HomeMy WebLinkAbout3681-1Sheet Index
Title Sheet
L=1
Irrigation
Plan
L=2
Vicinity Map
duo
not to scale North
Irrigation
Plan
L=3
Irrigation
Plan
L=4
Irrigation
Plan
L=5
CITY OF FONTANA REQUIRED NOTES:
Irrigation
Plan
L=6
INSPECTIONS:
Planting
Plan
L=7
1. IT IS THE LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO CONTACT
THE NG 'S 4HOURS
PRIORENGINEETO DESRIIRED INSPECTIONDIVISIONLANDSCAPE OF AN ITEM ATINSPECTOR 350-6633. (909)
Planting
Plan
L=8
2. PRIOR TO RELEASE OF UTILITIES OR MAINTENANCE PERIOD
COMMENCEMENT THE FOLLOWING INSPECTIONS ARE REQUIRED:
Planting
Plan
L=9
PRE CONSTRUCTION MEETING
Planting
Plan
L=1 0
INSPECTION OF IRRIGATION SYSTEM IN OPEN TRENCH
CONDITION (PRIOR TO BACKFILL). MAINLINE PRESSURE TEST
@ 150 P.S.I. FOR A THREE (3) HOUR CONTINUOUS PERIOD.
Planting
Plan
`ml I
IRRIGATION COVERAGE TESTS INCLUDING INITIAL AND
FINAL TESTS.
Irrigation
Details
L=12
FINISH GRADE PRIOR TO PLANTING.
Planting
Details
LA3
PLANT MATERIALS PRIOR TO PLANTING AND SOIL
PREPARATION.
Irrigation
Specifications
Lm14
PLANTING, INCLUDING STREET TREES. CONTACT THE PARKS
PLANNING AND LANDSCAPE DEVELOPMENT SECTION,
ENGINEERING DIVISION, FOR SPECIES AND FINAL
Planting
Specifications
Lm15
LOCATIONS.
COMPLIANCE WITH APPROVED PLANS.
Site Plan
Scale: 111=160North
3. THE OWNER'S REPRESENTATIVE AND LANDSCAPE CONTRACTOR
SHALL-aE—PRESENT
FRWY
?CPE L
OF' Cp"05
Sheet Description:
Title Sheet
.. . ... ............
-----
Date: July 26, 2004
P,F*-A Job No.: 04-25
Drawn by: LKD JRO
RCV1510115:
duo
r=
CD
CO
CV3
CL
iz
r=
�r
Cp
r
CL
LL.
j
Sheet Description:
Title Sheet
.. . ... ............
-----
Date: July 26, 2004
P,F*-A Job No.: 04-25
Drawn by: LKD JRO
RCV1510115: