HomeMy WebLinkAbout3733-1At CONDUCTOR TABLE
AWG.
CIRCUIT OR
RUNS
LUMINAIRE
OT
USED
E: END PRE–EMPTION
S.N.S.
PLACEMENT
PHASE 1
PHASE 2
PHASE 3
PHASE 4
SIC.
LUM.
H.P.S.V.
NOT
USED
POLE
1
2
3
4
5
6 A
7
8
9
0
1
POLEco
B
6
E
TV -1—T
SP--1—CS
—
4'
2
26A-4-80
35
40
1 15
250W
B
4
N
MAS—MAS
SV -1—T
SP-1—CS
_
Ceres Ave
—
4'
3
POLE
10'
B
4
N
TV -1—T
SP-1—CS
—
4'
4
24A-4-80
35'
25'
15'
250W
B
2
W
MAS
SV -1-T
SP-1—CS
o
POLE
4'
5
1—A
10'
B
2
W
-/-
TV -1 —T
SP-1—CS
—
4'
RELOCATE
7
6
26A-4-80
35'
45'
15'
250W
0
Q
POLE
S
MAS—MAS
SV -1—T
SP-1—CS
Ceres Ave
—
4'
7
1—A
10'
B
8
S
TV -1—T
SP-1—CS
—
4'
RELOCATE
7
c
POLE
35'
25'
15
250W
B
6
E
MAS
SV -1—T
SP-1—CS
Sierra Ave
I
RELOCATE
7
9
PPB
7'
B
E
POLE
REMOVE
6
10
26A-4-80
35'
40'
15'
-/-
MAS—MAS
SV -1—T
Q
u
POLE
_/_
_/_
_/_
_/_
1/1
1/1
1/1
1/1
1/1
1/1
-/-
-f-
n
POLE
-/_
-/-
-/-
-/-
1 /1
1/1
1/1
1/1
1/1
1/1
1/1
-/-
I
POLE
POLE 10
-/-
-/-
-/-
-/-
-/1
-/1
-/1
-/1
-/1
-/1
TOTAL
10
ILUM11
2
1 2
12
2
2
2
2
2
2
-
VIDEO
VIDEO CABLE
-
-
-
I A.
-
3
3
2
2
1
1
-
DET.
CAMERA POWER
4
3
3
2
2
1
1
OPTICOM CABLE
-
1 j
1
3
3
2
2
1
1
1
-
CONDUIT SIZE
(IN INCHES)
3
2-3
4
4
4
3
3
3
3
3
2
3
E
N
N
N
N
E
E
E
E
N
N
E
E=EXISTING CONDUIT TO REMAIN NOTE:
N=NEW CONDUIT INSTALL 2 - 3" IN RUN 2. ONE TO
- ALL CONDUCTORS ARE NEW. BE USED FOR SIGNAL WIRE, 1 TO BE
GENE"L NOTES:- USED FOR FIBER
1. TRAFFIC SIGNAL, SIGNING AND STRIPING, AND LIGHTING SHALL CONFORM TO THESE
PLANS, THE SPECIAL PROVISIONS, THE CITY OF FONTANA STANDARD DETAILS, THE
STATE OF CALIFORNIA STANDARD SPECIFICATIONS SECTION 86 AND STANDARD
PLANS (DATE JULY 2002), THE 2003 MUTCD AND THE 2003 MUTCD CALIFORNIA
SUPPLEMENT
2. LOCATION OF ALL UNDERGROUND FACILITIES ARE APPROXIMATE. THE CONTRACTOR
SHALL POTHOLE TO DETERMINE THE EXACT LOCATIONS AND VERIFY ALL CONDITIONS
ON THE JOB SITE. HAND DIG FOUNDATINS UNTIL CLEAR OF ANY OBSTRUCTIONS.
PHONE UNDERGROUND SERVICE ALERT AT (800) 227-2600, TWO (2) WORKING
DAYS BEFORE DIGGING.
3. ALL PULLBOXES SHALL BE No. 6 AND CONDUIT SHALL BE 2" RIGID METAL UNLESS
OTHERWISE SHOWN.
4. CONTRACTOR SHALL MAKE APPLICATION FOR ELECTRIC SERVICE AND SCHEDULING
WITH SOUTHERN CALIFORNIA EDISON
COMPANY WELL IN ADVANCE OF NEED.
