HomeMy WebLinkAbout3735-16CONSTRUCTION NOTES 1. Contractor shall be responsible for consulting with Site Superintendent, appropriate agencies and plans, in order to determine the location of all underground utilities, pipes, and structures. Contractor shall flake sole responsibility for any cost incurred due to damage of said utilities. 2. All property lines and lot lines shall be verified prior to commencing work. 3. See civil engineer's drawings for all finish/grade elevations. 4. Contractor is responsible for identifying the accurate location of property Line, Association boundaries, right-of-way Imes and shall notify the landscape architect of any decrepancies. 5. Contractor shall not willfully proceed with construction as designed when it is obvious that obstructions, existing trees, area discrepancies and/or grade differences exist that may not have been known during design. Such conditions shall be immediately brought to the attention of the owner's authorized representative. The contractor shall assume full responsibility for all necessary revisions due to failure to give such notifications. 6. Contractor shall be responsible for any coordination with subcontractors as required to accomplish all construction operations. All piping, conduit, sleeves, and etc., shall be set in place prior to installation of construction Items. 7. Refer to City of Fontana standard plans and specifications where applicable. 8. Contractor is responsible for replacement of any existing materials that are damaged during construction. 9. All dimensions are form outside face ofaving, walls, curbs and etc., unless otherwise noted on plans. All baselines are from face of building unless otherwise noted. 10. All construction items formed with steel in place and/or compacted subgrade shall be observed and approved prior to installation by the owners authorized representative. 11. These plans are for the purpose of construction of referenced site construction features detailed herein. 12. Refer to the civil engineers drawings for the vertical controls of all construciton features and for the horizontal controls and features not described herein. 13. Refer to the civil engineers drawings and/or the geotechnical report for all details and structural specifications regarding: concrete thickness, presoaking depth, reinforcement, edge conditions, joint requirements, joint spacing and baselsub-base specification Information. 14. Expansion joints shall be placed in all cases where concrete paving abuts builidng or concrete curb. 15. All callouts and dimensions are once typical per sheet. 16. All existing trees and tree preservation areas shall bepprotected during construction with temporary snow fencing as follows. Snow fence protection shall be placed around clusters of trees to be retained. Post shall be metal 'T" post at 8'-0" o.c. Fencing shall be orange fiberglass or similar material. Contractor shall assume full responsibility for damage to existing trees. 17. Contractor shat) stake the locations of all sidewalks, wall or any hardscape for approval by the landscape architect or owner's representative prior to commencing work. 18. Contractor shall layout walks at lest 5' away from existing trees. 19. Sidewalk layout to be adjusted to avoid existing trees. 20. Contractor to layout curvilinear walkways so as to make smooth and continuous transitions. 21. Dimensions taken from road edge are to back of curb (B.O.C.) unless otherwise noted. 22. Contractor shall submit 2'x 2' (or as noted in the specifications), samples, with joints in place of all paving,aving alternates, finishes and colors. All samples shall be approved by owners authorized representative, prior to construction. 23. Paver Submittals - Contractor to provide samples of all paver unit. Type, finish, and color for approval by Landscape Architect. Contractor shall allow adequate time from time of submittal to make adjustments to color and paver type as required. Contractor shall submit all color samples at one time to expedite review and approval process. 24. Precast Concrete Submittals - Contractor to submit shop drawings for all pre -cast concrete items for review and approval by Landscape Architect. 25. Contractor shall install a 6" wide concrete mow curb to separate turf from shrub areas per City standard detail. 2 LEGEND: Space between stones. 1. Cobble may vary 4" to Vas shown from the baseline as shown on the planting plans. 2. River Rock cobble stones; Randomly distributed, with 95% 8"-10" diameter and 5% 12" diameter, 3. Baseline 4. Sidewalk -1" space between rock and back of walk. Cobble Stone @Sidewalk Not to Scale LEGEI 1. 2"x4" redwood header. 2. 2"X2"X18" beveled stakes at 5' o.c.1" below top of wood header and at ends of boards. 3. Adjacent property eAst rig grade. 4. Shrub finish grade @ project planter. 5. Compacted 6. Galvanized nails 3". Redwood Header Not to Scale 1. All wood shall be P.T. Douglas Fir or redwood. 2. Use galvanized nails. 3. Cut off top section of stake after driving into ground. 4. Keep lawn mowed 1" below top of headerboard if adjacent to turf. See detail 'N VADICC LEGEND: Detail A 1. Curb per Civil Engineer's plan 2. Cobble stone 3. 1"Concrete between rock and back of curb. 4. Finish grade/Planting area 5. 90% Min. compacted subgrade or base material per plans and specs. 6. Pea gravel concrete, 6" min. thick bed. Cobble Stone @Median Not to Scale d LEGEND: 1. Rode sizes, unless otherwise specified shall be: Cobblestones: Max 12" to Min 6" with one side flat No more than 50% of any one size. 2. 11"- 1112" Min of cobble thickness shall be embedded in 6" pea gravel concrete bed. 3. A sample area, Min 10 scift shall be approved by the city inspector prior to proceeding with the remaining rock work. 4. Final resting position of all rocks shall be approved by the city inspector, 5. Rodes shall be smooth, rounded, free of objectionable disfigurations and iron content as approved by the city inspector. 6. Concrete shall be class 520-D-2500 4" slump concrete. 7. Where curb elevations vary install drain to low curb. 8. No joint greater than 1" between rocks will be acceptable, 4" filler rocks will be accepted to maintain the 1" joint. 9. Where rock borders turf area, place 1" concrete edge between back of rock and turf. 10. Wire brush all joints after the installation of the rocks. After concrete has set, clean the residue frome surfaces of rocks. 1. Concrete header wtih cold joints at 5' o.c. 2. #3 rebar continuous. 3. Turf 4. Finish grade 5. Native soil 90% compacted. Concrete Mow Curb Not to Scale NOTES Poured concrete header shall be formed on both sides with smooth steel trowel finish on the top and 112" radius edges. Curves shall be uniform. r ZITY OF FONTANA DRAWN BY: SCALE: CONSTRUCTIO;D- TAILS AS SHOWN DESIGNED BY: TEN ARCE6264 DATE: PLA EC NO.0 11/01/04 CHECKED BY: APPROVED _ _ _ ,� rj��� D 35 N0. 16 50 S I T E DESIGN STUDIO 14471 CHAMBERS ROAD TUSTIN, CA 92780 Ph: 714.573.2876 Fax: 714.669.4986 `010 o"- �Q q�F OF CA1.N��� co Z w L V Q C/3Q C/3 O UL- 0 - Of Of U c� OL z CO cn c0 Z H ai a z = Q Q- LL -�¢� LM LU% Q ¢ ~ r -:Of w m LU f- Of LU Q W W M W Cn DATE 1ST CITY SUBMITTAL. 11/09/04 2ND CITY SUBMITTAL 01/20/05 3RD CITY SUBMITTAL REVISIONS Drawn by: VO Checked by. Approved by. MS AS SHOWN Date: Project No.: LEN 401 Project Name: SIERRA BUSINESS CENTER Sheet Title: CONSTRUCTION DETAILS Sheet No: LCM1 5 is