Loading...
HomeMy WebLinkAbout3587-1CONDUCTOR TABLE L CIRCUIT OR RUNS LUMINAIRE PED PUSH BT. SIGNAL MOUNTING S.N.S. PLACFMFNT REMARK C TYPE HT. SIG. IUM, H.P.S.V. AWG. PHASE QUAD POLELu 1 2 3 4 5 6 7 S 9 1 11 1 B POLE E — TV -2—T SP-1—CS — 10.8' 2.8' 2 24-4-80 30 35' 15' 1 25OW B 4 N MAT, MAS SV -1—T SP-1—CS Slaver Ave 11.5 3.1' 3 1—A 10 POLE — — B 4 N — TV -2—T SP-1—CS — 10.8' 2.8' 4 24-4-80 30' 35' 15' 250W B 2 W MAT, MAS SV -1—T SP-1—CS Empire Center 11.2' o POLE 5 1—A 10 — — — B 2 W — TV -2—T SP-1—CS — 8.2' 2.9' ----___- 6 24-4-80 30' 35' 15' 250W B 8 S MAS SV --1—T POLE Slover Ave 11.6' 3.0' 7 1—A 10 — — — B 8 c� — TV -2—T SP-1—CS — 11.1' 2.9' - -- 8 29-5-80 3O' S0' 15' 250W 0 POLE � E MAT, MAS, MAS SV -1—T SP-1—CS Empire Center Blvd 11.5' 2.6' I N POLE POLE POLE 1 f1 1/1 1/1 1/1 1/1 TOTAL 1/1 2/2 2/2 3/3 4/4 4/4 4/4 4/4 3/3 2/2 2/2 1/1 10 ILUMINAIRE 1- 2 2 2 2 2 2 2 2 2 2 2 OPTICOM CABLE - 1 1 1 1 1 1 2 2 2 2 2 1 1 1 PHASE 1 - - - - - - - 2 2 2 - - PHASE 2 - - - 2 2 2 2 - - - - - PHASE 3 - - - - 2 2 - - - - - - PHASE 4 4 4 4 4 4 4 4 - - - - - DLC PHASE 5 - - 2 2 2 2 2 - - - - - PHASE 6 - - - - - - - 2 2 2 2 - PHASE 7 2 2 2 2 2 2 2 - - - - PHASE 8 1 - - - - - - 1 - - - - _ TOTAL 6 6 8 10 12 12 9 4 4 1 4 2 - CONDUIT SIZE 3 1 2 3 1 2" 3 1 2 3 1 2 3 1 2" 3 1 2 3 1 2" 31/2-131 ALL CONDUIT IS EX C GENERAL N01 1. TRAFFIC SIGNAL nfN" L-, 11 111N. �, ,.,�� -- - -11- .- I ,- � -11.1-, ,, - -, " , - PROVISIONS, THE CITY OF FONTANA STANDARD PLANS AND SPECIFICATIONS, AND THE STATE OF CALIFORNIA STANDARD SPECIFICATIONS SECTION 86 AND STANDARD PLANS (DATED JULY 2002), 2. LOCATION OF ALL UNDERGROUND FACILITIES ARE APPROXIMATE. THE CONTRACTOR SHALL POTHOLE TO DETERMINE THE EXACT LOCATIONS AND VERIFY ALL CONDITIONS ON THE JOB SITE. HAND DIG FOUNDATIONS UNTIL CLEAR OF OBSTRUCTIONS. PHONE UNDERGROUND SERVICE ALERT AT 1-800-227-2600 TWO WORKING DAYS BEFORE DIGGING, 3. REUSE PULLBOXES AND CONDUIT UNLESS SHOWN OTHERWISE. ALL VEHICLE HEADS SHALL BE PER SPECIAL PROVISIONS. 4. CONTRACTOR SHALL COORDINATE ELECTRIC SERVICE DETAILS AND SCHEDULING WITH THE SOUTHERN CALIFORNIA EDISON COMPANY WELL IN ADVANCE OF NEED. 5. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE ENGINEER FOR EXACT EQUIPMENT LOCATIONS PRIOR TO FINAL PLACEMENT. 6. ALL REQUIRED CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA ENGINEERING DIVISION PRIOR TO COMMENCEMENT OF WORK. 7. ALL VEHICLE HEADS SHALL BE 12" WITH BACKPLATES, SEE SPECIAL PROVISIONS. e MAINTENANCE EASEMENT POLE SCHEDULE . L STANDARD MASTARMS LUMINAIRE PED PUSH BT. SIGNAL MOUNTING S.N.S. PLACFMFNT REMARK C TYPE HT. SIG. IUM, H.P.S.V. TYPE PHASE QUAD MAST ARM VEHICLE PED. MESSAGE A B 11 1—A 10 — — — B 6 E — TV -2—T SP-1—CS — 10.8' 2.8' 2 24-4-80 30 35' 15' 1 25OW B 4 N MAT, MAS SV -1—T SP-1—CS Slaver Ave 11.5 3.1' 3 1—A 10 — — — B 4 N — TV -2—T SP-1—CS — 10.8' 2.8' 4 24-4-80 30' 35' 15' 250W B 2 W MAT, MAS SV -1—T SP-1—CS Empire Center 11.2' 2.9' 5 1—A 10 — — — B 2 W — TV -2—T SP-1—CS — 8.2' 2.9' ----___- 6 24-4-80 30' 35' 15' 250W B 8 S MAS SV --1—T SP--1--CS Slover Ave 11.6' 3.0' 7 1—A 10 — — — B 8 S — TV -2—T SP-1—CS — 11.1' 2.9' - -- 8 29-5-80 3O' S0' 15' 250W B 6 E MAT, MAS, MAS SV -1—T SP-1—CS Empire Center Blvd 11.5' 2.6' OLA = 07 IA. AUTOCAD FILENAME: Slaver at Empire Center TS.dwg S: \traffic\Reggie\Plans\Opticom Upgrades\Slover at Empire Center\Slover at Empire Center TS.dwg PHASE 1 PHASE 2 PHASE 3 PHASE 4 FUTURE OLA PHASE 511 HASE 7 PHASE 8 OLA = 07 IA. AUTOCAD FILENAME: Slaver at Empire Center TS.dwg S: \traffic\Reggie\Plans\Opticom Upgrades\Slover at Empire Center\Slover at Empire Center TS.dwg