Loading...
HomeMy WebLinkAbout3681-1Sheet Index Title Sheet L=1 Irrigation Plan L=2 Vicinity Map duo not to scale North Irrigation Plan L=3 Irrigation Plan L=4 Irrigation Plan L=5 CITY OF FONTANA REQUIRED NOTES: Irrigation Plan L=6 INSPECTIONS: Planting Plan L=7 1. IT IS THE LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE NG 'S 4HOURS PRIORENGINEETO DESRIIRED INSPECTIONDIVISIONLANDSCAPE OF AN ITEM ATINSPECTOR 350-6633. (909) Planting Plan L=8 2. PRIOR TO RELEASE OF UTILITIES OR MAINTENANCE PERIOD COMMENCEMENT THE FOLLOWING INSPECTIONS ARE REQUIRED: Planting Plan L=9 PRE CONSTRUCTION MEETING Planting Plan L=1 0 INSPECTION OF IRRIGATION SYSTEM IN OPEN TRENCH CONDITION (PRIOR TO BACKFILL). MAINLINE PRESSURE TEST @ 150 P.S.I. FOR A THREE (3) HOUR CONTINUOUS PERIOD. Planting Plan `ml I IRRIGATION COVERAGE TESTS INCLUDING INITIAL AND FINAL TESTS. Irrigation Details L=12 FINISH GRADE PRIOR TO PLANTING. Planting Details LA3 PLANT MATERIALS PRIOR TO PLANTING AND SOIL PREPARATION. Irrigation Specifications Lm14 PLANTING, INCLUDING STREET TREES. CONTACT THE PARKS PLANNING AND LANDSCAPE DEVELOPMENT SECTION, ENGINEERING DIVISION, FOR SPECIES AND FINAL Planting Specifications Lm15 LOCATIONS. COMPLIANCE WITH APPROVED PLANS. Site Plan Scale: 111=160North 3. THE OWNER'S REPRESENTATIVE AND LANDSCAPE CONTRACTOR SHALL-aE—PRESENT FRWY ?CPE L OF' Cp"05 Sheet Description: Title Sheet .. . ... ............ ----- Date: July 26, 2004 P,F*-A Job No.: 04-25 Drawn by: LKD JRO RCV1510115: duo r= CD CO CV3 CL iz r= �r Cp r CL LL. j Sheet Description: Title Sheet .. . ... ............ ----- Date: July 26, 2004 P,F*-A Job No.: 04-25 Drawn by: LKD JRO RCV1510115: