HomeMy WebLinkAbout3735-42G
Contractor shall preserve and protect in place all existing plant�-
_ .rne iais. o�c16r shall replace alfplaht maSena s amag�e .
or destroyed during construction @ his own expense. ---- T.
_-----.. —P
.--/._ ..............._
\ ..�-'`� FXI�TINC� RM/_,........_.-
_..
SAN I A ANA AVL.
�..__ .. _...__................ .� ....... _ .......
.... ...._ ..... _ _ .... ... __..._ _ ____......._ ___...... _____._....... _
_.... __ _......_ -.........._. .......
---.......______ ......._---_.........______...._.._______......._.___-__......._-___ _....____._.......____^ _........_______.......___-^ __......___-____......_____......_____.__..........______........_........ ........_. ........ .........__ ........
_......... ........._.__..—.—.................
I
NOTES:
1. Contractor shall protect in place existing planting and irrigation system
within the common landscape areas during construction. Contractor to provide
snow fencing @ 42" ht at the dripline of all existing trees. Contractor shall not
use existing vegitation as laydown area or to store materials. Irrigation system
shall be in operation at all times during construction. Contractor shall replace all
plant materials dmaged or destroyed during construction at his own expense.
2. Contractor shall verify landscape plan's limit of work line w/ Civil Engineer's
improvement/grading limits. If discrepancy occurs, Contractor shall notify
owner's representative and owner prior to commencing work.
3. Contractor shall conform to City of Fontana tree placement requirements.
See detail 7, sheet LP -15.
4. If Contractor identifies descrepancy between plans and city standards,
contractor shall contact the owner's representative or owner prior to
commencing work.
5. Landscape areas will be maintained by the business association.
W
SEE SHEET LP -1 FOR PLANTING LEGEND
SEE SHEET LP -15 FOR PLANTING NOTES
00
Q-
W
W
W
��W
VJ
W
_Z
J
U
CQ
G
KEYMAP:
I f?
I I ' SANTA ANA AVE.
S T E
W
SLOVER AVE
w
>
z
z
Q
Ph: 714.573.2876 Fax: 714.669.4986
Q :c
ry
0�
wo
z
w
>
F0111 CAL\���
Q
U
�
TECHNOLOG
�
o
z
STREE
00
Q
<
W 0
CL
V
Cn
>- Q
F-
I I ' SANTA ANA AVE.
S T E
DESIGN STUDIO
14471 CHAMBERS ROAD
TUSTIN, CA 92780
Ph: 714.573.2876 Fax: 714.669.4986
O LPW
(T� Dero
F0111 CAL\���
Z w
W 0
V
Cn
>- Q
Z
C
O
W UL
z� Q o
� N
- LL -
C/3 o z
�_
Z z
W LL OLL-
CQ
U
Lu u, �
ULU z
co cc
m
z o
o)
LU o
W W W M
W
U3
DATE
1ST CITY SUBMITTAL
11/09/04 2ND CITY SUBMITTAL
01/20/05 3RD CITY SUBMITTAL
REVISIONS
Drawn by. V0
Checked by. MS
Approved by. MS
(I
Scale: 1"=20'-O"
Date:
Project No.: LEN 401
Project Name:
SIERRA BUSINESS CENTER
Sheet Title:
PLANTING PLAN
SANTA ANA AVENUE
Sheet No:
LP=7