5. CONTRACTOR SHALL OBTAINPPROV
A AL FROM THE ENGINEER FOR EXACT
EQUIPMENT LOCATIONS PRIOR TO FINAL PLACEMENT.
6, ALL REQUIRED CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF
FONTANA ENGINEERING DIVISION PRIOR TO COMMENCEMENT OF WORK.
7. CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS, AND
SIDEWALK AFFECTED BY THE CONSTRUCTION TO THE SATISFACTION OF THE
ENGINEER.
8. CONTROLLER CABINET SHALL NOT BE SUBJECTED TO WATER FROM SPRINKLERS,
MODIFY SPRINKERS SYSTEMS IF NECESSARY.
9. THE ALIGNMENT OF INTERCONNECT DUCTS SHALL BE AS STRAIGHT AS POSSIBLE.
HOWEVER, WHEN CHANGES IN ALIGNMENT ARE NECESSARY, SWEEPS SHALL HAVE
MINIMUM RADIUS OF 10 FEET.
10. ALL VEHICLE INDICATIONS SHALL BE 12" AND HAVE L.E.D. SIGNAL MODULES. ALL
PEDESTRIAN HEADS SHALL HAVE L.E.D. PEDESTRIAN MODULES.
11. ANY EXISTING TRAFFIC SIGNALS AND LIGHTING SHALL REMAIN IN OPERATION UNTIL
REPLACED WITH NEW CONSTRUCTION.
12. CONTRACTOR TO FURNISH ALL EQUIPMENT, MATERIALS, AND HARDWARE TO
CONSTRUCT THE TRAFFIC SIGNAL AND LIGHTING MODIFICATIONS AS SHOWN ON THE
PLANS, EXCEPT AS NOTED CITY FURNISHED OR LISTED AS CITY PROVIDED IN THE
SPECIAL PROVISIONS.
13. CONTRACTOR SHALL REFER TO THE CITY TRAFFIC ENGINEER IN THE EVENT OF A
CONFLICT OR POTENTIAL CONFLICT WITH THESE PLANS AND,OR SPECIFICATIONS FOR
THIS PROJECT.
14. WHERE TRAFFIC SIGNAL STREET CROSSING CONDUIT ARE NOT INSTALLED USING THE
BORING METHOD, TRENCH REPAIRS SHALL BE PER SPECIAL PROVISIONS, SECTION E.
RAILROAD PRE—EMPTION SEQUENCE
NORMAL PHASE OPERATION
_ QLA
OLA/OLC OUT, FOLLOWED BY
YELLOW AND ALL–RED
DIAGRAM
STANDARD
PRE–EMPTION DWELL LIMITED SERVICE
LUMINAIRE
OT
USED
E: END PRE–EMPTION
OLA/OLC TRACK CLEARANCE (IF ACTIVE)
RESUME NORMAL SIGNAL OPERATION
BEGINNING WITH PHASES 2, 6 & OLA
WHEN PRE–EMPTION STARTS, IF THE SIGNAL IS SERVING PHASE 1/5 OR
PHASE 4/8 THEN THE ACTIVE PHASE BECOMES YELLOW FOLLOWED BY
RED FOR ALL PHASES.
WHEN PRE–EMPTION STARTS, IF THE SIGNAL IS SERVING PHASES 2 AND 6, THEN
PHASE 6 CYCLES OUT WHILE PHASE 2 REMAINS GREEN.
Q TRACK CLEARANCE PHASE (PHASE 2 GREEN BEGINS, FOLLOWED BY YELLOW FOR
PHASE 2, WHILE ALL OTHER PHASES REMAIN SOLID RED.
PRE–EMPTION DWELL, ALL PHASES FLASHING RED.
Q AT END OF PRE–EMPTION, A SOLID RED INTERVAL FOR ALL PHASES FOLLOWED BY
NORMAL PHASE SEQUENCE BEGINNING WITH PHASE 2 AND 6.
BARRIER
PHASE
DIAGRAM
STANDARD
MASTARMS
LUMINAIRE
OT
USED
SIGNAL MOUNTING
S.N.S.
PLACEMENT
PHASE 1
PHASE 2
PHASE 3
PHASE 4
SIC.
LUM.
H.P.S.V.
NOT
USED
PHASE
QUAD
VEHICLE
PALE
PED.
