72" o.c. Triangular Spacing Diagram Not to Scale CURB AND GUTTER-/ METER --1 ti \ 0 5, J 4 ra­�4 Q� LL =7-71 5 _ n I DRIVE APPRI CURB AND GUTTER- 5- V �„ MIN MIN SIDEWALK O S.L. 5' 10' NHN MIN UNDERGROUND STRUCTURE Tree CATCH BASIN 2. TRASFORMER VAULT. @ 3" o.c. with filter fabric wrap, surrounded by pumice. -! R Finish grade. •: W Backfill mix, per specifications. J ,o' s NOTES: 7. 10' MIN 4 pat backfill mix, thoroughly mixed. NOTES: 1. TREE SPACING SHALL CONFORM TO PLANS APPROVED BY THE CITY ENGINEER 2. ALL TREES' IN THE R:OX ARE SUBJECT TO--tXE.OF. SIGHT CRITERIA AS APPROVED BY TRAFFIC ENGINEER. 3. AT ALL LOCAL RESIDENTIAL INTERSECTIONS THE FIRST TWO PARKWAY TREES AT ALL APPROACHES TO BE PLACED BEHIND SIDEWALK. 4. MAINTAIN 10 FEET FROM CENTER OF STREET TO EDGE OF ALL UNDERGROUND FACILITIES. 4. MAINTAIN 10 FEET FROM ALL STREET LIGHTS, UTILITIES STRUCTURES AND VALVE BOXES. Qan> Essroy� APPROVED BY:W. CITY OF FONTANA No. 25126 CITY.ENGINEER DATE: TREE PLACEMENT ROBERT W. WEDDLE EXP. 12/31/01 x DRAWN BY: TiMOTHY RASTEDT CIML or choFDATE OF LAST REVISION: STQ. PLAN NO.533 SHT. 1 OF1 Tree Placement Not to Scale Z NJ T SECTION LEGEND: 1. Concrete curb. 2. Finished grade. 3. Sidewalk. 4. Root barrier. 5. Drip line of tree (defined by the minimum spacing distance in the Root Barrier Notes Root Barrier Detail Not to Scale LGl7GINU: 1. Tree tie. See enlargement. 2. 19 long, 2" dia. lodge pole stake. Place 2" min. t 3. Finish grade. 4. Rootball. 5. Staple nail. 6. V.I.T. Cinch Ties (4) per tree. Place below tree yoke. 7. Double crimped clamp. 8. Tree trunk Tree Staking - 24" Box and Smaller Not to Scale PLAN NOTES: A. Position barrier as close to curb or sidewalk as possible. Raised root protectors shall be facing towards the tree. B. Top of barrier shall be 1" above finished grade. C. Length of root barrier shall be equal to the dripline of the particular tree planted as defined by the minimum spacing distance in the root barrier note. D. Apply a mastic sealer to joint between concrete surfaces and root control barrier. E. Installation of panels within soil preparation area will be rejected. F. Install per manufacturer's recommendations. G. For planting, see Tree Planting Details this sheet. ,Z W CD LEGEND: 1. Tree 12. 3" Dia. perforated drainline with 112" holes 2. 2" Deep water basin. @ 3" o.c. with filter fabric wrap, surrounded by pumice. 3. Finish grade. 13. 4" Dia. 2' deep auger hole filled with pumice surrounded by 4. Backfill mix, per specifications. 'Miraff 140N or equal fifler fabric. 5. 6. Undisturbed soil. Planting tablets, per specifications. NOTES: 7. Compacted backfill of 1 part 1/4" dia. pumice, to planting. 4 pat backfill mix, thoroughly mixed. 1. Scarify the sides and bottom of planting pit. 8. 2" approved mulch per specs. 2. Prior to plant placement, fill all backfill pits with water 9. 3" Dia. drain line with 3" cap at grade. and allow to percolate into subsoil. 10. Rootball, size varies. Set 1" above grade. 3. Plant rootball and backfill mix must be thoroughly watered indirectly 11. Mirafi filter fabric, 140N or equal. after planting. 36" Box Tree Planting with Monitor Drain Not to Scale LEGEND: 112 Specified spacing minimum Planting/sf. 4.61 2.60 1.78 1.66 1.15 0.74 0.50 0.28 0.18 0.12 0.07 0.04 0.03 1. 36" box tree or larger. 2. (3) Duckbill Anchors, see specifications for model number. Foresight Products Inc. (800)325-5360 3. (3) Guying cables, galvanized aircord with tumbuckles attached mid cable, see specifications for model no. 4. Tumbuckles, galvanized eye to eye type, see specifications for size. 5. (3) 318" dia. T long UVR plastic guy covers. 6. Galvanized cable clamps. 