HomeMy WebLinkAbout3719-319
MIN
Wit..
�m
aim
INDICATES PAVEMENT
INDICATES REMOVE EXISTING A.C. PAVEMENT
INDICATES
';
'. A.C.
PAVEMENT
BASIS OF BEARING IS THE CENTERLINE OF BEECH AVENUE AS SHOWN ON TRACT MAP
NO. 16477, RECORDED IN BOOK 298 OF MAPS, PAGES 59-62 INCLUSIVE
it
BENCHMARK
PREPARED FOR:
YOUNG HOMES CITY OF FONTANA BENCHMARK NO. 361,
10370 TRADEMARK STREET RAILROAD SPIKE IN NORTH FACE OF POWER POLE
RANCHO CUCAMONGA NO, 1536697E AT THE SOUTHWEST CORNER OF
CA 91730 SULTANA AVENUE AND BASELINE AVENUE.
(909) 291--7600
ELEVATION.- 1365.01
CURVE TABLE
Prepared B.
a4
ALLA
t� y
v
{ ENGINEERING
,
Civil Engineering -
Land d Planning
6253 Sierra Avenue
'ontana, California 92335
(909) 356-1815 Pax (909) 356-1795
,.
D. Date
6/30/2005)
NOTE:
;4' r , "�`
A, 4'AND ELEVATION PRIOR TO STARTOF CONSTRUCTION.
CONSTRUCTION NOTES
0>— CONSTRUCT .5" AC PAVEMENT (MIN) OVER 12" OF 957. COMPACTED NATIVE SOIL
(SEE GENERAL NOTE 31 & 32)
2 CONSTRUCT 6" PCC CURD & GUTTER PER CITY STD. DWG. NO. 1003
3 CONSTRUCT 4" PCC SIDEWALK PER CITY STD. DWG, NO. 1015, WIDTH & TYPE AS SHOWN ON PLAN
4 CONSTRUCT CURD' ACCESS RAMP PER CITY STD. DWG. NO. 1006
7 SAW UT & REMOVE EXISTING AC PAVEMENT TO A CLEAN STRAIGHT LINE (1® MIN.)
6 GRIND EXISTING PAVEMENT FOR SMOOTH TRANSITION AS SHOWN ON PIAN AND DETAIL ON SHT 5
10 INSTALL 22000 LUMEN HPV (200 WATT, 20) LUMINAIRE
f
Filename: M:\dwg\15921\.STREET\LSTR03.dwg
Prepared B.
a4
ALLA
t� y
v
{ ENGINEERING
,
Civil Engineering -
Land d Planning
6253 Sierra Avenue
'ontana, California 92335
(909) 356-1815 Pax (909) 356-1795
,.
D. Date
6/30/2005)
NOTE:
;4' r , "�`
A, 4'AND ELEVATION PRIOR TO STARTOF CONSTRUCTION.
CONSTRUCTION NOTES
0>— CONSTRUCT .5" AC PAVEMENT (MIN) OVER 12" OF 957. COMPACTED NATIVE SOIL
(SEE GENERAL NOTE 31 & 32)
2 CONSTRUCT 6" PCC CURD & GUTTER PER CITY STD. DWG. NO. 1003
3 CONSTRUCT 4" PCC SIDEWALK PER CITY STD. DWG, NO. 1015, WIDTH & TYPE AS SHOWN ON PLAN
4 CONSTRUCT CURD' ACCESS RAMP PER CITY STD. DWG. NO. 1006
7 SAW UT & REMOVE EXISTING AC PAVEMENT TO A CLEAN STRAIGHT LINE (1® MIN.)
6 GRIND EXISTING PAVEMENT FOR SMOOTH TRANSITION AS SHOWN ON PIAN AND DETAIL ON SHT 5
10 INSTALL 22000 LUMEN HPV (200 WATT, 20) LUMINAIRE
f
Filename: M:\dwg\15921\.STREET\LSTR03.dwg