PHASE 5
PHASE 6
PHASE 7
PHASE 8
1
is POLE SCHEDULE
L
STANDARD
MASTARMS
LUMINAIRE
PED PUSH BT.
SIGNAL MOUNTING
S.N.S.
PLACEMENT
REMARKS
c
TYPE
HT.
SIC.
LUM.
H.P.S.V.
TYPE
PHASE
QUAD
VEHICLE
PALE
PED.
MESSAGE
A
H
1
1—A
10'
B
6
E
TV -1—T
SP--1—CS
—
4'
2
26A-4-80
35
40
1 15
250W
B
4
N
MAS—MAS
SV -1—T
SP-1—CS
_
Ceres Ave
—
4'
3
1—A
10'
B
4
N
TV -1—T
SP-1—CS
—
4'
4
24A-4-80
35'
25'
15'
250W
B
2
W
MAS
SV -1-T
SP-1—CS
Sierra Ave
—
4'
5
1—A
10'
B
2
W
TV -1 —T
SP-1—CS
—
4'
RELOCATE
7
6
26A-4-80
35'
45'
15'
250W
B
8
S
MAS—MAS
SV -1—T
SP-1—CS
Ceres Ave
—
4'
7
1—A
10'
B
8
S
TV -1—T
SP-1—CS
—
4'
RELOCATE
7
819A-4-80
35'
25'
15
250W
B
6
E
MAS
SV -1—T
SP-1—CS
Sierra Ave
4'
RELOCATE
7
9
PPB
7'
B
E
REMOVE
6
10
26A-4-80
35'
40'
15'
250W
MAS—MAS
SV -1—T
ALL EQUIHMENI IS EXISTING R = A� 5hIJVVN
I
l
w
Ln
o0._ 0
40' °- 1w
5 2 a
:".cn
25' RL < SCALE: ® w I �--
1 � b-
CB0 Lo or
w
AB ( V) (n 0
w"i-j ' EX PULLBOX~ I
�CONDUIT TO REMAIN 12AVENUE
15
EX P48
EX FIBER LINE
no
..8
T8._,._
EX R/W 05
�.
– -- -- — 04�' �a- 17 PROPOSED CURB
,.-- H I
>�6P 7 19 OLA
EX C G
rr
c:a
i�
'-n t
JOINT H TRENC
13
tt
ca
cp
A611 01
II
EX C/G
EX R/W 04P
2 - #10
LIGHTING
2 - #6(SERVICE)
1 - #8(G.F.C.i.) 4
�I
x
w
�6 I I I
6 RL ` 8 100 I AB
16 7 ( i�
14,
C/L I 1 OLA
--- .__. _
6 I JOINT TRENCH
OLA
Cll_
_.
k
02
11
04
02
r -1 r
mail
®® ®® PROPOSED CURB 1
SCE PULLBOX/NEW Ex R/W
RLQ
7 �
32' 32' 1 cy
3t UJ
x 0
I C) =.
40' 43' �; I w
�J RELOCATE EXISTING TYPE 90 CONTROLLER EQUIPMENT PACKAGE INCLUDING TYPE "R" CABINET, SOLO
I_ J PRO VIDEO DETECTION, BATTERY BACKUP, AND APPURTENANT EQUIPMENT. CONTROLLER CABINET
AND FOUNDATION SHALL BE INSTALLED PER CITY STANDARD DRAWING 4004. CONTRACTOR SHALL
FURNISH AND INSTALL ANY ADDITIONAL ELECTRONIC EQUIPMENT REQUIRED TO PROVIDE THE SIGNAL
OPERATION AS SHOWN ON THE PLAN.
EflRELOCATE EXISTING TYPE III -BF SERVICE EQUIPMENT ENCLOSURE PER CITY OF FONTANA AND
SOUTHERN CALIFORNIA EDISON COMPANY REQUIREMENTS.
0 FURNISH AND INSTALL 3" PVC CONDUIT WITH 1/4" POLY PULL ROPE PER SCE REQUIREMENTS.
COORDINATE SERVICE WITH SCE (RON CARDENAS 310-292-6419)
INSTALL RELOCATED TYPE 90 CONTROLLER AND TYPE III -BF SERVICE EQUIPMENT ENCLOSURE
REMOVE EXISTING CONCRETE PAD AND FOUNDATIONS COMPLETELY . BACKFILL TO 95% COMPACTION
POLE 9 TO BE REMOVED AND SALVAGED TO CITY YARD. REMOVE FOUNDATION COMPLETELY,
BACKFILL TO 95% COMPACTION
(� REMOVE/RELOCATE EXISTING SIGNAL POLE COMPLETE. FURNISH & INSTALL NEW FOUNDATIONS.