7. (3)112" dia. rubber collar ties. Tree Guvina Detail - 36" Box and Laraer Not to Scale PLANTING NOTES: I T E 1. Contractor shall be responsible for determining the location of all -underground utilities, pipes and structures using all available information. Contractor shall take 12. Prior to delivery contractor shall submit photos of all representative trees and shrubs sole responsibility for any cost incurred due to damage of said utilities. with specifications on the back of photo indicating height, width and caliper. if a nursery visit is required the contractor will arrange to have the particular 2. Do not willfully proceed with construction as designed when it is obvious that Fax: 714.669.4986 nurseries prepared to show trees. Contractor will install material inferior to the industry standards at his own risk. All photo submittals are to be approved prior unknown obstructions and/or rade differences existing that may not have been g 9 y to planting. known during design. Such conditions shall be immediately brought to the attention of the owner's authorized representative. The contractor shall assume full responsibility for all necessary revision due to failure to give such notification. 13. It is the contractor's responsibility to furnish plant materials free of pests or plant diseases: Pre -selected or'tagged, material must be inspected by the 3. Contractor shall be responsible for any coordination with subcontractors as contractor and certified pest and disease free. It is the contractor's obligation to warranty all plant materials per the specifications. required to accomplish planting operations. 4. Landscape contractor to receive site grade to +0.10. Contractor shall obtain 14. All shrubs lots shall be labeled clearly indicating the species and variety of plant material. letter of grade certification from owner prior to project execution. W 15. Install linear root barriers at all trees per city of Fontana requirements within parkways 5. See specifications for planting requirements, materials, and execution. Final or within 5' of any walking or drivable surface, curbs and buildings.per City of Fontana location of all plant materials shall be subject to the approval of the landscape requirements. UB24-2 Deep Root 15' length both sides available at Deep Root architect. Tel. 1-800.4584668. Install per manufacturer's specifications and recommendations. LU Refer to Detail 9 this sheet. 6. Contractors shall notffy owner's authorized representative 72 hours (weekends not included) prior to commencement of work to coordinate project observation 16. Install 2" dee of A a'Forest Floor' 0-2" shredded bark mulch in all p g ulna g Q schedules. planting beds. (see specifications.) 7. See details and notes for staking methods, plant pit dimensions, and backfill 17. Underplant all.sloping conditions 4:1 or steeper with Gazania. requirements. 18. All trees in turf to have 24" dia. mulch circle. 8. If conflicts arise between size of areas and plans, contractor is to contact landscape architect for resolution. Failure to make such conflicts known to the 1 g Install monitor drains for all trees 36"box and above not on 2:1 slope. pe• OYCCD landscape architect will result in contractor's liability to relocate the material. Refer to Detail 8 this sheet. 9. All plants shall be triangularly spaced unless otherwise indicated. 20. Contractor shall submit, for approval, representative samples fo all trees and shrubs prior to delivery. 10. Install a 6" X 4" (min.) concrete mow curb per Cfij of Fontana standards, to be installed along all turf areas adjacent to landscape planters. 21. Vines shall not be placed directly under windows or in locations which might QL Refer to Detail 3 Sheet LC -15. U conceal building numbers, lights or other visual elements. 11. Muni -trunk indicates (3) trunks (min.) branched from the base of the tree. 22. Jute netting shall be installed on all 2:1 and 3:1 slope conditions. S I T E DESIGN STUDIO 14471 CHAMBERS ROAD TUSTIN, CA 92780 Ph: 714.573.2876 Fax: 714.669.4986 SULL/t�q�'9�Q N N ,9TF OF CAvvF W co a LU Q to C0 Z c LC O udZ OYCCD U co Cn QL 0 U W �C w Q Z / 00-10 1- E CL' Y LU W o0 I QAC) W -' z i LU DATE 1ST CITY SUBMITTAL 11/09/04 2ND CITY SUBMITTAL 01/20/05 3RD CITY SUBMITTAL REVISIONS Drawn by: V0 Checked by: Approved by: MS Dote: Project No.: LEN 401 Project Name: SIERR A BUSINESS CENTER Sheet Title: Planting Detail Sheet No: V