HomeMy WebLinkAbout3735-12W
0
W
W
��W
vJ
W
Z
J
r
U
F -
Q
0
J
MW
W
W
��W
VJ
W
Z
J
U
Q
CONSTRUCTION LEGEND:
NO: ITEM: DESCRIPTION:
1.
Cobble Stone
Refer to Detail 1, Sheet LC -15
Paving @ Median.
2.
Cobble Stone
Refer to Detail 2, Sheet LC 15
Paving @ Sidewalk.
3.
Concrete Mow Curb
Refer to Detail 3, Sheet LC -15
4.
Redwood Header
Refer Detail 4, Sheet LC -15
@ Improved edge.
5.
New Sidewalk
Refer to Civil Engineer's plan's.
6.
Existing Sidewalks
Refer to Civil Engineer's plan's.
7.
A.D.A. Ramp
Refer to Civil Engineer's plan's.
8.
Street Light
Refer to Civil Engineer's plan's.
9.
Fire Hydrant
Refer to Civil Engineer's plan's.
10.
Catch Basin
Refer to Civil Engineer's plan's.
NOTES:
CONSTRUCTION SYMBOLS:
(� - Center Line
11.
Manhole
Refer to Civil Engineer's plan's.
1. Contractor shall replace and repair exisitng cobble stone edges
- Saw Cut Joints in Poured in Place Concrete.
-- 12.
Traffic Controller
Refer to Civil Engineer's plan's.
as needed to transition grade.
- — — - - Expansion Joint.
13.
Signal Pole
Refer to Civil Engineer's plan's.
2. Contractor shall reserve and protect existing landscape and existing
p p g g
F.0.6. - Face of Building
PA - Planting Area
irrigation will be operable during construction phase.
EQ -Equal
14.
Existing Landscape
Lot Boundary
Refer to Civil Engineer's plan's.
3. Contractor shall provide an allowance in Bid for repairing existing
TYP - Typical
parkway and median landscape along Sierra Ave. and Slover Ave. due to
- Align
15.
Existing curb
Refer to Civil Engineer's plan's.
contractor grading and new sidewalk installation.
16.
Existing curb to be removed
Refer to Civil Engineer's plan's.
S I T E
DESIGN STUDIO
14471 CHAMBERS ROAD
TUSTIN, CA 92780
Ph: 714.573.2876 Fax: 714.669.4986
� ,�v.��v u • Q
IPA
�Dole
�
q�F of aAOF-
UJ
Z o
W
0
V Q
� Cn a
Cn
Q z
0
UL
MMEMMEM -< a
Z LV V N
V J j Q CO
Z �
m O
W 0- tt
V OC co C'o m
r m
Dof J 0 o a-
W LU Lsa w
D co vc� z
Cn
DATE
1ST CITY SUBMITTAL
11/09/04 2ND CITY SUBMITTAL
01/20/05 3RD CITY SUBMITTAL
REVISIONS
Drawn by. VO
Checked by. MS
Approved by. MS
Scale: 1"=20'—O"
Date:
Project No.: LEN 401
Project Name:
SIERRA BUSINESS CENTER
Sheet Title:
CONSTRUCTION PLAN
TECHNOLOGY STREET
Sheet No:
L CM 1 1
M