HomeMy WebLinkAbout3585-1CONDUCTOR TABLE
0
CIRCUIT OR
RUN5
1
2
3
4
5
6
7
8
9
AWG.
POLELU
H.P.W,
POLE U
PHASEI
QUAD
MAST ARM
VEHICLE
PED.
MESSAGE
A B
1
PPB POST
4'
-
-
B
2
W
-
-
-
-
POLErK
2
19-2-80
30'
25'
15'
1 25OW
-
-
-
MAS
SV -1-T
SP -1 -CS
-
AS DIMENSIONED
3
1-A
10
-
-
POLE
-
-
-
_
SV -1-T
SP -1 -CS
-
AS DIMENSIONED
4
19-2-80
30'
25
L, AND COATED STEEL}._,___ 25bit___.__,__,__,_____—_._._a_ __
_._ ._..__.. _._ __,_._._._ ____.___
B
6
E
MAS
SV -1-T
-
POLE
AS DIMENSIONED
1f1
1f1
1/1
7'-
-
-
B
6
E
_
-
TP -1-T
--
2.4'
4.2'
6
17-2-80
O
POLE
15'
250W
B
4
N
MAS
SV -1-T
SP -1 -CS
-
1.8'
5.9'
7
1-A
7'
-
-
-
B
4
N
POLE
-
TP -1 -T
-
AS DIMENSIONED
8
19-2-80
30'
25'
15'
250W
B
2
W
MAS
SV -1-T
SP -1-T
-
AS DIMENSIONED
U
POLE
0
0
POLE
TOTAL
1/1
2/3
2/3
2/3
4/4
4/4
3/3
2/2
6
ISERVICE-
10
ILUMINAIRE
2
2
2
12
—
2
2
2
2
QPTICQM CABLE
1
2
2
2
—
2
1 2
2
1
PHASE 1
—
—
—
—
—
—
-
—
PHASE 2—
PHASE 3
—
PHASE 4
—
—
—
—
—
—
—
—
—
DLC
PHASE 5
—
—
—
—
—
-
—
—
-
PHASE 6
—
2
2
—
2
—
—
—
—
PHASE 7
—
—
—
—
—
—
—
—
—
PHASE 8
—
—
—
TOTAL
—
2
2
—
3
—
—
—
CONDUIT SIZE
3
3"
3"
1 3"
2"
3"
3"
ALL CONDUIT IS EXISTING. REMOVE ALL EXISTING CONDUCTORS AND INSTALL NEW.
Lt I. C?N I..,. -9
CQ
h �,a
E 1. X. AG DIKE �
EOH KOH
R18-2
N
R2(35)
iAJ c
Ld
{
a c� of
i
j I
i'
i
—o6
Miry✓ (l 0
29' 39' 1
✓ 211,11" �' T
7
LOOPS SC -- R31
r 2 �I
UUUU SCHEDULE
0
STANDARD
MASTARMS
LUMINAIRE
PED PUSH RT.
_
=NAL MOUNTING
S.N.S.
PLACEMENT
REMARKS
C
TYPE
HT.
SIG.
LU M.
H.P.W,
TYPE
PHASEI
QUAD
MAST ARM
VEHICLE
PED.
MESSAGE
A B
1
PPB POST
4'
-
-
B
2
W
-
-
-
-
AS DIMENSIONED
2
19-2-80
30'
25'
15'
1 25OW
-
-
-
MAS
SV -1-T
SP -1 -CS
-
AS DIMENSIONED
3
1-A
10
-
-
_
-
-
-
_
SV -1-T
SP -1 -CS
-
AS DIMENSIONED
4
19-2-80
30'
25
L, AND COATED STEEL}._,___ 25bit___.__,__,__,_____—_._._a_ __
_._ ._..__.. _._ __,_._._._ ____.___
B
6
E
MAS
SV -1-T
-
-
AS DIMENSIONED
5
1-A
7'-
-
-
B
6
E
_
-
TP -1-T
--
2.4'
4.2'
6
17-2-80
30'
20'
15'
250W
B
4
N
MAS
SV -1-T
SP -1 -CS
-
1.8'
5.9'
7
1-A
7'
-
-
-
B
4
N
_
-
TP -1 -T
-
AS DIMENSIONED
8
19-2-80
30'
25'
15'
250W
B
2
W
MAS
SV -1-T
SP -1-T
-
AS DIMENSIONED
U ®(D
R/W
I
CL
-----
N
§ hC_k„F�_ 2 a
--
_._..
I ..
w CU
i
l t
t
2 -Ln
.. `y , ._. � . __ c
E/Pfl i N
EX. EP 2 I 08 1�
ALL EQUIPMENT
STRAIGHT LUMINAIRE MAST ARM
25"\q—- ----------(C.