L REMOVE ABANDONED FOUNDATION COMPLETELY, BACKFILL TO 95% COMPACTION
17 FURNISH AND INSTALL STD SIZE SIGN & POST PER 2003 CALIFORNIA MUTCD
FURNISH AND INSTALL 3 AND 4 PVC CONDUIT IN JOINT TRENCH, EACH WITH 1/4" POLY PULL SUPPLEMENT
ROPE PER SCE REQUIREMENTS. 3"C TO BE USED FOR SIGNAL SERVICE, 4"C TO BE USED FOR
SENIOR HOUSING SERVICE. COORDINATE SIGNAL SERVICE WITH SCE (RON CARDENAS 310-292-6419) 18 APPLY THERMOPLASTIC STRIPE, DETAIL 38 PER CALTRANS STD PLAN A20D
ROCK WHEEL METHOD REQUIRED
FURNISH AND INSTALL 6PR #19 SIC FROM NEW CONTROLLER LOCATION TO NEW P48 PULLBOX ON 19 APPLY THERMOPLASTIC TYPE IV TURN ARROW PER CALTRANS STD PLAN
NORTHWEST QUADRANT. SIC TO RUN IN SIGNAL RUNS 6,7,8,9,10 A24A
10 SIGNAL CONDUCTORS TO BE REMOVED & CONDUIT TO BE USED FOR FIBER CROSSING (SEE NOTE 15)
11 FURNISH & INSTALL 2"C, INSTALL 1 SIC, 6 PR #19 FROM RAILROAD HOUSE TO NEW CONTROLLER NOTE: POTHOLING OF ALL AREAS WHERE THERE ARE UTILITY AND/OR DRAINAGE FACILITIES
LOCATION. SIC IS EXISTING IN CONDUIT ON WEST SIDE OF SIERRA REUSE. SEE NOTE 12 IS REQUIRED TO VERIFY THE NECESSARY VERTICAL_ AND HORIZONTAL CLEARANCE FOR
' ( ) INSTALLATION OF ALL UNDERGROUND CONSTRUCTION.
12 REMOVE EX SIC FROM CONDUIT AND REINSTALL IN NEW 2" CONDUIT ON EAST SIDE OF SIERRA
AVE FROM EX RAILROAD HOUSE TO NEW CONTROLLER LOCATION. SIC WILL NOT BE C
SPLICED, EX CONDUIT TO BE USED FOR FIBER INSTALLATION (SEE NOTE 15) 10111111110 - IMAGE SENSOR UNIT. - UNI --DIRECTIONAL, SINGLE CHANNEL OPTICAL DETECTOR.
13 FURNISH AND INSTALL 2 -3" CONDUIT IN JOINT TRENCH, 1-3"C TO BE USED FOR SIGNAL
OPERATION ACCORDING TO CONDUCTOR SCHEDULE, RUN 2. 1 -3"C TO BE USED FOR FIBER. CB INSTALL CONDUIT IN EXISTING PULLBOX
(SEE NOTE 15). ROCK WHEEL METHOD REQUIRED
RL RELOCATE EQUIPMENT
14 POLE 6 BASEPLATE ELEVATION TO BE WITHIN .2' OF FINISHED SIDEWALK GRADE.
REMOVE EX FIBER FROM CONTROLLER, COIL TO EX P48. REINSTALL TO NEW CONTROLLER LOCATION AB ABANDON, IF APPLIED TO CONDUIT, REMOVE CONDUCTORS
15 USING EX 2"C, & NEW 3"C ON SOUTH LEG OF SIERRA. (SEE NOTES 12 & 13)
ERI EQUIPMENT OR MATERIALS TO BE REMOVED AND BECOME PROPERTY OF THE CONTRACTOR
16 INSTALL NEW CROSSWALK IN THERMOPLASTIC PER CITY STD 1006. REMOVE CONFLICTING AUTOCAD FILENAME: SIERRA.CERES.MOD\SierraCeresModPrint
CROSSWALK/STRIPING PER SPECIAL PROVISIONS, SECTION E -V. ------ Q-,�ZZ 01 E-0MA A„1.n„,r7