. 1... AItii1 C;0A I`i°;i:) STEf-::E)--
EX. TEL SERVICE
GENE"L NOTES:
1. TRAFFIC SIGNAL AND LIGHTING SHALL CONFORM TO THESE PLANS, THE SPECIAL
PROVISIONS, THE CITY OF FONTANA STANDARD PLANS AND SPECIFICATIONS, AND
THE STATE OF CALIFORNIA STANDARD SPECIFICATIONS SECTION 86 AND STANDARD
PLANS (DATED JULY 2002).
2. LOCATION OF ALL UNDERGROUND FACILITIES ARE APPROXIMATE. THE CONTRACTOR
SHALL POTHOLE TO DETERMINE THE EXACT LOCATIONS AND VERIFY ALL CONDITIONS
ON THE JOB SITE. HAND DIG FOUNDATIONS UNTIL CLEAR OF OBSTRUCTIONS.
PHONE UNDERGROUND SERVICE ALERT AT 1-800-227-2600 TWO WORKING DAYS
BEFORE DIGGING.
3. REUSE PULLBOXES AND CONDUIT UNLESS SHOWN OTHERWISE. ALL VEHICLE HEADS
SHALL BE PER SPECIAL PROVISIONS.
4, CONTRACTOR SHALL COORDINATE ELECTRIC SERVICE DETAILS AND SCHEDULING
WITH THE SOUTHERN CALIFORNIA EDISON COMPANY WELL IN ADVANCE OF NEED.
5. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE ENGINEER FOR EXACT
EQUIPMENT LOCATIONS PRIOR TO FINAL PLACEMENT.
6. ALL REQUIRED CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF
FONTANA ENGINEERING DIVISION PRIOR TO COMMENCEMENT OF WORK.
7• ALL VEHICLE HEADS SHALL BE 12" WITH BACKPLATES, SEE SPECIAL PROVISIONS.
EO
t
I
�00P SG�
i
1
r^ r`
I
I
I
06 iFr,, O
I �
® I
1 2 —
I ; 26 i
E-;� 41
2
ItI
9
I I I I
I
V R. I 15'
i L
167
i II
j 11 Y �I
I � i
0
ce w ( W
20 10 0 20 40 00
mom
BARRIER
PHASE
DIAGRAM
NOT
USED
NOT
USED
_._.- Lc __., _ ...___ ... _.__ _ ...
00-
PHASE 1
PHASE 2
PHASE 3
PHASE 4
NOT
USED
f
8
I
NOT
USED
E P
PHASE 5
PHASE 6
PHASE7
PHASE 8
Curb/Berm flow lir
or edge of should(
BCR
F111 11 2M
CONSTRUCTION NOTES:
EXISTING TYPE 90 CONTROLLER IN TYPE P CABINET. INSTALL AUXILLARY EQUIPMENT AS NECESSARY TO
PROVIDE FOR THE OPERATIONS SHOWN.
INSTALL CITY FURNISHED UNIDIRECTIONAL OPTICAL DETECTOR PER DETAILS SHOWN ON THIS SHEET
AND AS DIRECTED BY THE ENGINEER,
LEGEND:
UNI—DIRECTIONAL, SINGLE CHANNEL OPTICAL DETECTOR
Q)
I
AUTOOAD FILENAME: Baseline at Oleander TS.dwg
S: \traffic\Reggie\Plans\Opticom Upgrades\Baseline Oleander\Baseline at Oleander TS.dwg
R/W
!.,(.aha _._. _ .,_,_.. _ _.. __..
_._.- Lc __., _ ...___ ... _.__ _ ...
00-
_
____,__._---
6" _,__.W__ _._._._.________._Ilk
6"G
E P
et-
_ _ ... --
i�
Q--
E P
- -._,.._.__.__
"
.,xi
L, AND COATED STEEL}._,___ 25bit___.__,__,__,_____—_._._a_ __
_._ ._..__.. _._ __,_._._._ ____.___
..
uy____
.. ..__..__.,_,.__,...__.._....._................._.....,.__..__..._.......,__._,_....,.._...-
w.........__......—._.
5'W_...__.._L_
AND COATED STEEL)—
CONSTRUCTION NOTES:
EXISTING TYPE 90 CONTROLLER IN TYPE P CABINET. INSTALL AUXILLARY EQUIPMENT AS NECESSARY TO
PROVIDE FOR THE OPERATIONS SHOWN.
INSTALL CITY FURNISHED UNIDIRECTIONAL OPTICAL DETECTOR PER DETAILS SHOWN ON THIS SHEET
AND AS DIRECTED BY THE ENGINEER,
LEGEND:
UNI—DIRECTIONAL, SINGLE CHANNEL OPTICAL DETECTOR
Q)
I
AUTOOAD FILENAME: Baseline at Oleander TS.dwg
S: \traffic\Reggie\Plans\Opticom Upgrades\Baseline Oleander\Baseline at Oleander TS.dwg